Municipal Wastewater Regulation, B.C. Reg. 87/2012

Section 37

Pumping facility requirements

Cite as Municipal Wastewater Regulation, B.C. Reg. 87/2012, s. 37 · last amended October 27, 2025 · read from BC Laws on November 17, 2026

The text

In designing pumping facilities, a qualified professional must ensure that all of the following requirements are met: (a) there are at least 2 pumps, with each pump capable of pumping peak design flows; (b) for pumping stations requiring multiple pumps, the station must have sufficient capacity to pump peak design flow when the largest pump is out of service; (c) for a 2-pump station, a receptacle for a portable generator must be available for standby power; (d) for a multiple pump station, an on-site generator must be available for standby power; (e) standby power must be capable of being activated before the hydraulic capacity of the pump station is exceeded.
Read the Municipal Wastewater Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.