Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004

Section 56

Risk assessed status plant registration and operation

Cite as Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004, s. 56 · last amended December 31, 2024 · read from BC Laws on November 17, 2026

The text

(1) A provincial safety manager may register a plant as a risk assessed status plant if the plant (a) is a fluid heating plant or low pressure thermal fluid plant not exceeding 500 m2 of boiler capacity, (b) is a low temperature, low pressure fluid plant that does not exceed 2 000 m2 of boiler capacity, (c) is an unfired plant not exceeding 1 000 m2 of boiler capacity, (d) is a refrigeration plant not exceeding a total plant capacity of 1 000 kW prime mover nameplate rating, or (e) meets all the administrative and technical specifications issued by a provincial safety manager after a successful review. (2) A plant operating under the risk assessed status plant category must, as a minimum, have a power engineer with the appropriate certificate of qualification who (a) is on the premises of the plant not less than 7 hours per day or such greater time as may be required by a provincial safety manager, and (b) inspects the plant in accordance with conditions established by a provincial safety manager as part of the registration under section 55.
Read the Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation on BC Laws ↗

Made under Safety Standards Act, SBC 2003, c. 39.