Regulation of Canada

Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations

Statute Watch

Get an alert when a bill in Parliament would change this regulation, and every time it moves.

Citation
SOR/2025-88
Current to
July 24, 2025
Last amended
July 5, 2025
Made under
Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33
Official text
Justice Laws Website ↗

Bills in Parliament that would change it 0

No bill we hold would amend or repeal it.

Contents 138 entries

Interpretation

1 Definitions

Application

2 Application — facilities 3 Upgrading facilities — application 4 Distance of occupied building 5 Non-application — equipment

General Provisions

Identification of Equipment and Instruments

6 Identifier of equipment

Service Status

7 Tank 8 Loading rack 9 Vapour control system 10 Intermittent service tanks 11 Surge tanks

Designation

12 Tanks 13 Loading racks 14 Designation process

Internal Volume of Tank

15 Internal volume

Loading

16 Loading factors 17 Vehicle-to-vehicle loading

Sampling and Testing

Operator Responsibility

18 Requirements

Properties of Liquids

19 Immiscible phases 20 Gasoline

Methods for Sampling Liquids

21 Sampling method included 22 Qualified professional

Test Methods

23 Vapour pressure 24 Benzene concentration 25 VOC concentrations — liquids 26 VOC concentrations — vapour 27 Instruments – use and calibration 28 Combustible gas detector — requirements 29 Qualified professional

Alternative Test Methods

30 Application to the Minister 31 Acceptance of alternative test method 32 Publication of accepted alternative methods

VOC Emissions Control

Emissions Control Equipment

33 Emissions control equipment 34 Not in service 35 Required training 36 Flare

Tanks

37 Emissions control equipment 38 Vapour control system 39 Volatile petroleum liquid tank 40 Small volatile petroleum liquid tank 41 Position of liquid inlet

Loading Racks

42 Vapour control systems

Temporary Vapour Control System

43 Temporary vapour control system

High Benzene Tanks

Existing High Benzene Tanks

44 Use of floating roof 45 Fenceline monitoring program 46 Conditions not met 47 Reports 48 Exceedance report

Action Plan

49 Action plan

Design and Use of Emissions Control Equipment

Vapour Control Systems

50 Loading of gasoline to trucks 51 Design specifications 52 Design, use and maintenance 53 Free of leaks 54 Continuous monitoring device 55 Standard operating procedures 56 Operation 57 Performance — emissions 58 Performance — temporary or existing systems 59 Compatible fittings

Internal Floating Roofs

60 Installation 61 Float on surface of liquid 62 Multiple floatation compartments 63 Exposed seams 64 Continuous vapour-tight enclosure 65 Gap between seal and wall of tank 66 Openings 67 Rims 68 Materials

External Floating Roofs

69 Installation 70 Float on surface of the liquid 71 Multiple floatation compartments 72 Exposed seams 73 Continuous vapour-tight enclosure 74 Gap between seal and wall of tank 75 Openings 76 Rims 77 Materials

Pressure-Vacuum Vents

78 Requirements 79 Ventilation

Alternative Emissions Control Equipment

80 Application for permit 81 Issuance 82 Permit — refusal 83 Renewal of permit 84 Notice to Minister 85 Modification of permit

Inspection, Testing and Repair

Vapour Control Systems

Inspections and Tests

86 Monthly inspection 87 Performance test — defects 88 Performance test — modifications 89 Vapour balancing system — test

Repair

90 Repair — deadline

Internal Floating Roofs and External Floating Roofs

Inspection of Internal Floating Roof

91 Monthly inspection 92 Baseline LEL% 93 Inspection every 20 years

Inspection of External Floating Roof

94 Monthly inspection 95 Annual inspection 96 Inspection every five years 97 Measurement of seal gap 98 Inspector certificate

Other Requirements

99 Reduced inspection intervals

Repair

100 Repair — tank in service 101 Major defects 102 Defects — existing tanks

VOC Emissions Minimization Plan

103 Plan

Pressure-Vacuum Vent

Inspection

104 Pressure-vacuum vent

Repair

105 Defect detected

Extended Repair Plan

106 Reasons

Approvals

107 Federal, provincial or municipal approval

Inventory

108 Inventory

Record-Keeping

Records

109 Emissions control equipment 110 Tanks 111 Fenceline monitoring program 112 Loading racks 113 Sample of liquids 114 Instrument and continuous monitoring device 115 Measurements and calculations 116 Units of measurement 117 Person performing sampling 118 Person designated as operator 119 Person designated as authorized official 120 Notices, plans and reports 121 Information submitted electronically 122 Minister’s request — records

Retention of Records

123 Information recorded

Registration of Facility

124 Report of registration

Deferred Application to Existing Tanks and Existing Loading Racks

125 Designation 126 Fourth year — existing tanks 127 Fifth year — existing tanks 128 Sixth year — existing tanks 129 Seventh year — existing tanks 130 Eighth year — no existing tanks

Transitional Provisions

131 Existing vapour control systems 132 Existing tanks — internal floating roofs 133 First anniversary — existing tanks 134 Existing high benzene tanks 135 Third anniversary — existing tanks 136 Fourth anniversary

Consequential Amendment to the Regulations Designating Regulatory Provisions for Purposes of Enforcement (Canadian Environmental Protection Act, 1999)

137 [Amendments]

Coming into Force

138 Registration