Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004
Section 22
Limited regulated gas work by power engineers
Cite as Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation, B.C. Reg. 104/2004, s. 22 · last amended December 31, 2024 · read from BC Laws on November 17, 2026
The text
(1) The chief power engineer of a first or second class plant may, for the purposes of carrying out maintenance and repairs on a boiler, shut off and place back into service the gas system of the plant including, but not limited to, downstream of the service meter up to and including the burners.
(2) The chief power engineer of a third or fourth class plant may, for the purpose of carrying out maintenance on a boiler, disconnect the gas line to a boiler, up to and including the burners, and reconnect the line once the maintenance is complete.
Read the Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation on BC Laws ↗
Made under Safety Standards Act, SBC 2003, c. 39.