United States 111th Congress Status: Died

HR 2211 — National Clean Energy Superhighways Act of 2009

Last action — Referred to the Subcommittee on Energy and Environment.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

National Clean Energy Superhighways Act of 2009 - Amends the Federal Power Act to: (1) authorize states of the Eastern interconnection and the Western Interconnection to establish interconnection-wide multistate transmission planning (MTA) authorities; (2) require the Federal Energy Regulatory Commission (FERC) to establish procedures governing MTA certification; (3) direct each MTA to exercise sustainable transmission grid (STG) transmission planning functions for its region and produce a biennial STG transmission plan that identifies needed STG projects and areas to be avoided in siting of STG projects; (4) require the Commission to develop an interconnection plan if no MTA for the Eastern or Western Interconnection is certified within a year; (5) direct MTAs to ensure that multiple certified plans are integrated with each other; (6) permit MTAs and states to recover costs for planning activities pursuant to a transmission surcharge that the Commission is required to establish under this Act; (7) authorize MTAs within an Interconnection, jointly, to submit an integrated Interconnection-wide cost allocation methodology; (8) give the Commission authority over regional planning entities to implement planning efforts, except the Electric Reliability Council of Texas and entities in Alaska and Hawaii; (9) require public utilities to apply to the Commission for a certificate of public convenience and necessity in order to construct or modify an STG project; (10) require STG construction certificates to incorporate a condition that prohibits the direct interconnection to the STG transmission line by any electricity generator that has a greenhouse gas emission rate greater than that of a singe-cycle natural gas-fired combustion turbine; (11) terminate such condition upon the implementation of a greenhouse gas regulatory program applicable to the electricity sector; (12) set forth provisions concerning exercising eminent domain to acquire the necessary right-of-way and property necessary to construct, operate, and maintain STG projects and long-term transmission rights; and (13) direct the Commission to encourage methods and structures for grid operations to better accommodate renewable energy resources. Requires the Department of Energy (DOE) to analyze, recommend, and report to Congress on metrics for transmission grid performance covering transmission grid facilities.

Bill Text

Sections of law this bill changes

1 section in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 Amends the act as a whole

Also cites: 18 U.S.C. § 1151

How this bill changes current law

1 change Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill adds a new section to the Federal Power Act that establishes a framework for the planning, construction, and operation of a sustainable transmission grid to facilitate the increased use of renewable energy sources.

  • Part II of the Federal Power Act (16 U.S.C. 824 et seq.)

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding after section 216 the following new section: "SEC. 216A. SUSTAINABLE TRANSMISSION GRID. "(a) Definitions.--For purposes of this section: "(1) STG.--The term `STG' means the sustainable transmission grid. "(2) STG project.--The term `STG project' means a project designated in an STG plan to construct an STG transmission line on a new or existing right-of-way after the date of enactment of this section. "(3) STG plan.--The term `STG plan' means a transmission plan accepted or prescribed by the Commission under subsection (b). "(4) STG transmission line.--The term `STG transmission line' means an overhead or underground transmission facility included in an STG plan, consisting of conductors or cables, towers, manhole duct systems, phase-shifting transformers, reactors, capacitors, substations, inverters, switching units, and any related facilities and equipment necessary for the proper operation of the transmission facility, that-- "(A) operates at or above a voltage of 345 kilovolts AC or DC; "(B) is a renewable feeder line; or "(C) is a necessary upgrade to an existing transmission facility. "(5) Renewable feeder line.-- "(A) In general.--The term `renewable feeder line' means a transmission line that-- "(i) operates at a voltage of 100 kilovolts or greater, and "(ii) is identified in the applicable STG plan as a facility that connects 1 or more renewable energy generators directly or indirectly to transmission facilities described in paragraph (4)(A). "(B) Inclusion.--The term `renewable feeder line' includes an upgrade to an existing transmission line necessary for interconnection to a new transmission line described in subparagraph (A). "(6) STG costs.--The term `STG costs' means capital and operating costs incurred by any entity for planning, development, and operation of a project certificated under subsection (d). "(7) Load-serving entity.--The term `load-serving entity' means a person or Federal, State, or local instrumentality (including an entity described in section 201(f)) that delivers electric energy to end-use customers. "(8) Multistate transmission authority.--The terms `Multistate Transmission Authority' and `MTA' mean a multistate transmission planning organization established pursuant to subsection (b). "(9) Renewable energy.--The term `renewable energy' means electric energy generated from-- "(A) solar energy, wind, landfill gas, renewable biogas, or geothermal energy; "(B) new hydroelectric generation capacity achieved from increased efficiency, or an addition of new capacity, at an existing nonhydroelectric project if-- "(i) the hydroelectric project installed on the nonhydroelectric dam-- "(I) is licensed by the Commission; and "(II) meets all other applicable environmental, licensing, and regulatory requirements, including applicable fish passage requirements; "(ii) the nonhydroelectric dam-- "(I) was placed in service before the date of enactment of the National Clean Energy Superhighways Act of 2009; "(II) was operated for flood control, navigation, or water supply purposes; and "(III) did not produce hydroelectric power as of the date of enactment of the National Clean Energy Superhighways Act of 2009; and "(iii) the hydroelectric project is operated so that the water surface elevation at any given location and time that would have occurred in the absence of the hydroelectric project is maintained, subject to any license requirements imposed under applicable law that change the water surface elevation for the purpose of improving the environmental quality of the affected waterway, as certified by the Commission; "(C) hydrokinetic energy, including-- "(i) waves, tides, and currents in oceans, estuaries, and tidal areas; "(ii) free-flowing water in rivers, lakes, and streams; "(iii) free-flowing water in man-made channels, including projects that use nonmechanical structures to accelerate the flow of water for electric power production purposes; or "(iv) differentials in ocean temperature through ocean thermal energy conversion; or "(D) electricity that is generated from the combustion of the biogenic portion of municipal solid waste materials from facilities that comply with the maximum pollutant emissions standards established by the Administrator of the Environmental Protection Agency.

    This change introduces a new section that provides definitions and establishes a framework for a sustainable transmission grid to facilitate renewable energy integration.

Action History

  1. Referred to the Subcommittee on Energy and Environment.

  2. Referred to the House Committee on Energy and Commerce.

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 2211 do?
National Clean Energy Superhighways Act of 2009 - Amends the Federal Power Act to: (1) authorize states of the Eastern interconnection and the Western Interconnection to establish interconnection-wide multistate transmission planning (MTA) authorities; (2) require the Federal Energy Regulatory Commission (FERC) to establish procedures governing MTA certification; (3) direct each MTA to exercise sustainable transmission grid (STG) transmission planning functions for its region and produce a biennial STG transmission plan that identifies needed STG projects and areas to be avoided in siting of STG projects; (4) require the Commission to develop an interconnection plan if no MTA for the Eastern or Western Interconnection is certified within a year; (5) direct MTAs to ensure that multiple certified plans are integrated with each other; (6) permit MTAs and states to recover costs for planning activities pursuant to a transmission surcharge that the Commission is required to establish under this Act; (7) authorize MTAs within an Interconnection, jointly, to submit an integrated Interconnection-wide cost allocation methodology; (8) give the Commission authority over regional planning entities to implement planning efforts, except the Electric Reliability Council of Texas and entities in Alaska and Hawaii; (9) require public utilities to apply to the Commission for a certificate of public convenience and necessity in order to construct or modify an STG project; (10) require STG construction certificates to incorporate a condition that prohibits the direct interconnection to the STG transmission line by any electricity generator that has a greenhouse gas emission rate greater than that of a singe-cycle natural gas-fired combustion turbine; (11) terminate such condition upon the implementation of a greenhouse gas regulatory program applicable to the electricity sector; (12) set forth provisions concerning exercising eminent domain to acquire the necessary right-of-way and property necessary to construct, operate, and maintain STG projects and long-term transmission rights; and (13) direct the Commission to encourage methods and structures for grid operations to better accommodate renewable energy resources. Requires the Department of Energy (DOE) to analyze, recommend, and report to Congress on metrics for transmission grid performance covering transmission grid facilities.
What is the current status of HR 2211?
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HR 2211?
Track HR 2211 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 2211

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 2211

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →