United States 119th Congress Status: In Committee Sponsors 5 D

HR 10539 — Integrated Local, Regional, and Interregional Transmission Planning Act of 2026

Last action — Referred to the House Committee on Energy and Commerce.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced September 24, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

In plain language

The bill aims to improve electricity transmission planning across different regions.

This legislation proposes amendments to the Federal Power Act to enhance coordination in electricity transmission planning. It focuses on integrating local, regional, and interregional efforts for a more efficient electric grid.

Summary

To amend the Federal Power Act to improve the electric grid through the integration of local, regional, and interregional electricity transmission planning, and for other purposes.

Bill Text

Sections of law this bill changes

2 sections in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 1 section Amends the act as a whole
  • § 824p Siting of interstate electric transmission facilities Amends

    16 U.S.C. § 824p — at 824p(b)

    The law today

    (a) Designation of national interest electric transmission corridors (1) Not later than 1 year after August 8, 2005, and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion. (2) Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under paragraph (1) or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that— (i)  1 is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or (ii)  2 is expected to experience such energy transmission capacity constraints or congestion. (3) Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph (1) and issuing the report under paragraph (2), shall consult with any appropriate regional entity referred to in section 824o of this title. (4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether— (A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity; (B) (i) economic growth in the corridor, or the end markets served by the corridor, may be jeopardized by reliance on limited sources of energy; and (ii) a diversification of supply is warranted; (C) the energy independence or energy security of the United States would be served by the designation; (D) the designation would be in the interest of national energy policy; (E) the designation would enhance national defense and homeland security; (F) the designation would enhance the ability of facilities that generate or transmit firm or intermittent energy to connect to the electric grid; (G) the designation— (i) maximizes existing rights-of-way; and (ii) avoids and minimizes, to the maximum extent practicable, and offsets to the extent appropriate and practicable, sensitive environmental areas and cultural heritage sites; and (H) the designation would result in a reduction in the cost to purchase electric energy for consumers. (b) Construction permit Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that— (1) (A) a State in which the transmission facilities are to be constructed or modified does not have authority to— (i) approve the siting of the facilities; or (ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State; (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or (C) a State commission or other entity that has authority to approve the siting of the facilities— (i) has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of— (I) the date on which the application was filed; and (II) the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a); (ii) has conditioned its approval in such a manner that the propos...

    37 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

How this bill changes current law

6 changes Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill adds a new section to the Federal Power Act to establish requirements for transmission planning aimed at enhancing grid reliability, affordability, and resilience.

  • 16 U.S.C. 824

    SEC. 224. PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE GRID RELIABILITY, AFFORDABILITY, AND RESILIENCE.

    This insert establishes a new section dedicated to transmission planning.

  • 16 U.S.C. 824

    (a) Definitions.--In this section: ...

    Adds definitions necessary for the new planning requirements.

  • 16 U.S.C. 824

    (b) Rulemaking.--Not later than 6 months after the date of enactment of this section, the Commission shall propose a rule, ...

    Mandates the Commission to modify and augment existing transmission planning processes.

  • 16 U.S.C. 824

    (c) Joint Planning.--The final rule ... shall require each Transmission Planning Region to jointly plan ...

    Requires joint planning between transmission regions to enhance collaboration.

  • 16 U.S.C. 824

    (d) Plan Elements.--The final rule ... shall require that joint transmission plans contain the following elements: ...

    Specifies elements that must be included in joint transmission plans.

  • 16 U.S.C. 824

    (e) Deadline; Updates.--The joint transmission plans required to be submitted to the Commission ...

    Establishes deadlines and update requirements for joint transmission plans.

Action History

  1. Referred to the House Committee on Energy and Commerce.

  2. Introduced in House

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 4 co-sponsors · 534 not signed on

Sponsors (1)

Co-sponsors (4)

Not signed on (534)

534 members have not signed on to this bill.

Show all 534 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 10539 do?
To amend the Federal Power Act to improve the electric grid through the integration of local, regional, and interregional electricity transmission planning, and for other purposes.
Who sponsors HR 10539?
HR 10539 is sponsored by Kathy Castor (Democratic), Mike Levin (Democratic), James P. McGovern (Democratic), George Latimer (Democratic), and Sean Casten (Democratic).
What is the current status of HR 10539?
This bill is in committee in the House. Introduced September 24, 2026. It must pass committee before a floor vote.
Where can I track HR 10539?
Track HR 10539 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 10539

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 10539

Last checked for changes 12 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →