United States 118th Congress Status: Died Sponsors 1 D

S 4753 — Energy Permitting Reform Act of 2024

Last action — Placed on Senate Legislative Calendar under General Orders. Calendar No. 756.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

A bill to reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.

Bill Text

What changed in the latest version

2163 added · 86 removed

Plain-language change summary

The amended bill clarifies the scope of energy-related permits and rights-of-way by specifying the types of projects covered, such as energy infrastructure, carbon dioxide capture, and mineral processing. It also introduces language about the total acres for which expressions of interest have been submitted, indicating a focus on managing land use for energy projects. This change is important because it impacts how applications for various energy-related activities will be processed and considered.

→
Previous
Latest
4753 Introduced in Senate (IS)] <DOC> 118th CONGRESS 2d Session S.
4753 Reported in Senate (RS)] <DOC> Calendar No.
4753 To reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
756 118th CONGRESS 2d Session S.
4753 [Report No.
118-336] To reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
which was read twice and referred to the Committee on Energy and Natural Resources _______________________________________________________________________ A BILL To reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
which was read twice and referred to the Committee on Energy and Natural Resources December 19 (legislative day, December 16), 2024 Reported by Mr.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1.
Manchin, with an amendment [Strike out all after the enacting clause and insert the part printed in italic] _______________________________________________________________________ A BILL To reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <DELETED>SECTION 1.
TABLE OF CONTENTS.</DELETED> <DELETED> (a) Short Title.--This Act may be cited as the ``Energy Permitting Reform Act of 2024''.</DELETED> <DELETED> (b) Table of Contents.--The table of contents for this Act is as follows:</DELETED> <DELETED>Sec.
1.
Short title;
table of contents.
<DELETED>TITLE I--ACCELERATING CLAIMS <DELETED>Sec.
101.
Accelerating claims.
<DELETED>TITLE II--FEDERAL ONSHORE ENERGY LEASING AND PERMITTING <DELETED>Sec.
201.
Onshore oil and gas leasing.
<DELETED>Sec.
202.
Term of application for permit to drill.
<DELETED>Sec.
203.
Permitting compliance on non-Federal land.
<DELETED>Sec.
204.
Coal leases on Federal land.
<DELETED>Sec.
205.
Rights-of-way across Indian land.
<DELETED>Sec.
206.
Accelerating renewable energy permitting.
<DELETED>Sec.
207.
Improving renewable energy coordination on Federal land.
<DELETED>Sec.
208.
Geothermal leasing and permitting improvements.
<DELETED>Sec.
209.
Show all 500 changed rows (460 more)
Previous
Latest
Electric grid projects.
<DELETED>Sec.
210.
Hardrock mining mill sites.
<DELETED>TITLE III--FEDERAL OFFSHORE ENERGY LEASING AND PERMITTING <DELETED>Sec.
301.
Offshore oil and gas leasing.
<DELETED>Sec.
302.
Offshore wind energy.
<DELETED>TITLE IV--ELECTRIC TRANSMISSION <DELETED>Sec.
401.
Transmission permitting.
<DELETED>Sec.
402.
Transmission planning.
<DELETED>TITLE V--ELECTRIC RELIABILITY <DELETED>Sec.
501.
Reliability assessments.
<DELETED>TITLE VI--LIQUEFIED NATURAL GAS EXPORTS <DELETED>Sec.
601.
Action on applications.
<DELETED>Sec.
602.
Supplemental reviews.
<DELETED>TITLE VII--HYDROPOWER <DELETED>Sec.
701.
Hydropower license extensions.
<DELETED>TITLE I--ACCELERATING CLAIMS</DELETED> <DELETED>SEC.
101.
ACCELERATING CLAIMS.</DELETED> <DELETED> (a) Definitions.--In this section:</DELETED> <DELETED> (1) Authorization.--</DELETED> <DELETED> (A) In general.--The term ``authorization'' means any license, permit, approval, order, or other administrative decision that is required or authorized under Federal law (including regulations) to design, plan, site, construct, reconstruct, or commence operations of a project.</DELETED> <DELETED> (B) Inclusions.--The term ``authorization'' includes--</DELETED> <DELETED> (i) agency approvals of lease sales, permits, or plans required to explore for, develop, or produce minerals under-- </DELETED> <DELETED> (I) the Mineral Leasing Act (30 U.S.C.
181 et seq.);</DELETED> <DELETED> (II) the Act of August 7, (commonly known as the ``Mineral Leasing Act for Acquired Lands'') (30 U.S.C.
351 et seq.);</DELETED> <DELETED> (III) the Act of July 31, (commonly known as the ``Materials Act of 1947'') (61 Stat.
681, chapter 406;
30 U.S.C.
601 et seq.);</DELETED> <DELETED> (IV) sections 2319 through of the Revised Statutes (commonly known as the ``Mining Law of 1872'') (30 U.S.C.
22 et seq.);</DELETED> <DELETED> (V) the Outer Continental Shelf Lands Act (43 U.S.C.
1331 et seq.);
or</DELETED> <DELETED> (VI) the Geothermal Steam Act of 1970 (30 U.S.C.
1001 et seq.);
and</DELETED> <DELETED> (ii) statements or permits for a project under sections 7 and 10 of the Endangered Species Act of 1973 (16 U.S.C.
1536, 1539).</DELETED> <DELETED> (2) Environmental document.--The term ``environmental document'' includes any of the following, as prepared under the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.):</DELETED> <DELETED> (A) An environmental assessment.</DELETED> <DELETED> (B) A finding of no significant impact.</DELETED> <DELETED> (C) An environmental impact statement.</DELETED> <DELETED> (D) A record of decision.</DELETED> <DELETED> (3) Project.--The term ``project'' means a project--</DELETED> <DELETED> (A) proposed for the construction of infrastructure--</DELETED> <DELETED> (i) to develop, produce, generate, store, transport, or distribute energy;</DELETED> <DELETED> (ii) to capture, remove, transport, or store carbon dioxide;
or</DELETED> <DELETED> (iii) to mine, extract, beneficiate, or process minerals;
and</DELETED> <DELETED> (B) subject to the requirements that-- </DELETED> <DELETED> (i) an environmental document be prepared;
and</DELETED> <DELETED> (ii) the applicable agency issue an authorization of the activity.</DELETED> <DELETED> (4) Project sponsor.--The term ``project sponsor'' means an entity, including any private, public, or public- private entity, seeking an authorization for a project.</DELETED> <DELETED> (b) Statute of Limitations.--Notwithstanding any other provision of law, a civil action arising under Federal law seeking judicial review of a final agency action granting or denying an authorization shall be barred unless the civil action is filed by the date that is 150 days after the date on which the authorization was granted or denied, unless a shorter time is specified in the Federal law pursuant to which judicial review is allowed.</DELETED> <DELETED> (c) Expedited Review.--A reviewing court shall set for expedited consideration any civil action arising under Federal law seeking judicial review of a final agency action granting or denying an authorization.</DELETED> <DELETED> (d) Remanded Actions.--</DELETED> <DELETED> (1) In general.--If the reviewing court remands a final Federal agency action granting or denying an authorization to the Federal agency for further proceedings, whether on a motion by the court, the agency, or another party, the court shall set a reasonable schedule and deadline for the agency to act on remand, which shall not exceed 180 days from the date on which the order of the court was issued, unless a longer time period is necessary to comply with applicable law.</DELETED> <DELETED> (2) Expedited treatment of remanded actions.--The head of the Federal agency to which a court remands a final Federal agency action under paragraph (1) shall take such actions as may be necessary to provide for the expeditious disposition of the action on remand in accordance with the schedule and deadline set by the court under that paragraph.</DELETED> <DELETED> (e) Treatment of Supplemental or Revised Environmental Documents.--For the purpose of subsection (b), the preparation of a supplemental or revised environmental document, when required, shall be considered to be a separate final agency action.</DELETED> <DELETED> (f) Notice.--Not later than 30 days after the date on which an agency is served a copy of a petition for review or a complaint in a civil action described in subsection (b), the head of the agency shall notify the project sponsor of the filing of the petition or complaint.</DELETED> <DELETED>TITLE II--FEDERAL ONSHORE ENERGY LEASING AND PERMITTING</DELETED> <DELETED>SEC.
