Geothermal Operations Regulation, B.C. Reg. 79/2017
Section 22
Tour sheets and drilling operations reports
Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 22 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) A well authorization holder of a well being drilled must
(a) ensure that a daily drilling report (tour sheet) is kept at the well site,
(b) if a kick occurs during drilling operations, notify the regulator immediately and submit a written kick report to the regulator within one day of the incident,
(c) submit a copy of the daily drilling report (tour sheet) to the regulator within 30 days of rig release,
(d) submit a summary report of drilling operations to the regulator within 4 days of the following:
(i) the date the rig is released;
(ii) the date drilling operations have been suspended.
(2) A daily drilling report (tour sheet) kept under subsection (1) (a) must set out complete data on all operations performed during the one day.
Read the Geothermal Operations Regulation on BC Laws ↗
Made under Geothermal Resources Act, RSBC 1996, c. 171.