Geothermal Operations Regulation, B.C. Reg. 79/2017

Section 6

Notification of well construction and drilling operations

Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 6 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

(1) It is a condition of a well authorization that the holder must notify the regulator, in electronic form, before doing any of the following: (a) beginning the construction of infrastructure associated with a well; (b) beginning the drilling of a well; (c) releasing a rig, if drilling is completed or temporarily suspended; (d) resuming drilling operations after a temporary suspension; (e) completing or recompleting a well; (f) performing a workover on a well; (g) installing, removing or repairing wellbore equipment, including plugs, packers, tubing, casing, artificial lift or subsurface safety valves; (h) plugging a portion of a well. (2) Notice under subsection 1 (a) must be provided at least 7 days before construction is to begin, and notice under subsection 1 (b) to (h) must be provided at least 24 hours before the action is taken.
Read the Geothermal Operations Regulation on BC Laws ↗

Made under Geothermal Resources Act, RSBC 1996, c. 171.