201.
ONSHORE OIL AND GAS LEASING.</DELETED> <DELETED> (a) Limitation on Issuance of Certain Leases or Rights-of- Way.--Section 50265(b)(1)(B) of Public Law 117-169 (43 U.S.C.
3006(b)(1)(B)) is amended, in the matter preceding clause (i), by inserting ``for which expressions of interest have been submitted that have been'' after ``sum of total acres''.</DELETED> <DELETED> (b) Mineral Leasing Act Reforms.--</DELETED> <DELETED> (1) Expressions of interest for oil and gas leasing.--Section 17(b) of the Mineral Leasing Act (30 U.S.C.
226(b)) is amended by adding at the end the following:</DELETED> <DELETED> ``(3) Subdivision.--</DELETED> <DELETED> ``(A) In general.--A parcel of land included in an expression of interest that the Secretary of the Interior offers for lease shall be leased as nominated and not subdivided into multiple parcels unless the Secretary of the Interior determines that a subpart of the submitted parcel is not open to oil or gas leasing under the approved resource management plan.</DELETED> <DELETED> ``(B) Required reviews.--Nothing in this paragraph affects the obligations of the Secretary of the Interior to complete requirements and reviews established by other provisions of law before leasing a parcel of land.</DELETED> <DELETED> ``(4) Resource management plans.--</DELETED> <DELETED> ``(A) Lease terms and conditions.--A lease issued under this section shall be subject to the terms and conditions of the approved resource management plan.</DELETED> <DELETED> ``(B) Effect of leasing decision.-- Notwithstanding section 1506.1 of title 40, Code of Federal Regulations (as in effect on the date of enactment of this paragraph), the Secretary may conduct a lease sale under an approved resource management plan while amendments to the approved plan are under consideration.''.</DELETED> <DELETED> (2) Refund of expression of interest fee.--Section 17(q) of the Mineral Leasing Act (30 U.S.C.
226(q)) is amended--</DELETED> <DELETED> (A) by striking ``Secretary'' each place it appears and inserting ``Secretary of the Interior'';</DELETED> <DELETED> (B) in paragraph (1), by striking ``nonrefundable'';
and</DELETED> <DELETED> (C) by adding at the end the following:</DELETED> <DELETED> ``(3) Refund for nonwinning bid.--If a person other than the person who submitted the expression of interest is the highest responsible qualified bidder for a parcel of land covered by the applicable expression of interest in a lease sale conducted under this section--</DELETED> <DELETED> ``(A) as a condition of the issuance of the lease, the person who is the highest responsible qualified bidder shall pay to the Secretary of the Interior an amount equal to the applicable fee paid by the person who submitted the expression of interest;
and</DELETED> <DELETED> ``(B) not later than 60 days after the date of the lease sale, the Secretary of the Interior shall refund to the person who submitted the expression of interest an amount equal to the amount of the initial fee paid.</DELETED> <DELETED> ``(4) Refundability.--Except as provided in paragraph (3)(B), the fee assessed under paragraph (1) shall be nonrefundable.''.</DELETED> <DELETED>SEC.
202.
TERM OF APPLICATION FOR PERMIT TO DRILL.</DELETED> <DELETED> Section 17(p) of the Mineral Leasing Act (30 U.S.C.
226(p)) is amended by adding at the end the following:</DELETED> <DELETED> ``(4) Term.--</DELETED> <DELETED> ``(A) In general.--A permit to drill approved under this subsection shall be valid for a single non-renewable 4-year period beginning on the date of the approval.</DELETED> <DELETED> ``(B) Retroactivity.--In addition to all approved applications for permits to drill submitted on or after the date of enactment of this paragraph, subparagraph (A) shall apply to--</DELETED> <DELETED> ``(i) all permits approved during the 2-year period preceding the date of enactment of this paragraph;
and</DELETED> <DELETED> ``(ii) all pending applications for permit to drill submitted prior to the date of enactment of this paragraph.''.</DELETED> <DELETED>SEC.
203.
PERMITTING COMPLIANCE ON NON-FEDERAL LAND.</DELETED> <DELETED> (a) In General.--Notwithstanding the Mineral Leasing Act (30 U.S.C.
181 et seq.), the Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C.
1701 et seq.), or subpart 3162 of part 3160 of title 43, Code of Federal Regulations (or successor regulations), but subject to any applicable State or Tribal requirements and subsection (c), the Secretary of the Interior shall not require a permit to drill for an oil and gas lease under the Mineral Leasing Act (30 U.S.C.
181 et seq.) for an action occurring within an oil and gas drilling or spacing unit if--</DELETED> <DELETED> (1) the Federal Government--</DELETED> <DELETED> (A) owns less than 50 percent of the minerals within the oil and gas drilling or spacing unit;
and</DELETED> <DELETED> (B) does not own or lease the surface estate within the area directly impacted by the action;</DELETED> <DELETED> (2) the well is located on non-Federal land overlying a non-Federal mineral estate, but some portion of the wellbore enters and produces from the Federal mineral estate subject to the lease;
or</DELETED> <DELETED> (3) the well is located on non-Federal land overlying a non-Federal mineral estate, but some portion of the wellbore traverses but does not produce from the Federal mineral estate subject to the lease.</DELETED> <DELETED> (b) Notification.--For each State permit to drill or drilling plan that would impact or extract oil and gas owned by the Federal Government--</DELETED> <DELETED> (1) each lessee of Federal minerals in the unit, or designee of a lessee, shall--</DELETED> <DELETED> (A) notify the Secretary of the Interior of the submission of a State application for a permit to drill or drilling plan on submission of the application;
and</DELETED> <DELETED> (B) provide a copy of the application described in subparagraph (A) to the Secretary of the Interior not later than 5 days after the date on which the permit or plan is submitted;</DELETED> <DELETED> (2) each lessee, designee of a lessee, or applicable State shall notify the Secretary of the Interior of the approved State permit to drill or drilling plan not later than 45 days after the date on which the permit or plan is approved;
and</DELETED> <DELETED> (3) each lessee or designee of a lessee shall provide, prior to commencing drilling operations, agreements authorizing the Secretary of the Interior to enter non-Federal land, as necessary, for inspection and enforcement of the terms of the Federal lease.</DELETED> <DELETED> (c) Nonapplicability to Indian Lands.--Subsection (a) shall not apply to Indian lands (as defined in section 3 of the Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C.
1702)).</DELETED> <DELETED> (d) Effect.--Nothing in this section affects--</DELETED> <DELETED> (1) other authorities of the Secretary of the Interior under the Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C.
1701 et seq.);
or</DELETED> <DELETED> (2) the amount of royalties due to the Federal Government from the production of the Federal minerals within the oil and gas drilling or spacing unit.</DELETED> <DELETED> (e) Authority on Non-Federal Land.--Section 17(g) of the Mineral Leasing Act (30 U.S.C.
