Municipal Wastewater Regulation, B.C. Reg. 87/2012

Section 45

Before discharge begins

Cite as Municipal Wastewater Regulation, B.C. Reg. 87/2012, s. 45 · last amended October 27, 2025 · read from BC Laws on November 17, 2026

The text

A discharger must not discharge until ensuring that all of the following requirements are met: (a) the design of the wastewater facility meets, and is capable of consistently meeting, (i) the requirements of this regulation, or (ii) the requirements, if any, substituted under section 8 [director may substitute requirements]; (b) a qualified professional having expertise in the particular aspect of the design has undertaken (i) the flow calculation, (ii) the wastewater facility design, and (iii) an inspection to ensure that the construction methods and materials, and the wastewater facility as constructed, meet the design criteria; (c) the wastewater facility is classified under the EOCP.
Read the Municipal Wastewater Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.