Geothermal Operations Regulation, B.C. Reg. 79/2017

Section 19

Plugging requirements for wells

Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 19 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

(1) A well authorization holder must submit to the regulator, at least 7 days before beginning well operations, a plan for well plugging addressing the matters referred to in subsection (2). (2) When plugging a well, the well authorization holder must plug the well in a manner that ensures all of the following: (a) adequate hydraulic isolation is established between porous zones; (b) fluids will not leak from the well; (c) excessive pressure will not build up within any portion of the well; (d) long-term integrity of the wellbore is maintained. (3) A well authorization holder must submit to the regulator, within 30 days of abandoning a well, an abandonment report detailing all operations, treatments, tests and any resulting well behaviour, including a downhole schematic diagram.
Read the Geothermal Operations Regulation on BC Laws ↗

Made under Geothermal Resources Act, RSBC 1996, c. 171.