Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations, SOR/2025-88
Section 95
Annual inspection
Cite as Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations, SOR/2025-88, s. 95 · current to July 24, 2025 · regulation last amended July 5, 2025
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) The operator of a facility must ensure that the upper surface of each external floating roof at the facility is visually inspected annually – no less than 10 months after the day on which the previous inspection was performed – for the defects referred to in paragraphs 100(5)(a), (c) and (e) to (h) and must ensure that the secondary seal gaps are measured annually under the control conditions and in accordance with the procedure described in Schedule 4.
(2) The inspection of an opening of the external floating roof deck, as part of the visual inspection referred to in subsection (1), must be performed from a distance of no more than two metres from the opening.
Read the Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations on the Justice Laws Website ↗
Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.