HR 10579 — Energy Cost Fairness and Reliability Act of 2026
Last action — Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill is in committee in the House. Introduced September 24, 2026. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the House.
In plain language
This bill aims to amend the Federal Power Act regarding large load facility interconnections.
The Energy Cost Fairness and Reliability Act of 2026 seeks to require the Federal Energy Regulatory Commission to establish rules for connecting large load facilities to the transmission system. The specific provisions of the bill are not available.
Summary
To amend the Federal Power Act to require the Federal Energy Regulatory Commission to issue a final rule relating to the interconnection of large load facilities with the transmission system, and for other purposes.
Bill Text
- Introduced Introduced in House Current html September 24, 2026
Sections of law this bill changes
1 section in 1 lawFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Federal regulation and development of power · 16 U.S.C. ch. 12 Amends the act as a whole
Also cites: 5 U.S.C. § 552, 15 U.S.C. § 772, 29 U.S.C. § 152, 42 U.S.C. § 15801
Compared against current U.S. Code AI-generated reading aid — verify against the official bill.
The bill adds provisions to the Federal Power Act regarding the management and interconnection processes for large load facilities.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
SEC. 224. MANAGEMENT OF LARGE LOAD FACILITIES.
This section establishes new regulations for managing large load facilities.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
In this section: ... (Definitions)
Introduces definitions relevant to large load facilities, such as 'curtailable' and 'large load customer'.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
Not later than 1 year after the date of enactment of this section, the Commission ... shall issue 1 or more final rules to establish standard interconnection procedures for large loads.
Mandates the Federal Energy Regulatory Commission to create standard procedures for interconnecting large load facilities.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
With respect to the costs of interconnection studies ... any large load customer seeking interconnection to the interstate transmission system shall pay 100 percent of the costs of interconnection studies.
Imposes the financial responsibility for interconnection study costs on large load customers.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
Network upgrades shall be assigned to large load customers through the interconnection study process.
Ensures that costs for network upgrades required for interconnection are borne by large load customers.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
Interconnection to the interstate transmission system for a large load facility shall not proceed until ... the interconnection would not cause a violation of any applicable Commission-approved reliability standards.
Establishes that interconnections cannot violate reliability standards.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
Interconnection to the transmission system shall not be approved for a large load customer unless ... the large load customer demonstrates and guarantees that ... new generating facilities ... will be constructed.
Requires large load customers to ensure the construction of new generating resources to meet capacity needs.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
The Commission shall issue standards or guidelines ... to establish minimum criteria necessary for a large load facility or category of large load facilities to qualify as sufficiently capable of exercising demand flexibility.
Empowers the Commission to set criteria for large load facilities regarding demand flexibility.
-
Part II of the Federal Power Act (16 U.S.C. 824 et seq.)
If the Commission determines necessary, the Commission shall establish minimum technical standards, or approve minimum technical standards established by transmission providers.
Allows the Commission to set technical standards for facilities to verify demand flexibility capabilities.
Action History
-
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
-
Introduced in House
Sponsors
- Daniel S. Goldman · Cosponsor
- Dave Min · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 537 not signed on
Sponsors (1)
- Dave Min Democratic
Co-sponsors (1)
- Daniel S. Goldman Democratic
Not signed on (537)
537 members have not signed on to this bill.
Show all 537 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
Frequently asked questions
- What does HR 10579 do?
- To amend the Federal Power Act to require the Federal Energy Regulatory Commission to issue a final rule relating to the interconnection of large load facilities with the transmission system, and for other purposes.
- Who sponsors HR 10579?
- HR 10579 is sponsored by Daniel S. Goldman (Democratic) and Dave Min (Democratic).
- What is the current status of HR 10579?
- This bill is in committee in the House. Introduced September 24, 2026. It must pass committee before a floor vote.
- Where can I track HR 10579?
- Track HR 10579 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 10579
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 10579
Last checked for changes 12 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →