Regulation of British Columbia
Municipal Wastewater Regulation
- Citation
- B.C. Reg. 87/2012
- Last amended
- October 27, 2025
- Read from BC Laws
- November 17, 2026
- Made under
- Environmental Management Act, SBC 2003, c. 53
- Official text
- BC Laws ↗
Contents 121 entries
Part 1 — Interpretation and Authorization to Discharge
Division 1 — Interpretation
1 Definitions 2 Calculation of ADWF and dilution ratio 3 Municipal effluent quality requirements not to be exceededDivision 2 — Authorization to Discharge
4 Application 5 Persons who may discharge or provide reclaimed water 6 Prohibited or limited discharges 7 Discharge of non-domestic wastePart 2 — Initial Administrative Requirements
Division 1 — Substituting Requirements
8 Director may substitute requirements 9 Director must act in writingDivision 2 — Registration
10 Registration 11 Administrative information 12 Technical information 13 Information respecting wastewater facility design, plans and studies 14 Proof of certain matters 15 Certification by qualified professionals 16 Changes to registration 17 Suspension or cancellation of registrationDivision 3 — Environmental Impact Studies
18 When environmental impact study required 19 Requirements for environmental impact studies 20 Receiving environment monitoring program 21 Environmental impact study if overflowsDivision 4 — Operating Plans
22 Municipal wastewater collection systems excluded 23 General requirements of operating plans 24 Commissioning plan 25 Contingency plan 26 Irrigation planDivision 5 — Security and Assurance Plans
27 Application 28 Maintenance of security 29 Security 30 Use of security and capital replacement fund 31 Assurance planPart 3 — General Design and Construction Requirements
Division 1 — General Matters
32 Qualified professionals 33 Wastewater facilities 34 Reliability categories for wastewater facilities 35 General component and reliability requirements 36 Additional component and reliability requirements 37 Pumping facility requirements 38 Combined sewers 39 Septic tanks 40 Construction of facilityDivision 2 — Overflows, and Inflow and Infiltration Requirements
41 Definitions and extension of dates 42 Overflows 43 Use of storage or conveyance facilities 44 Inflow and infiltrationPart 4 — General Operating Requirements
Division 1 — General Operating Requirements
45 Before discharge begins 46 Notification of discharge 47 Operator qualifications and certification 48 Operating plan 49 Bypasses 50 MalfunctionsDivision 2 — General Municipal Effluent Requirements
51 Water quality standards 52 Disinfection and chlorinationDivision 3 — General Monitoring Requirements
53 Monitoring required 54 Monitoring facilities and devices 55 General monitoring requirements 56 Sampling schedule and requirements 57 Sampling and analysis 58 Toxicity monitoring requirements 59 Determining toxicity 60 Failed water toxicity testsDivision 4 — Ongoing Administrative Requirements
61 Further payments required 62 Records respecting septic tank pump outs 63 Information and records to be retained 64 Notice of assurance plan lapse 65 Annual report respecting assurance plans 66 Reports respecting discharge to ground and water 67 Annual reports respecting reclaimed waterPart 5 — Specific Requirements for Discharge to Ground
Division 1 — General Requirements
68 Application and interpretation 69 Municipal effluent classes 70 Discharge 71 Initial dilution zone 72 Subsurface travel time 73 Surfacing of discharge 74 Calculating flow 75 Municipal effluent quality requirements 76 Unsaturated soil depth 77 Advanced treatment requirementsDivision 2 — Drainfields
78 Drainage pipe length requirements 79 Reductions in drainage pipe length 80 Drainage pipes 81 Drain fields 82 Setback requirementsDivision 3 — Infiltration Basins, Sand Mounds and Seepage Beds
83 Infiltration basins 84 Sand mounds and seepage bedsDivision 4 — Monitoring
85 Monitoring wells 86 Monitoring requirements for discharges to ground 87 Additional monitoring requirements 88 Continuous monitoring systemPart 6 — Specific Requirements for Discharge to Water
Division 1 — General Requirements
89 Application and interpretation 90 Discharge 91 Initial dilution zone for water generally 92 Initial dilution zone for marine waters and lakes 93 Initial dilution zone for streams, rivers and estuaries 94 Municipal effluent quality requirements 95 If maximum daily flow ≥ 50 m3/d 96 Allowable fecal coliform organisms 97 Advanced treatment requirements 98 Enhanced environmental impact study neededDivision 2 — Outfalls
99 Outfall requirements 100 Additional outfall requirements for estuaries, lakes and marine waters 101 Marking of outfalls 102 Inspection of outfallsDivision 3 — Monitoring
103 Monitoring requirements for discharges to waterPart 7 — Reclaimed Water Requirements
Division 1 — General Requirements
104 Categories of reclaimed water 105 Authorization to provide reclaimed water 106 Indirect potable reuse of reclaimed water 107 Initial dilution zones not applicable 108 Municipal effluent quality requirements for reclaimed water 109 Additional requirements if exposure potential 110 Additional requirements if greater exposure potential 111 Additional requirements if moderate exposure potential 112 Additional requirement if moderate or low exposure potential 113 Disinfection of reclaimed waterDivision 2 — Alternate Disposal or Storage, and Distribution
114 Alternate disposal or storage 115 Failure to meet municipal effluent quality requirements 116 Use of emergency storage 117 Distribution of reclaimed waterDivision 3 — Monitoring
118 Monitoring requirements for reclaimed water 119 Continuous monitoring systemPart 8 — Offences and Penalties
120 Offences and penalties 121 Transition — registrations under the Municipal Sewage Regulation