Duties of owners of chemical recovery boilers
Cite as Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004, s. 76 · last amended December 31, 2024 · read from BC Laws on November 17, 2026
The text
(1) The owner of a plant must ensure that every chemical recovery boiler in the plant is operated in accordance with the applicable provisions of the codes and standards set out in the Schedule to this regulation.
(2) The owner of a plant must ensure that the instruments and controls that are necessary for the safe operation and emergency shutdown of a chemical recovery boiler are located in the control room of the plant.
(3) The owner of a plant must not permit the operation of a chemical recovery boiler in the plant unless there is compliance with all of the following:
(a) procedures that will ensure the safe evacuation of all plant employees and the safe shutdown of the plant during an emergency have been
(i) sent to a provincial safety manager at least one month before the boiler is used, and
(ii) posted as near as possible to the operating panel of the chemical recovery boiler;
(b) the chemical recovery boiler has a rapid drain system that has worked during tests that were conducted in the manner required by a safety officer;
(c) a device that continuously monitors and records the firing concentration of the black liquor in the chemical recovery boiler has been installed
(i) after the last connection if contamination by a substance that would dilute the black liquor could occur, and
(ii) before the burner spray nozzles;
(d) equipment has been installed that is separate from and that tests the device referred to in paragraph (c);
(e) an audible boiler low water level alarm is fitted to the chemical recovery boiler, which alarm can only be cancelled after the condition that caused the alarm to sound has been acknowledged and, if not corrected within 60 seconds, will sound again until corrected;
(f) a communication system between personnel in the plant and the power engineer in the control room is functioning
(g) the dissolving tanks of the chemical recovery boiler are
(i) constructed in accordance with industry recommended safe design practices, and
(ii) vented with explosive relief devices that, when used, ensure that the dissolving tanks are safe;
(h) an emergency spout-cooling water make-up is installed on water cooled spouts.
(4) The owner of a chemical recovery boiler must ensure that the power engineer who is placed in immediate charge of the chemical recovery boiler, and who is responsible to the shift engineer for the safe and efficient operation of the chemical recovery boiler, is the holder of a first, second or third class power engineer's certificate of qualification.