226(g)) is amended--</DELETED> <DELETED> (1) by striking the subsection designation and all that follows through ``Secretary of the Interior, or'' in the first sentence and inserting the following:</DELETED> <DELETED> ``(g)(1) The Secretary of the Interior, or'';
and</DELETED> <DELETED> (2) by adding at the end the following:</DELETED> <DELETED> ``(2)(A) In the case of an oil and gas lease under this Act on land described in subparagraph (B) located within an oil and gas drilling or spacing unit, nothing in this Act authorizes the Secretary of the Interior--</DELETED> <DELETED> ``(i) to require a bond to protect non-Federal land;</DELETED> <DELETED> ``(ii) to enter non-Federal land without the consent of the applicable landowner;</DELETED> <DELETED> ``(iii) to impose mitigation requirements;
or</DELETED> <DELETED> ``(iv) to require approval for surface reclamation.</DELETED> <DELETED> ``(B) Land referred to in subparagraph (A) is land where-- </DELETED> <DELETED> ``(i) the Federal Government--</DELETED> <DELETED> ``(I) owns less than 50 percent of the minerals within the oil and gas drilling or spacing unit;
and</DELETED> <DELETED> ``(II) does not own or lease the surface estate within the area directly impacted by the action;</DELETED> <DELETED> ``(ii) the well is located on non-Federal land overlying a non-Federal mineral estate, but some portion of the wellbore enters and produces from the Federal mineral estate subject to the lease;
or</DELETED> <DELETED> ``(iii) the well is located on non-Federal land overlying a non-Federal mineral estate, but some portion of the wellbore traverses but does not produce from the Federal mineral estate subject to the lease.''.</DELETED> <DELETED>SEC.
204.
COAL LEASES ON FEDERAL LAND.</DELETED> <DELETED> (a) Deadlines.--</DELETED> <DELETED> (1) In general.--Section 2(a) of the Mineral Leasing Act (30 U.S.C.
201(a)) is amended--</DELETED> <DELETED> (A) in paragraph (1), in the first sentence, by striking ``he shall, in his discretion, upon the request of any qualified applicant or on his own motion from time to time'' and insert ``the Secretary shall, at the discretion of the Secretary but subject to paragraph (6), on the request of any qualified applicant or on a motion by the Secretary'';
and</DELETED> <DELETED> (B) by adding at the end the following:</DELETED> <DELETED> ``(6) Deadlines.--</DELETED> <DELETED> ``(A) Applicant motion.--Not later than 90 days after the date on which a request of a qualified applicant is received for a lease sale under paragraph (1), or for a lease modification under section 3, the Secretary of the Interior shall commence all necessary consultations and reviews required under Federal law in accordance with that paragraph or section, as applicable.</DELETED> <DELETED> ``(B) Decision.--Not later than 90 days after the completion of an environmental impact statement or environmental assessment consistent with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.) for a lease sale under paragraph (1), or for a lease modification under section 3, the Secretary of the Interior shall issue a record of decision or a finding of no significant impact for the lease sale or lease modification.</DELETED> <DELETED> ``(C) Fair market value.--Not later than days after the date on which the Secretary of the Interior issues a record of decision or a finding of no significant impact under subparagraph (B) for a lease sale under paragraph (1), or for a lease modification under section 3, the Secretary shall determine the fair market value of the coal subject to the lease.''.</DELETED> <DELETED> (2) Lease modifications.--Section 3(b) of the Mineral Leasing Act (30 U.S.C.
203(b)) is amended by striking ``The Secretary shall prescribe'' and inserting ``Subject to section 2(a)(6), the Secretary shall prescribe''.</DELETED> <DELETED> (b) Conforming Amendments.--Section 2(a)(1) of the Mineral Leasing Act (30 U.S.C.
201(a)(1)) is amended--</DELETED> <DELETED> (1) in the first sentence--</DELETED> <DELETED> (A) by striking ``he finds appropriate'' and inserting ``the Secretary of the Interior finds appropriate'';
and</DELETED> <DELETED> (B) by striking ``he deems appropriate'' and inserting ``the Secretary of the Interior determines to be appropriate'';</DELETED> <DELETED> (2) in the sixth sentence, by striking ``Prior to his determination'' and inserting ``Prior to a determination by the Secretary of the Interior'';</DELETED> <DELETED> (3) in the seventh sentence--</DELETED> <DELETED> (A) by striking ``to make public his judgment'' and inserting ``to make public the judgment of the Secretary of the Interior'';
and</DELETED> <DELETED> (B) by striking ``comments he receives'' and inserting ``comments received by the Secretary of the Interior'';
and</DELETED> <DELETED> (4) in the eighth sentence, by striking ``He is hereby authorized'' and inserting ``The Secretary of the Interior is authorized''.</DELETED> <DELETED> (c) Technical Correction.--Section 2(b)(3) of the Mineral Leasing Act (30 U.S.C.
201(b)(3)) is amended, in the first sentence, by striking ``geophyscal'' and inserting ``geophysical''.</DELETED> <DELETED>SEC.
205.
RIGHTS-OF-WAY ACROSS INDIAN LAND.</DELETED> <DELETED> The first section of the Act of February 5, 1948 (62 Stat.
17, chapter 45;
25 U.S.C.
323), is amended by adding at the end the following:
``Any right-of-way granted by an Indian tribe for the purposes authorized under this section shall not require the approval of the Secretary of the Interior, on the condition that the right-of- way approval process by the Indian tribe substantially complies with subsection (h) of the first section of the Act of August 9, 1955 (69 Stat.
539, chapter 615;
25 U.S.C.
415(h)) or the Indian tribe has approved regulations under paragraph (1) of that subsection.''.</DELETED> <DELETED>SEC.
206.
ACCELERATING RENEWABLE ENERGY PERMITTING.</DELETED> <DELETED> (a) Deadline for Consideration of Applications for Rights- of-Way.--</DELETED> <DELETED> (1) Completeness of review.--</DELETED> <DELETED> (A) In general.--Not later than 30 days after the date on which the Secretary of the Interior or the Secretary of Agriculture, as applicable, receives an application for a right-of-way under section 501 of the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1761) for an eligible project (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
3001)), the applicable Secretary shall-- </DELETED> <DELETED> (i) notify the applicant that the application is complete;
or</DELETED> <DELETED> (ii) notify the applicant that information is missing from the application and specify any information that is required to be submitted for the application to be complete.</DELETED> <DELETED> (B) Environmental impact statement.--For an eligible project (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
3001)) that requires an environmental impact statement for an application submitted under subparagraph (A), the Secretary of the Interior or the Secretary of Agriculture, as applicable, shall issue a notice of intent not later than 90 days after the date on which the applicable Secretary determines that an application is complete under subparagraph (A).</DELETED> <DELETED> (2) Cost recovery and issuance or deferral.-- </DELETED> <DELETED> (A) In general.--Not later than 30 days after the date on which an applicant submits a complete application for a right-of-way under paragraph (1), the Secretary of the Interior or the Secretary of Agriculture, as applicable, shall, if a cost recovery agreement is required under section 2804.14 of title 43, Code of Federal Regulations (or successor regulations), or section 251.58 of title 36, Code of Federal Regulations (or successor regulations), issue a cost recovery agreement.</DELETED> <DELETED> (B) Decision.--Not later than 30 days after the date on which an applicant submits a complete application for a right-of-way under paragraph (1), the Secretary of the Interior or the Secretary of Agriculture, as applicable, shall--</DELETED> <DELETED> (i) grant or deny the application, if the requirements under the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) and any other applicable law have been completed;
or</DELETED> <DELETED> (ii) defer the decision on the application and provide to the applicant notice--</DELETED> <DELETED> (I) that specifies steps that the applicant can take for the decision on the application to be issued;
and</DELETED> <DELETED> (II) of a list of actions that need to be taken by the agency in order to comply with applicable law, and timelines and deadlines for completing those actions.</DELETED> <DELETED> (b) Low Disturbance Activities for Renewable Energy Projects.--</DELETED> <DELETED> (1) In general.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting of eligible projects (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
3001)), the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) for low disturbance activities necessary for renewable energy projects.</DELETED> <DELETED> (2) Activities described.--Low disturbance activities referred to in paragraph (1) are the following:</DELETED> <DELETED> (A) Individual surface disturbances of less than 5 acres that have undergone site-specific analysis in a document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) that has been previously completed.</DELETED> <DELETED> (B) Activities at a location at which the same type of activity has previously occurred within 5 years prior to the date of commencement of the activity.</DELETED> <DELETED> (C) Activities on previously disturbed or developed (as defined in section 1021.410(g)(1) of title 10, Code of Federal Regulations (or successor regulations)) land for which an approved land use plan or any environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) analyzed such activity as reasonably foreseeable, so long as such plan or document was approved within 5 years prior to the date of the activity.</DELETED> <DELETED> (D) The installation, modification, operation, or decommissioning of commercially available energy systems located on a building or other structure (such as a rooftop, parking lot, or facility, or mounted to signage, lighting, gates, or fences).</DELETED> <DELETED> (E) Maintenance of a minor activity, other than any construction or major renovation, or a building or facility.</DELETED> <DELETED> (F) Preliminary geotechnical investigations.</DELETED> <DELETED> (G) The installation and removal of temporary meteorological stations.</DELETED> <DELETED>SEC.
