Secure High-voltage Infrastructure for Electricity from Lethal Damage Act
Do you support it?
Want to know if it passes?
We'll email you when HR 2417 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HR 2417.
You're tracking HR 2417
We'll email you the moment it moves.
HR 2417 — Secure High-voltage Infrastructure for Electricity from Lethal Damage Act
Last action — Referred to the Subcommittee on Energy and Power.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Secure High-voltage Infrastructure for Electricity from Lethal Damage Act or SHIELD Act - Amends the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC), with or without notice, hearing, or report, to order emergency measures to protect the reliability of either the bulk-power system or the defense critical electric infrastructure whenever the President issues a written directive or determination identifying an imminent grid security threat. Directs FERC to consult with governmental authorities in Canada, Mexico, and the Electric Reliability Organization (ERO) regarding implementation of emergency measures. Prescribes: (1) implementation procedures; and (2) related cost recovery measures affecting owners, operators, and users of either the bulk-power system or the defense critical electric infrastructure. Directs FERC to require any owner, user, or operator of the domestic bulk-power system to implement measures to protect the system against specified vulnerabilities. Requires FERC to issue an order directing ERO to submit for approval, within 30 days, a reliability standard requiring implementation, by any owner, operator, or user of the bulk-power system in the United States, of measures to protect the bulk-power system against an identified grid security vulnerability (including a protection plan with automated hardware-based solutions). Directs FERC also to order the ERO to submit reliability standards to: (1) protect the bulk-power system from a reasonably foreseeable geomagnetic storm event or electromagnetic pulse event (EMP); and (2) require entities that own or operate large transformers to ensure their adequate availability to restore promptly the reliable operation of the bulk-power system in the event of destruction or disability as a result of attack or a geomagnetic storm or EMP. Directs the Secretary of Energy to establish a program to: (1) develop technical expertise in the protection of electric energy systems against either geomagnetic storms or malicious acts using electronic communications or electromagnetic weapons; and (2) share it with owners, operators, or users of systems for the generation, transmission, or distribution of electric energy located in the United States and with state commissions.
Bill Text
We don't have the full text on file for this bill yet.
Read HR 2417 on the official United States source →Action History
-
Referred to the Subcommittee on Energy and Power.
-
Referred to House Budget
-
Referred to House Energy and Commerce
-
Referred to the Committee on Energy and Commerce, and in addition to the Committee on the Budget, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Sponsors
- Trent Franks · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HR 2417 do?
- Secure High-voltage Infrastructure for Electricity from Lethal Damage Act or SHIELD Act - Amends the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC), with or without notice, hearing, or report, to order emergency measures to protect the reliability of either the bulk-power system or the defense critical electric infrastructure whenever the President issues a written directive or determination identifying an imminent grid security threat. Directs FERC to consult with governmental authorities in Canada, Mexico, and the Electric Reliability Organization (ERO) regarding implementation of emergency measures. Prescribes: (1) implementation procedures; and (2) related cost recovery measures affecting owners, operators, and users of either the bulk-power system or the defense critical electric infrastructure. Directs FERC to require any owner, user, or operator of the domestic bulk-power system to implement measures to protect the system against specified vulnerabilities. Requires FERC to issue an order directing ERO to submit for approval, within 30 days, a reliability standard requiring implementation, by any owner, operator, or user of the bulk-power system in the United States, of measures to protect the bulk-power system against an identified grid security vulnerability (including a protection plan with automated hardware-based solutions). Directs FERC also to order the ERO to submit reliability standards to: (1) protect the bulk-power system from a reasonably foreseeable geomagnetic storm event or electromagnetic pulse event (EMP); and (2) require entities that own or operate large transformers to ensure their adequate availability to restore promptly the reliable operation of the bulk-power system in the event of destruction or disability as a result of attack or a geomagnetic storm or EMP. Directs the Secretary of Energy to establish a program to: (1) develop technical expertise in the protection of electric energy systems against either geomagnetic storms or malicious acts using electronic communications or electromagnetic weapons; and (2) share it with owners, operators, or users of systems for the generation, transmission, or distribution of electric energy located in the United States and with state commissions.
- Who sponsors HR 2417?
- HR 2417 is sponsored by Trent Franks (R).
- What is the current status of HR 2417?
- This bill died with 113th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HR 2417?
- Track HR 2417 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 2417
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 2417
Last checked for changes about 20 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →