Geothermal Operations Regulation, B.C. Reg. 79/2017
Section 32
Surface and subsurface equipment
Cite as Geothermal Operations Regulation, B.C. Reg. 79/2017, s. 32 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) A well authorization holder must ensure that subsurface equipment of the well enables the ready measurement of the tubing pressure, production casing pressure and surface casing pressure.
(2) A well authorization holder must ensure that surface equipment includes equipment necessary for production sampling and tests.
(3) A well authorization holder must keep a record listing all subsurface equipment in the well at all times prior to abandonment.
Read the Geothermal Operations Regulation on BC Laws ↗
Made under Geothermal Resources Act, RSBC 1996, c. 171.