Municipal Wastewater Regulation, B.C. Reg. 87/2012
Section 93
Initial dilution zone for streams, rivers and estuaries
Cite as Municipal Wastewater Regulation, B.C. Reg. 87/2012, s. 93 · last amended October 27, 2025 · read from BC Laws on November 17, 2026
The text
(1) For the purpose of calculating the initial dilution zone for a stream, river or estuary, all of the following, measured from the point of discharge and from mean low water, apply:
(a) the height is the distance from the bed to the water surface;
(b) the width, perpendicular to the path of the stream, is the lesser of
(i) 100 m, and
(ii) 25% of the width of the stream or estuary;
(c) the length, parallel to the path of the stream, is the distance between a point 100 m upstream and a point that is the lesser of
(i) 100 m downstream, and
(ii) a distance downstream at which the width of the municipal effluent plume equals the width determined under paragraph (b).
(2) For estuaries,
(a) the stream flow is the fresh water content, and
(b) the initial dilution zone must not extend closer to shore than mean low water.
Read the Municipal Wastewater Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.