Geothermal Operations Regulation, B.C. Reg. 79/2017
Section 15
Tools, casing, equipment and materials
Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 15 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
A well authorization holder must ensure that all tools, casing, equipment and materials are
(a) fit for purpose,
(b) in good condition, and
(c) operated or installed in accordance with manufacturer's specifications or sound engineering practices.
Read the Geothermal Operations Regulation on BC Laws ↗
Made under Geothermal Resources Act, RSBC 1996, c. 171.