Geothermal Operations Regulation, B.C. Reg. 79/2017
Section 9
Well control equipment
Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 9 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) A well authorization holder must ensure that, during all well operations, reliably operating well control equipment is installed to control kicks, prevent blowouts or artesian flows and safely carry out all well operations.
(2) If a well barrier fails, the well authorization holder must ensure that no other activities, other than those intended to restore or replace the barrier, take place in the well.
(3) A well authorization holder must design and implement a pressure control system capable of managing all anticipated pressure environments during well operations.