Geothermal Operations Regulation, B.C. Reg. 79/2017
Section 37
Reporting
Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 37 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) Not more than 3 months after the date of rig release of the drilling rig from a thermal gradient well, a well authorization holder must submit a report to the regulator containing the following information:
(a) the location of the thermal gradient well drilled relative to the nearest corner of the legal subdivision or quarter unit in which the thermal gradient well is positioned;
(b) the ground elevation of the thermal gradient well drilled, in metres, above sea level;
(c) the total depths, in metres, of the thermal gradient well;
(d) a report of any lost circulation zones encountered during the drilling of the thermal gradient well.
(2) The well authorization holder must submit to the regulator one copy of each log, including temperature measurements, taken at a thermal gradient well within 30 days after the date the log or measurement was taken.
(3) Repealed. [B.C. Reg. 214/2020, s. (b).]
Read the Geothermal Operations Regulation on BC Laws ↗
Made under Geothermal Resources Act, RSBC 1996, c. 171.