207.
IMPROVING RENEWABLE ENERGY COORDINATION ON FEDERAL LAND.</DELETED> <DELETED> (a) National Goal for Renewable Energy Production on Federal Land.--</DELETED> <DELETED> (1) Goal.--Not later than 180 days after the date of enactment of this Act, in accordance with section 3104 of the Energy Act of 2020 (43 U.S.C.
3004), the Secretary of the Interior, in consultation with the Secretary of Agriculture and other heads of relevant Federal agencies, shall establish a target date for the authorization of not less than 50 gigawatts of renewable energy production on Federal land by not later than 2030.</DELETED> <DELETED> (2) Periodic goal revision.--Section 3104 of the Energy Act of 2020 (43 U.S.C.
3004) is amended--</DELETED> <DELETED> (A) in subsection (a), by inserting ``and periodically revise'' after ``establish'';
and</DELETED> <DELETED> (B) by adding at the end the following:</DELETED> <DELETED> ``(c) Permitting.--Subject to the limitations described in section 50265(b)(1) of Public Law 117-169 (43 U.S.C.
3006(b)(1)), the Secretary shall, in consultation with the heads of relevant Federal agencies, seek to issue permits that authorize, in total, sufficient electricity from eligible projects to meet or exceed the national goals established and revised under this section.''.</DELETED> <DELETED> (b) Definition of Eligible Project.--Paragraph (4) of section 3101 of the Energy Act of 2020 (43 U.S.C.
3001) is amended by inserting ``or store'' after ``generate''.</DELETED> <DELETED> (c) Renewable Energy Project Review Standards.--Section of the Energy Act of 2020 (43 U.S.C.
3002) is amended--</DELETED> <DELETED> (1) in subsection (a), in the second sentence, by inserting ``sufficient to achieve goals for renewable energy production on Federal land established under section 3104'' before the period at the end;</DELETED> <DELETED> (2) by redesignating subsection (f) as subsection (h);
and</DELETED> <DELETED> (3) by inserting after subsection (e) the following:</DELETED> <DELETED> ``(f) Renewable Energy Project Review Standards.--Not later than 2 years after the date of enactment of the Energy Permitting Reform Act of 2024, for the purpose of encouraging standardized reviews and facilitating the permitting of eligible projects, the National Renewable Energy Coordination Office of the Bureau of Land Management shall promulgate renewable energy project review standards to be adopted by regional renewable energy coordination offices.</DELETED> <DELETED> ``(g) Clarification of Existing Authority.--Under section of the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1737), the Secretary may accept donations from renewable energy companies to improve community engagement for the permitting of energy projects.''.</DELETED> <DELETED> (d) Savings Clause.--Nothing in this section, or an amendment made by this section, modifies the limitations described in section 50265(b)(1) of Public Law 117-169 (43 U.S.C.
3006(b)(1)).</DELETED> <DELETED>SEC.
208.
GEOTHERMAL LEASING AND PERMITTING IMPROVEMENTS.</DELETED> <DELETED> (a) Preliminary Geothermal Activities.--Not later than 180 days after the date of enactment of this Act, the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.) for individual disturbances of less than 10 acres for activities required to test, monitor, calibrate, explore, or confirm geothermal resources, provided those activities do not involve--</DELETED> <DELETED> (1) the commercial production of geothermal resources;</DELETED> <DELETED> (2) the use of geothermal resources for commercial operations;
or</DELETED> <DELETED> (3) construction of permanent roads.</DELETED> <DELETED> (b) Annual Leasing.--Section 4(b) of the Geothermal Steam Act of 1970 (30 U.S.C.
1003(b)) is amended--</DELETED> <DELETED> (1) in paragraph (2), by striking ``every 2 years'' and inserting ``per year'';
and</DELETED> <DELETED> (2) by adding at the end the following:</DELETED> <DELETED> ``(5) Replacement sales.--If a lease sale under this section for a year is cancelled or delayed, the Secretary shall conduct a replacement sale not later than 180 days after the date of the cancellation or delay, as applicable, and the replacement sale may not be cancelled or delayed.''.</DELETED> <DELETED> (c) Deadlines for Consideration of Geothermal Drilling Permits.--Section 4 of the Geothermal Steam Act of 1970 (30 U.S.C.
1003) is amended by adding at the end the following:</DELETED> <DELETED> ``(h) Deadlines for Consideration of Geothermal Drilling Permits.--</DELETED> <DELETED> ``(1) In general.--Not later than 10 days after the date on which the Secretary receives an application for any geothermal drilling permit, the Secretary shall--</DELETED> <DELETED> ``(A) provide written notice to the applicant that the application is complete;
or</DELETED> <DELETED> ``(B) notify the applicant that information is missing from the application and specify any information that is required to be submitted for the application to be complete.</DELETED> <DELETED> ``(2) Decision.--Not later than 30 days after the date on which an applicant submits a complete application for a geothermal drilling permit under paragraph (1), the Secretary shall--</DELETED> <DELETED> ``(A) grant or deny the application, if the requirements under the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.) and any other applicable law have been completed;
or</DELETED> <DELETED> ``(B) defer the decision on the application and provide to the applicant notice-- </DELETED> <DELETED> ``(i) that specifies steps that the applicant can take for the decision on the application to be issued;
and</DELETED> <DELETED> ``(ii) of a list of actions that need to be taken by the agency in order to comply with applicable law, and timelines and deadlines for completing those actions.''.</DELETED> <DELETED> (d) Cost Recovery Authority.--Section 24 of the Geothermal Steam Act of 1970 (30 U.S.C.
1023) is amended--</DELETED> <DELETED> (1) by striking the section designation and all that follows through ``The Secretary'' and inserting the following:</DELETED> <DELETED>``SEC.
24.
RULES AND REGULATIONS.</DELETED> <DELETED> ``The Secretary'';
and</DELETED> <DELETED> (2) by adding at the end the following:
``The Secretary shall, not later than 180 days after the date of enactment of the Energy Permitting Reform Act of 2024, promulgate rules for cost recovery, to be paid by permit applicants or lessees, to facilitate the timely coordination and processing of leases, permits, and authorizations and to reimburse the Secretary for all reasonable administrative costs incurred from the inspection and monitoring of activities thereunder.''.</DELETED> <DELETED> (e) Federal Permitting Process.--Not later than 1 year after the date of enactment of this Act, the Secretary of the Interior shall promulgate regulations and establish a Federal permitting process to allow for simultaneous, concurrent consideration of multiple phases of a geothermal project, including--</DELETED> <DELETED> (1) surface exploration;</DELETED> <DELETED> (2) geophysical exploration;</DELETED> <DELETED> (3) drilling;
and</DELETED> <DELETED> (4) power plant construction.</DELETED> <DELETED> (f) Geothermal Production Parity.--Section 390 of the Energy Policy Act of 2005 (42 U.S.C.
15942) is amended--</DELETED> <DELETED> (1) in subsection (a)--</DELETED> <DELETED> (A) by striking ``(NEPA)'' and inserting ``(42 U.S.C.
4321 et seq.) (referred to in this section as `NEPA')'';</DELETED> <DELETED> (B) by inserting ``(30 U.S.C.
181 et seq.)'' after ``Mineral Leasing Act'';
and</DELETED> <DELETED> (C) by inserting ``, or the Geothermal Steam Act of 1970 (30 U.S.C.
1001 et seq.) for the purpose of exploration or development of geothermal resources'' before the period at the end;
and</DELETED> <DELETED> (2) in subsection (b)--</DELETED> <DELETED> (A) in paragraph (2), by striking ``oil or gas'' and inserting ``oil, gas, or geothermal resources'';
and</DELETED> <DELETED> (B) in paragraph (3), by striking ``oil or gas'' and inserting ``oil, gas, or geothermal resources''.</DELETED> <DELETED> (g) Geothermal Ombudsman.--</DELETED> <DELETED> (1) In general.--Not later than 60 days after the date of enactment of this Act, the Secretary of the Interior shall appoint within the Bureau of Land Management a Geothermal Ombudsman.</DELETED> <DELETED> (2) Duties.--The Geothermal Ombudsman appointed under paragraph (1) shall--</DELETED> <DELETED> (A) act as a liaison between the individual field offices of the Bureau of Land Management and the Director of the Bureau of Land Management;</DELETED> <DELETED> (B) provide dispute resolution services between the individual field offices of the Bureau of Land Management and applicants for geothermal resource permits;</DELETED> <DELETED> (C) monitor and facilitate permit processing practices and timelines across individual field offices of the Bureau of Land Management;</DELETED> <DELETED> (D) develop best practices for the permitting and leasing process for geothermal resources;
and</DELETED> <DELETED> (E) coordinate with the Federal Permitting Improvement Steering Council.</DELETED> <DELETED> (3) Report.--The Geothermal Ombudsman shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives an annual report that describes the activities of the Geothermal Ombudsman and evaluates the effectiveness of geothermal permit processing during the preceding 1-year period.</DELETED> <DELETED>SEC.
209.
ELECTRIC GRID PROJECTS.</DELETED> <DELETED> (a) Definition of Previously Disturbed or Developed.--In this section, the term ``previously disturbed or developed'' has the meaning given the term in section 1021.410(g)(1) of title 10, Code of Federal Regulations (or successor regulations).</DELETED> <DELETED> (b) Rulemaking.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting, the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.) for the following activities:</DELETED> <DELETED> (1) Placement of an electric transmission or distribution facility in an approved right-of-way corridor, if the corridor was approved during the 5-year period ending on the date of placement of the facility.</DELETED> <DELETED> (2) Any repair, maintenance, replacement, upgrade, modification, optimization, or minor relocation of, or addition to, an existing electric transmission or distribution facility or associated infrastructure within an existing right-of-way or on otherwise previously disturbed or developed land, including reconductoring and installation of grid-enhancing technologies.</DELETED> <DELETED> (3) Construction, operation, upgrade, or decommissioning of a battery or other energy storage technology on previously disturbed or developed land.</DELETED> <DELETED>SEC.
210.
HARDROCK MINING MILL SITES.</DELETED> <DELETED> (a) Multiple Mill Sites.--Section 2337 of the Revised Statutes (30 U.S.C.
42) is amended by adding at the end the following:</DELETED> <DELETED> ``(c) Additional Mill Sites.--</DELETED> <DELETED> ``(1) Definitions.--In this subsection:</DELETED> <DELETED> ``(A) Mill site.--The term `mill site' means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations.</DELETED> <DELETED> ``(B) Operations;
operator.--The terms `operations' and `operator' have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection).</DELETED> <DELETED> ``(C) Plan of operations.--The term `plan of operations' means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable--</DELETED> <DELETED> ``(i) subpart 3809 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements);
and</DELETED> <DELETED> ``(ii) part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements).</DELETED> <DELETED> ``(D) Public land.--The term `public land' means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C.
22 et seq.), including-- </DELETED> <DELETED> ``(i) land that is mineral-in- character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));</DELETED> <DELETED> ``(ii) nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));
and</DELETED> <DELETED> ``(iii) land where the mineral character has not been determined.</DELETED> <DELETED> ``(2) In general.--Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may--</DELETED> <DELETED> ``(A) locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations;
and</DELETED> <DELETED> ``(B) use or occupy public land in accordance with an approved plan of operations.</DELETED> <DELETED> ``(3) Mill sites convey no mineral rights.--A mill site under this subsection does not convey mineral rights to the locator.</DELETED> <DELETED> ``(4) Size of mill sites.--A location of a single mill site under this subsection shall not exceed 5 acres.</DELETED> <DELETED> ``(5) Mill site and lode or placer claims on same tracts of public land.--A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim.</DELETED> <DELETED> ``(6) Effect on mining claims.--The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim.</DELETED> <DELETED> ``(7) Patenting.--A mill site under this section shall not be eligible for patenting.</DELETED> <DELETED> ``(8) Savings provisions.--Nothing in this subsection--</DELETED> <DELETED> ``(A) diminishes any right (including a right of entry, use, or occupancy) of a claimant;</DELETED> <DELETED> ``(B) creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws;</DELETED> <DELETED> ``(C) modifies any provision of law or any prior administrative action withdrawing land from location or entry;</DELETED> <DELETED> ``(D) limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under--</DELETED> <DELETED> ``(i) the general mining laws;</DELETED> <DELETED> ``(ii) the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1701 et seq.);</DELETED> <DELETED> ``(iii) the Wilderness Act (16 U.S.C.
1131 et seq.);</DELETED> <DELETED> ``(iv) sections 100731 through of title 54, United States Code;</DELETED> <DELETED> ``(v) the Endangered Species Act of 1973 (16 U.S.C.
1531 et seq.);</DELETED> <DELETED> ``(vi) division A of subtitle III of title 54, United States Code (commonly referred to as the `National Historic Preservation Act');
or</DELETED> <DELETED> ``(vii) section 4 of the Act of July 23, 1955 (commonly known as the `Surface Resources Act of 1955') (69 Stat.
368, chapter 375;
30 U.S.C.
612);</DELETED> <DELETED> ``(E) restores any right (including a right of entry, use, or occupancy, or right to conduct operations) of a claimant that--</DELETED> <DELETED> ``(i) existed prior to the date on which the land was closed to, or withdrawn from, location under the general mining laws;
and</DELETED> <DELETED> ``(ii) that has been extinguished by such closure or withdrawal;
or</DELETED> <DELETED> ``(F) modifies section 404 of division E of the Consolidated Appropriations Act, 2024 (Public Law 118-42).''.</DELETED> <DELETED> (b) Abandoned Hardrock Mine Fund.--</DELETED> <DELETED> (1) Establishment.--There is established in the Treasury of the United States a separate account, to be known as the ``Abandoned Hardrock Mine Fund'' (referred to in this subsection as the ``Fund'').</DELETED> <DELETED> (2) Source of deposits.--Any amounts collected by the Secretary of the Interior pursuant to the claim maintenance fee under section 10101(a)(1) of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C.
28f(a)(1)) on mill sites located under subsection (c) of section 2337 of the Revised Statutes (30 U.S.C.
42) shall be deposited into the Fund.</DELETED> <DELETED> (3) Use.--The Secretary of the Interior may make expenditures from amounts available in the Fund, without further appropriations, only to carry out section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C.
1245).</DELETED> <DELETED> (4) Allocation of funds.--Amounts made available under paragraph (3)--</DELETED> <DELETED> (A) shall be allocated in accordance with section 40704(e)(1) of the Infrastructure Investment and Jobs Act (30 U.S.C.
1245(e)(1));
and</DELETED> <DELETED> (B) may be transferred in accordance with section 40704(e)(2) of that Act (30 U.S.C.
1245(e)(2)).</DELETED> <DELETED> (c) Clerical Amendments.--Section 10101 of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C.
28f) is amended-- </DELETED> <DELETED> (1) by striking ``the Mining Law of 1872 (30 U.S.C.
28-28e)'' each place it appears and inserting ``sections through 2344 of the Revised Statutes (30 U.S.C.
22 et seq.)'';</DELETED> <DELETED> (2) in subsection (a)--</DELETED> <DELETED> (A) in paragraph (1)--</DELETED> <DELETED> (i) in the second sentence, by striking ``Such claim maintenance fee'' and inserting the following:</DELETED> <DELETED> ``(B) Fee.--The claim maintenance fee under subparagraph (A)'';
and</DELETED> <DELETED> (ii) in the first sentence, by striking ``The holder of'' and inserting the following:</DELETED> <DELETED> ``(A) In general.--The holder of'';
and</DELETED> <DELETED> (B) in paragraph (2)--</DELETED> <DELETED> (i) in the second sentence, by striking ``Such claim maintenance fee'' and inserting the following:</DELETED> <DELETED> ``(B) Fee.--The claim maintenance fee under subparagraph (A)'';
and</DELETED> <DELETED> (ii) in the first sentence, by striking ``The holder of'' and inserting the following:</DELETED> <DELETED> ``(A) In general.--The holder of'';
and</DELETED> <DELETED> (3) in subsection (b)--</DELETED> <DELETED> (A) in the second sentence, by striking ``The location fee'' and inserting the following:</DELETED> <DELETED> ``(2) Fee.--The location fee'';
and</DELETED> <DELETED> (B) in the first sentence, by striking ``The claim main tenance fee'' and inserting the following:</DELETED> <DELETED> ``(1) In general.--The claim maintenance fee''.</DELETED> <DELETED>TITLE III--FEDERAL OFFSHORE ENERGY LEASING AND PERMITTING</DELETED> <DELETED>SEC.
301.
OFFSHORE OIL AND GAS LEASING.</DELETED> <DELETED> (a) Requirement.--Notwithstanding the 2024-2029 National Outer Continental Shelf Oil and Gas Leasing Program (and any successor leasing program that does not satisfy the requirements of this section), the Secretary of the Interior (referred to in this title as the ``Secretary'') shall conduct not less than 1 oil and gas lease sale in each of calendar years 2025 through 2029, each of which shall be conducted not later than August 31 of the applicable calendar year.</DELETED> <DELETED> (b) Terms and Conditions.--The Secretary shall--</DELETED> <DELETED> (1) conduct offshore oil and gas lease sales of sufficient acreage to meet the conditions described in section 50265(b)(2) of Public Law 117-169 (43 U.S.C.
3006(b)(2));</DELETED> <DELETED> (2) with respect to an oil and gas lease sale conducted under subsection (a), offer the same lease form, lease terms, economic conditions, and stipulations as contained in the revised final notice of sale entitled ``Gulf of Mexico Outer Continental Shelf Oil and Gas Lease Sale 261'' (88 Fed.
Reg.
80750 (November 20, 2023));
and</DELETED> <DELETED> (3) if any acceptable bids have been received for any tract offered in an oil and gas lease sale conducted under subsection (a), issue such leases not later than 90 days after the lease sale to the highest bids on the tracts offered, subject to the procedures described in the Bureau of Ocean Energy Management document entitled ``Summary of Procedures for Determining Bid Adequacy at Offshore Oil and Gas Lease Sales Effective March 2016, with Central Gulf of Mexico Sale 241 and Eastern Gulf of Mexico Sale 226''.</DELETED> <DELETED>SEC.
302.
OFFSHORE WIND ENERGY.</DELETED> <DELETED> (a) Offshore Wind Lease Sale Requirement.--Effective on the date of enactment of this Act, the Secretary shall--</DELETED> <DELETED> (1) subject to the limitations described in section 50265(b)(2) of Public Law 117-169 (43 U.S.C.
3006(b)(2)), conduct not less than 1 offshore wind lease sale in each of calendar years 2025 through 2029, each of which shall be conducted not later than August 31 of the applicable calendar year;
and</DELETED> <DELETED> (2) if any acceptable bids have been received for a tract offered in the lease sale, as determined by the Secretary, issue such leases not later than 90 days after the lease sale to the highest bidder on the offered tract.</DELETED> <DELETED> (b) Area Offered for Leasing.--</DELETED> <DELETED> (1) Total acres for lease.--Subject to paragraph (2), the Secretary shall offer for offshore wind leasing a sum total of not less than 400,000 acres per calendar year.</DELETED> <DELETED> (2) Minimum acreage.--An offshore wind lease issued by the Secretary that is less than 80,000 acres shall not be counted toward the acreage requirement under paragraph (1).</DELETED> <DELETED> (c) Production Goal for Offshore Wind Energy.--</DELETED> <DELETED> (1) Initial goal.--Not later than 180 days after the date of enactment of this Act, the Secretary shall establish an initial target date for an offshore wind energy production goal of 30 gigawatts.</DELETED> <DELETED> (2) Periodic goal revision.--The Secretary shall, in consultation with the heads of other relevant Federal agencies, periodically revise national goals for offshore wind energy production on the outer Continental Shelf as initially established under paragraph (1).</DELETED> <DELETED> (d) Outer Continental Shelf Lands Act.--Section 8(p) of the Outer Continental Shelf Lands Act (43 U.S.C.
1337(p)) is amended-- </DELETED> <DELETED> (1) by striking paragraph (10) and inserting the following:</DELETED> <DELETED> ``(10) Applicability.--</DELETED> <DELETED> ``(A) In general.--Except as provided in subparagraph (B), this subsection does not apply to any area on the outer Continental Shelf within the exterior boundaries of any unit of the National Park System, the National Wildlife Refuge System, the National Marine Sanctuary System, or any National Monument.</DELETED> <DELETED> ``(B) Exception.--Notwithstanding subparagraph (A), the Secretary, in consultation with the Secretary of Commerce under section 304(d) of the National Marine Sanctuaries Act (16 U.S.C.
1434(d)), may grant rights-of-way on the outer Continental Shelf within units of the National Marine Sanctuary System for the transmission of electricity generated by or produced from renewable energy.'';
and</DELETED> <DELETED> (2) by adding at the end the following:</DELETED> <DELETED> ``(11) Duration of permits in marine sanctuaries.--Notwithstanding section 310(c)(2) of the National Marine Sanctuaries Act (16 U.S.C.
1441(c)(2)), any permit or authorization granted under that Act that authorizes the installation, operation, or maintenance of electric transmission cables on a right-of-way granted by the Secretary described in paragraph (10)(B) shall be issued for a term equal to the duration of the right-of-way granted by the Secretary.''.</DELETED> <DELETED> (e) Savings Clause.--Nothing in this section, or an amendment made by this section, modifies the limitations described in section 50265(b)(2) of Public Law 117-169 (43 U.S.C.
3006(b)(2)).</DELETED> <DELETED>TITLE IV--ELECTRIC TRANSMISSION</DELETED> <DELETED>SEC.
401.
TRANSMISSION PERMITTING.</DELETED> <DELETED> (a) Definitions.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (a) and inserting the following:</DELETED> <DELETED> ``(a) Definitions.--In this section:</DELETED> <DELETED> ``(1) Commission.--The term `Commission' means the Federal Energy Regulatory Commission.</DELETED> <DELETED> ``(2) Improved reliability.--The term `improved reliability' has the meaning given the term in section 225(a).</DELETED> <DELETED> ``(3) Secretary.--The term `Secretary' means the Secretary of Energy.</DELETED> <DELETED> ``(4) Transmission planning region.--The term `transmission planning region' has the meaning given the term in section 225(a).''.</DELETED> <DELETED> (b) Construction Permit.--Section 216(b) of the Federal Power Act (16 U.S.C.
824p(b)) is amended--</DELETED> <DELETED> (1) in the matter preceding paragraph (1), by striking ``Except'' and all that follows through ``finds that'' and inserting ``Except as provided in subsections (d)(1) and (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities necessary in the national interest if the Commission finds that'';</DELETED> <DELETED> (2) in paragraph (1)--</DELETED> <DELETED> (A) in subparagraph (A)(i), by inserting ``or modification'' after ``siting'';
and</DELETED> <DELETED> (B) in subparagraph (C)--</DELETED> <DELETED> (i) in the matter preceding clause (i), by inserting ``or modification'' after ``siting'';
and</DELETED> <DELETED> (ii) in clause (i), by striking ``the later of'' in the matter preceding subclause (I) and all that follows through the semicolon at the end of subclause (II) and inserting ``the date on which the application was filed with the State commission or other entity;'';
and</DELETED> <DELETED> (3) by striking paragraphs (2) through (6) and inserting the following:</DELETED> <DELETED> ``(2) the proposed facilities will be used for the transmission of electric energy in interstate (including transmission from the outer Continental Shelf to a State) or foreign commerce;</DELETED> <DELETED> ``(3) the proposed construction or modification is consistent with the public interest;</DELETED> <DELETED> ``(4) the proposed construction or modification will significantly reduce transmission congestion in interstate commerce, protect or benefit consumers, and provide improved reliability;</DELETED> <DELETED> ``(5) the proposed construction or modification is consistent with sound national energy policy and will enhance energy independence;</DELETED> <DELETED> ``(6) the electric transmission facilities are capable of transmitting electric energy at a voltage of not less than 100 kilovolts or, in the case of facilities that include advanced transmission conductors (including superconductors), as defined by the Commission, voltages determined to be appropriate by the Commission;
and</DELETED> <DELETED> ``(7) the proposed modification (including reconductoring) will maximize, to the extent reasonable and economical, the transmission capabilities of existing towers, structures, or rights-of-way.''.</DELETED> <DELETED> (c) State Siting and Consultation.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (d) and inserting the following:</DELETED> <DELETED> ``(d) State Siting and Consultation.--</DELETED> <DELETED> ``(1) Preservation of state siting authority.--The Commission shall have no authority to issue a permit under subsection (b) for the construction or modification of an electric transmission facility within a State except as provided in paragraph (1) of that subsection.</DELETED> <DELETED> ``(2) Consultation.--In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian Tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.''.</DELETED> <DELETED> (d) Rights-of-Way.--Section 216(e)(3) of the Federal Power Act (16 U.S.C.
824p(e)(3)) is amended by striking ``shall conform'' and all that follows through the period at the end and inserting ``shall be in accordance with rule 71.1 of the Federal Rules of Civil Procedure.''.</DELETED> <DELETED> (e) Cost Allocation.--</DELETED> <DELETED> (1) In general.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (f) and inserting the following:</DELETED> <DELETED> ``(f) Cost Allocation.--</DELETED> <DELETED> ``(1) Transmission tariffs.--For the purposes of this section, any transmitting utility that owns, controls, or operates electric transmission facilities that the Commission finds to be consistent with the findings under paragraphs (2) through (6) and, if applicable, (7) of subsection (b) shall file a tariff or tariff revision with the Commission pursuant to section 205 and the regulations of the Commission allocating the costs of the new or modified transmission facilities.</DELETED> <DELETED> ``(2) Transmission benefits.--The Commission shall require that tariffs or tariff revisions filed under this subsection are just and reasonable and allocate the costs of providing service to customers that benefit, in accordance with the cost-causation principle, including through--</DELETED> <DELETED> ``(A) improved reliability;</DELETED> <DELETED> ``(B) reduced congestion;</DELETED> <DELETED> ``(C) reduced power losses;</DELETED> <DELETED> ``(D) greater carrying capacity;</DELETED> <DELETED> ``(E) reduced operating reserve requirements;
and</DELETED> <DELETED> ``(F) improved access to lower cost generation that achieves reductions in the cost of delivered power.</DELETED> <DELETED> ``(3) Ratepayer protection.--Customers that receive no benefit, or benefits that are trivial in relation to the costs sought to be allocated, from electric transmission facilities constructed or modified under this section shall not be involuntarily allocated any of the costs of those transmission facilities.''.</DELETED> <DELETED> (2) Savings provision.--If the Federal Energy Regulatory Commission finds that the considerations under paragraphs (2) through (6) and, if applicable, (7) of subsection (b) of section 216 of the Federal Power Act (16 U.S.C.
824p) (as amended by subsection (b)) are met, nothing in this section or the amendments made by this section shall be construed to exclude transmission facilities located on the outer Continental Shelf from being eligible for cost allocation established under subsection (f)(1) of that section (as amended by paragraph (1)).</DELETED> <DELETED> (f) Coordination of Federal Authorizations for Transmission Facilities.--Section 216(h) of the Federal Power Act (16 U.S.C.
824p(h)) is amended--</DELETED> <DELETED> (1) in paragraph (2), by striking the period at the end and inserting the following:
``, except that-- </DELETED> <DELETED> ``(A) the Commission shall act as the lead agency in the case of facilities permitted under subsection (b) and section 225;
and</DELETED> <DELETED> ``(B) the Department of the Interior shall act as the lead agency in the case of facilities located on a lease, easement, or right-of-way granted by the Secretary of the Interior under section 8(p)(1)(C) of the Outer Continental Shelf Lands Act (43 U.S.C.
1337(p)(1)(C)).'';</DELETED> <DELETED> (2) in each of paragraphs (3), (4)(B), (4)(C), (5)(B), (6)(A), (7)(A), (7)(B)(i), (8)(A)(i), and (9), by striking ``Secretary'' each place it appears and inserting ``lead agency'';</DELETED> <DELETED> (3) in paragraph (4)(A), by striking ``As head of the lead agency, the Secretary'' and inserting ``The lead agency'';</DELETED> <DELETED> (4) in paragraph (5)(A), by striking ``As lead agency head, the Secretary'' and inserting ``The lead agency'';
and</DELETED> <DELETED> (5) in paragraph (7)--</DELETED> <DELETED> (A) in subparagraph (A), by striking ``18 months after the date of enactment of this section'' and inserting ``18 months after the date of enactment of the Energy Permitting Reform Act of 2024'';
and</DELETED> <DELETED> (B) in subparagraph (B)(i), by striking ``1 year after the date of enactment of this section'' and inserting ``18 months after the date of enactment of the Energy Permitting Reform Act of 2024''.</DELETED> <DELETED> (g) Interstate Compacts.--Section 216(i) of the Federal Power Act (16 U.S.C.
824p(i)) is amended--</DELETED> <DELETED> (1) in paragraph (3), by striking ``, including facilities in national interest electric transmission corridors'';
and</DELETED> <DELETED> (2) in paragraph (4)--</DELETED> <DELETED> (A) in subparagraph (A), by striking ``;
and'' and inserting a period;</DELETED> <DELETED> (B) by striking subparagraph (B);
and</DELETED> <DELETED> (C) by striking ``in disagreement'' in the matter preceding subparagraph (A) and all that follows through ``(A) the'' in subparagraph (A) and inserting ``unable to reach an agreement on an application seeking approval by the''.</DELETED> <DELETED> (h) Transmission Infrastructure Investment.--Section 219(b)(4) of the Federal Power Act (16 U.S.C.
824s(b)(4)) is amended-- </DELETED> <DELETED> (1) in subparagraph (A), by striking ``and'' after the semicolon at the end;</DELETED> <DELETED> (2) in subparagraph (B), by striking the period at the end and inserting ``;
and'';
and</DELETED> <DELETED> (3) by adding at the end the following:</DELETED> <DELETED> ``(C) all prudently incurred costs associated with payments to jurisdictions impacted by electric transmission facilities developed pursuant to section 216 or 225.''.</DELETED> <DELETED> (i) Jurisdiction.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (k) and inserting the following:</DELETED> <DELETED> ``(k) Jurisdiction.--</DELETED> <DELETED> ``(1) ERCOT.--This section shall not apply within the area referred to in section 212(k)(2)(A).</DELETED> <DELETED> ``(2) Other utilities.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).''.</DELETED> <DELETED> (j) Conforming Amendments.--</DELETED> <DELETED> (1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
18715(b)) is amended by striking ``facilities designated by the Secretary to be necessary in the national interest under section 216(a) of the Federal Power Act (16 U.S.C.
824p(a))'' and inserting ``facilities in a geographic area identified under section 224 of the Federal Power Act''.</DELETED> <DELETED> (2) Section 1222 of the Energy Policy Act of 2005 (42 U.S.C.
