Regulation of British Columbia
Geothermal Operations Regulation
- Citation
- B.C. Reg. 79/2017
- Last amended
- September 1, 2023
- Read from BC Laws
- November 17, 2026
- Made under
- Geothermal Resources Act, RSBC 1996, c. 171
- Official text
- BC Laws ↗
Contents 48 entries
Part 1 — Definitions
1 DefinitionsPart 2 — Geothermal Exploration
2 NotificationPart 3 — Application for Well Authorization
3 Well authorization applicationPart 4 — Wells and Production Facilities
Division 1 — All Wells
4 Well names 5 Position of wells 6 Notification of well construction and drilling operations 7 Well site signs 8 Protection from hazards 9 Well control equipment 10 Testing of well control equipment 11 Drilling fluid system 12 Well control 13 Personnel 14 Records 15 Tools, casing, equipment and materials 16 Wellhead requirements 17 Management of substances 18 Inactive or suspended wells 19 Plugging requirements for wells 20 Pulling casing 21 Disposal of drilling and production material 22 Tour sheets and drilling operations reports 23 Deviation and directional surveys 24 Well reports 25 Fire prevention 26 FencingDivision 2 — Additional Requirements for Geothermal Wells
27 Spacing of wells 28 Hydraulic fracturing operations 29 Induced seismicity 30 Hydraulic isolation 31 Casing requirements 32 Surface and subsurface equipment 33 Completion and workover reports 34 Fracturing fluids records 35 Samples and cores 36 Analyses and dataDivision 3 — Additional Requirements for Thermal Gradient Wells
37 ReportingDivision 4 — Production Facilities
38 Notice 39 RequirementsPart 5 — Production
40 Measurements 41 Injection and disposal 42 Production data 43 Report of geothermal productionPart 6 — General
44 Well authorization expiry 45 Suspension or revocation 46 Fee for certificate of restoration 47 Security 48 Exemption