Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004
Section 62.1
Operating permit for plant required
Cite as Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004, s. 62.1 · last amended December 31, 2024 · read from BC Laws on November 17, 2026
The text
(1) An owner must hold an operating permit for each of the following types of plants:
(a) a first class plant, a second class plant, a third class plant, a fourth class plant and a fifth class plant;
(b) an oil well plant.
(2) Despite subsection (1), a provincial safety manager may direct that one operating permit is required if the provincial safety manager is satisfied that
(a) 2 or more plants are located on the same premises, and
(b) separate operating permits are not required for the purpose of ensuring that the objectives of the Act and this regulation are met.
(3) An applicant for an operating permit must provide to a provincial safety manager
(a) a record identifying
(i) the location of the plant and all related plants, if any,
(ii) the classification, type and total capacity of the plant, and
(iii) all boilers, pressure vessels and ancillary equipment that form part of the plant, and
(b) any further information required by the provincial safety manager.
Read the Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation on BC Laws ↗
Made under Safety Standards Act, SBC 2003, c. 39.