Municipal Wastewater Regulation, B.C. Reg. 87/2012

Section 74

Calculating flow

Cite as Municipal Wastewater Regulation, B.C. Reg. 87/2012, s. 74 · last amended October 27, 2025 · read from BC Laws on November 17, 2026

The text

(1) A qualified professional must determine the calculated or actual maximum daily flow. (2) A qualified professional may use the actual maximum daily flow to design the wastewater facility if (a) the actual daily flow is equal to or greater than 37 m3/d, (b) water conservation measures are used, and (c) a restrictive covenant is placed on each property requiring that water conservation measures are continuously used. (3) If actual maximum daily flow is used under subsection (2), daily discharge volume monitoring is required.
Read the Municipal Wastewater Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.