Regulation of British Columbia
Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation
- Citation
- B.C. Reg. 104/2004
- Last amended
- December 31, 2024
- Read from BC Laws
- November 17, 2026
- Made under
- Safety Standards Act, SBC 2003, c. 39
- Official text
- BC Laws ↗
Contents 91 entries
1
Definitions for the Act
2
Definitions and interpretation for this regulation
3
Application of this regulation
3.1
Relation to the Safety Standards General Regulation
4
Adoption of codes and standards
Part 1 — General Qualification and Licensing Provisions
Division 1 — Individuals Who May Perform Regulated Work under This Regulation
5 Individuals who may perform regulated work 6 Exemption from certification requirement to operate certain equipmentDivision 2 — Certificates of Qualification
7 Certificate of qualification 8 Repealed 9 Marine engineer (steam) certificate of competency 10 Repealed 11 Duties of certain engineers and operators 12 Repealed 13 Application for first class power engineer's certificate of qualification 14 Repealed 15 Application for second class power engineer's certificate of qualification 16 Repealed 17 Application for third class power engineer's certificate of qualification 18 Repealed 19 Application for fourth class power engineer's certificate of qualification 20 What a first, second, third or fourth class power engineer may do 21 Fourth class or higher engineer may do limited electrical work 22 Limited regulated gas work by power engineers 23 Fifth class power engineer's certificate of qualification 24 What a fifth class power engineer may do 25 Refrigeration operator's certificate of qualification 26 What a refrigeration operator may do 27 Interim certificates of qualification 28 Application for category "A" interim power engineer's certificate of qualification 29 Application for category "B" interim power engineer's certificate of qualification 30 Repealed 31 Application procedure for an oil well boiler operator's certificate of qualification 32 What an oil well boiler operator may do 33 Application for antique show boiler operator's certificate of qualification 34 What an antique show boiler operator may do 35 Application for ice facility operator's certificate of qualification 36 What an ice facility operator may do 37 Application for boiler safety awareness certificate of qualification 38 What the holder of a boiler safety awareness certificate of qualification may do 39 Application for refrigeration safety awareness certificate of qualification 40 What a refrigeration safety awareness certificate of qualification holder may do 41 Application for pressure welder's certificate of qualification 42 What a pressure welder may do 43 Posting and proof of certificates 43.1 Certificates of qualification having no expiry date 43.2 Transition — pressure welder certificates of qualificationDivision 3 — Plant Classifications
44 Plant classifications 45 Continuous supervision status plant operation 46 Determination of boiler capacity 46.1 Determination of refrigeration plant capacity 47-53 Repealed 54 Special plant registration and operation 55 General supervision status plant registration and operation 56 Risk assessed status plant registration and operationDivision 4 — Contractor's Licence
57 Contractor's licence required to perform regulated work under installation permit 58 Bond not required for contractor's licence 59 Field safety representative not required for boiler contractor's licence 60 Application for contractor's licence 61 General duties of a licensed contractorPart 2 — Requirements for Permits, Regulated Products and Inspections by Safety Officers
Division 1 — Permit Requirements
62 Permits 62.1 Operating permit for plant required 62.2 Transition — operating permits for plants 63 When permit not required for regulated workDivision 2 — Inspections by Safety Officers
64 Preparation of equipment for inspectionPart 3 — Safety Officers
65 Requirements for a certificate of qualification as a safety officerPart 4 — Incident Reporting
66 Duty to report incidents in plantsPart 5 — Technical Requirements
Division 1 — Person in Charge of Plant
67 General requirements for person in charge of a plant 68 Chief engineer requirements 69 Person in charge to give permission before work can beginDivision 2 — Obligations of Owners and Licensed Contractors
69.1 Duties of owners requiring plant operating permits 70 Owner to designate shift engineer during temporary absence of chief engineer 71 Owner not to require persons to perform dangerous work 72 Owners and licensed contractors to keep records 73 Duty to ensure sufficient combustion air supply to boilers 74 Owner responsible for safety in a plant 75 Duties of owners of steam driven engines 76 Duties of owners of chemical recovery boilers 77 Duties of owners of boilers and pressure vessels 78 Welding and brazing procedures must be to code and registered 79 Duties of owners of certain plants 80 Boiler safety awareness certificate and annual service report requirement 81 Refrigeration safety awareness certificate and annual service report requirementDivision 3 — Registration, Approvals and Notification of Purchase or Disposition
82 Design registration and inspection requirements 83 Repealed 84 Registration of boiler, pressure vessel, fitting and pressure piping design 84.1 Registration of control systems 85 Boiler fuel systems to be registered on request 86 No repairs to boilers or pressure vessels unless approved 87 No alterations to boilers or pressure vessels unless registeredDivision 4
88 Repealed Schedule 1 Schedule