United States Code
16 U.S.C. § 824s
Transmission infrastructure investment
Statute Watch
Get an alert when any bill in Congress would change this law — and every time it moves.
Bills that would change it 54
- HR 10809 Make Data Centers Pay Act Amends its part · in committee · 119th Congress
- S 5653 Bipartisan American Affordability and Jobs Act of 2026 Amends 824s(b)(4) · in committee · 119th Congress
- HR 10579 Energy Cost Fairness and Reliability Act of 2026 Amends its part · in committee · 119th Congress
- HR 10539 Integrated Local, Regional, and Interregional Transmission Planning Act of 2026 Amends its part · in committee · 119th Congress
- HR 9843 Enhancing Electric Grid Resilience Act Amends its part · in committee · 119th Congress
- S 5008 Grid Connection and Congestion Management Act Amends its part · in committee · 119th Congress
- S 4559 Energy Cost Fairness and Reliability Act of 2026 Amends its part · in committee · 119th Congress
- S 3947 REWIRE Act Amends · in committee · 119th Congress
- HR 7977 Energy Bills Relief Act Amends 824s(b)(4)(B) · in committee · 119th Congress
- HR 7729 SURGE Act of 2026 Amends · in committee · 119th Congress
- HR 5600 SPEED and Reliability Act of 2025 Amends 824s(b)(4) · in committee · 119th Congress
- HR 3843 Baseload Reliability Protection Act Amends its part · in committee · 119th Congress
- HR 603 Reinforcing the Grid Against Extreme Weather Act of 2025 Amends its part · in committee · 119th Congress
- HR 9362 Reinforcing the Grid Against Extreme Weather Act of 2024 Amends its part · in committee · 118th Congress
- S 4753 Energy Permitting Reform Act of 2024 Amends 824s(b)(4) · in committee · 118th Congress
- HR 6747 Clean Electricity and Transmission Acceleration Act of 2023 Amends 824s(b)(4)(B) · in committee · 118th Congress
- S 2915 Enhancing Electric Grid Resilience Act Amends its part · in committee · 118th Congress
- HR 5551 BIG WIRES Act Amends its part · in committee · 118th Congress
- S 2827 BIG WIRES Act Amends its part · in committee · 118th Congress
- HR 5154 CHARGE Act of 2023 Amends its part · in committee · 118th Congress
- S 2480 CHARGE Act of 2023 Amends its part · in committee · 118th Congress
- HR 1766 SITE Act Amends its part · in committee · 118th Congress
- S 1399 Building American Energy Security Act of 2023 Amends 824s(b)(4) · in committee · 118th Congress
- HR 2750 Enhancing Electric Grid Resilience Act Amends its part · in committee · 118th Congress
- S 946 SITE Act Amends its part · in committee · 118th Congress
- HR 9326 Enhancing Electric Grid Resilience Act Amends its part · in committee · 117th Congress
- HR 1512 CLEAN Future Act Amends its part · in committee · 117th Congress
- S 3879 CHARGE Act of 2022 Amends its part · in committee · 117th Congress
- HR 4971 SITE Act Amends its part · in committee · 117th Congress
- S 2651 SITE Act Amends its part · in committee · 117th Congress
- S 3688 Energy Infrastructure Protection Act of 2020 Amends its part · in committee · 116th Congress
- S 2012 North American Energy Security and Infrastructure Act of 2016 Amends its part · in committee · 114th Congress
- HR 8 North American Energy Security and Infrastructure Act of 2015 Amends its part · in committee · 114th Congress
- HR 22 Hire More Heroes Act of 2015 Amends its part · enacted · 114th Congress
- S 2089 American Energy Innovation Act Amends its part · introduced · 114th Congress
- HR 2402 Protecting Critical Infrastructure Act Amends its part 824s(b)(2), 824s(e) · in committee · 114th Congress
- HR 2271 Critical Electric Infrastructure Protection Act Amends its part 824s(b)(2), 824s(e) · in committee · 114th Congress
- S 1222 Continuity of Electric Capacity Resources Act Amends its part · in committee · 114th Congress
- S 1068 A bill to amend the Federal Power Act to protect the bulk-power system from cyber security threats. Amends its part · in committee · 114th Congress
- HR 1971 Climate Solutions Act of 2015 Amends its part · in committee · 114th Congress
- HR 4298 GRID Act Amends its part 824s(b)(2), 824s(e) · in committee · 113th Congress
- HR 2417 Secure High-voltage Infrastructure for Electricity from Lethal Damage Act Amends its part 824s(b)(2), 824s(e) · in committee · 113th Congress
- S 1342 Grid Cyber Security Act Amends its part · in committee · 112th Congress
- S 1029 e-KNOW Act Amends its part · in committee · 112th Congress
- HR 668 Secure High-voltage Infrastructure for Electricity from Lethal Damage Act Amends its part 824s(b)(2), 824s(e) · in committee · 112th Congress
- S 3487 e-KNOW Act Amends its part · in committee · 111th Congress
- HR 5026 GRID Act Amends its part 824s(b)(2), 824s(e) · in committee · 111th Congress
- S 1462 American Clean Energy Leadership Act of 2009 Amends its part · in committee · 111th Congress
- HR 2998 American Clean Energy and Security Act of 2009 Amends its part · in committee · 111th Congress
- HR 2211 National Clean Energy Superhighways Act of 2009 Amends its part · in committee · 111th Congress
Showing the 50 most recently active.
The law today
From the official United States Code, current through Public Law 119-142.
(a) Rulemaking requirement
Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion.
(b) Contents The rule shall—
(1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities;
(2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies);
(3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and
(4) allow recovery of—
(A) all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; and
(B) all prudently incurred costs related to transmission infrastructure development pursuant to section 824p of this title.
(c) Incentives
In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization. The Commission shall ensure that any costs recoverable pursuant to this subsection may be recovered by such utility through the transmission rates charged by such utility or through the transmission rates charged by the Transmission Organization that provides transmission service to such utility.
(d) Just and reasonable rates
All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential.
Official text at uscode.house.gov ↗