16421) is amended--</DELETED> <DELETED> (A) in subsection (a)(1)(A), by striking ``in a national interest electric transmission corridor designated under section 216(a)'' and inserting ``in a geographic area identified under section 224'';
and</DELETED> <DELETED> (B) in subsection (b)(1)(A), by striking ``in an area designated under section 216(a)'' and inserting ``in a geographic area identified under section 224''.</DELETED> <DELETED> (3) Section 40106(h)(1)(A) of the Infrastructure Investment and Jobs Act (42 U.S.C.
18713(h)(1)(A)) is amended by striking ``in an area designated as a national interest electric transmission corridor pursuant to section 216(a) of the Federal Power Act 16 U.S.C.
824p(a)'' and inserting ``in a geographic area identified under section 224 of the Federal Power Act''.</DELETED> <DELETED> (k) Savings Provision.--Nothing in this section or an amendment made by this section grants authority to the Federal Energy Regulatory Commission under the Federal Power Act (16 U.S.C.
791a et seq.) over sales of electric energy at retail or the local distribution of electricity.</DELETED> <DELETED>SEC.
402.
TRANSMISSION PLANNING.</DELETED> <DELETED> (a) In General.--Part II of the Federal Power Act (16 U.S.C.
824 et seq.) is amended by adding at the end the following:</DELETED> <DELETED>``SEC.
224.
TRANSMISSION STUDY.</DELETED> <DELETED> ``(a) In General.--Not later than 1 year after the date of enactment of this section and every 3 years thereafter, the Secretary of Energy (referred to in this section as the `Secretary'), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion.</DELETED> <DELETED> ``(b) Report.--Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under subsection (a) or other information relating to electric transmission capacity constraints and congestion, which may identify any geographic area that--</DELETED> <DELETED> ``(1) is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers;
or</DELETED> <DELETED> ``(2) is expected to experience such energy transmission capacity constraints or congestion.</DELETED> <DELETED> ``(c) Consultation.--Not less frequently than once every 3 years, the Secretary, in conducting the study under subsection (a) and issuing the report under subsection (b), shall consult with affected transmission planning regions (as defined in section 225(a)) and any appropriate regional entity referred to in section 215.</DELETED> <DELETED>``SEC.
225.
PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE GRID RELIABILITY, AFFORDABILITY, AND RESILIENCE.</DELETED> <DELETED> ``(a) Definitions.--In this section:</DELETED> <DELETED> ``(1) Commission.--The term `Commission' means the Federal Energy Regulatory Commission.</DELETED> <DELETED> ``(2) ERO.--The term `ERO' has the meaning given the term in section 215(a).</DELETED> <DELETED> ``(3) Improved reliability.--The term `improved reliability' means that, on balance, considering each of the matters described in subparagraphs (A) through (D), reliability is improved in a material manner that benefits customers through at least one of the following:</DELETED> <DELETED> ``(A) facilitating compliance with a mandatory standard for reliability approved by the Commission under section 215;</DELETED> <DELETED> ``(B) a reduction in expected unserved energy, loss of load hours, or loss of load probability (as defined by the ERO);</DELETED> <DELETED> ``(C) facilitating compliance with a tariff requirement or process for resource adequacy on file with the Commission;
and</DELETED> <DELETED> ``(D) any other similar material improvement, including a reduction in correlated outage risk, such as achieved through increased geographic or resource diversification.</DELETED> <DELETED> ``(4) Interregional transmission facility.--The term `interregional transmission facility' means a transmission facility that--</DELETED> <DELETED> ``(A) is located within 2 or more neighboring transmission planning regions;
or</DELETED> <DELETED> ``(B) significantly impacts the ability of or more transmission planning regions to transmit electric energy among neighboring transmission planning regions.</DELETED> <DELETED> ``(5) Transmission planning region.--</DELETED> <DELETED> ``(A) In general.--The term `transmission planning region'--</DELETED> <DELETED> ``(i) when used in a geographical sense, means a region for which the Commission determines that electric transmission planning is appropriate, such as a region established in accordance with Order No.
1000 of the Commission, entitled `Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities' (76 Fed.
Reg.
49842 (August 11, 2011));
and</DELETED> <DELETED> ``(ii) when used in a corporate sense, means the Transmission Organization or other entity responsible for planning or operating electric transmission facilities within a region described in clause (i).</DELETED> <DELETED> ``(B) Exclusion.--The term `transmission planning region' does not include the Electric Reliability Council of Texas or the region served by members of the Electric Reliability Council of Texas.</DELETED> <DELETED> ``(b) Jurisdiction.--</DELETED> <DELETED> ``(1) ERCOT.--This section shall not apply within the area referred to in section 212(k)(2)(A).</DELETED> <DELETED> ``(2) Other utilities.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).</DELETED> <DELETED> ``(c) Rulemaking Requirement.--Not later than 180 days after the date of enactment of this section, the Commission shall, consistent with the requirements of this section, by rule--</DELETED> <DELETED> ``(1) require neighboring transmission planning regions to jointly plan with each other;</DELETED> <DELETED> ``(2) require each transmission planning region to submit to the Commission for approval a joint interregional transmission plan with each of its neighboring transmission planning regions, which requirement may, at the discretion of the transmission planning region, be satisfied through the submission of--</DELETED> <DELETED> ``(A) a separate joint interregional transmission plan with each of its neighboring transmission planning regions;
or</DELETED> <DELETED> ``(B) 1 or more joint interregional transmission plans, any of which may be submitted with any 1 or more of its neighboring transmission planning regions;
and</DELETED> <DELETED> ``(3) establish rate treatments for interregional transmission planning and cost allocation.</DELETED> <DELETED> ``(d) Plan Elements.--The Commission shall require, within the rule under subsection (c), that joint interregional transmission plans contain the following elements:</DELETED> <DELETED> ``(1) Compatibility.--A common set of input assumptions and models, on a consistent timeline, that-- </DELETED> <DELETED> ``(A) allow for the joint identification and selection, by transmission planning regions, of specific interregional transmission facilities for construction or modification, including through the use of advanced transmission conductors (including superconductors) and reconductoring;</DELETED> <DELETED> ``(B) consider, to the extent reasonable and economical, modifications that maximize the transmission capabilities of existing towers, structures, or rights-of-way;
and</DELETED> <DELETED> ``(C) consider existing transmission plans.</DELETED> <DELETED> ``(2) Transmission benefits.--A common set of benefits for interregional transmission planning and cost allocation, including--</DELETED> <DELETED> ``(A) improved reliability;</DELETED> <DELETED> ``(B) reduced congestion;</DELETED> <DELETED> ``(C) reduced power losses;</DELETED> <DELETED> ``(D) greater carrying capacity;</DELETED> <DELETED> ``(E) reduced operating reserve requirements;
and</DELETED> <DELETED> ``(F) improved access to lower cost generation that achieves reductions in the cost of delivered power.</DELETED> <DELETED> ``(3) Selection criteria.--Criteria governing the selection by transmission planning regions, for construction or modification, of interregional transmission facilities that-- </DELETED> <DELETED> ``(A) provide improved reliability;</DELETED> <DELETED> ``(B) protect or benefit consumers;
and</DELETED> <DELETED> ``(C) are consistent with the public interest.</DELETED> <DELETED> ``(e) Deadline;
Updates.--The joint interregional transmission plans required to be submitted to the Commission pursuant to the rule under subsection (c) shall be--</DELETED> <DELETED> ``(1) submitted to the Commission not later than 2 years after the date of enactment of this section;
and</DELETED> <DELETED> ``(2) updated not less frequently than once every years.</DELETED> <DELETED> ``(f) Commission Review.--The Commission shall--</DELETED> <DELETED> ``(1) review each joint interregional transmission plan submitted pursuant to the rule under subsection (c);
and</DELETED> <DELETED> ``(2) approve the joint interregional transmission plan if the Commission finds that the plan--</DELETED> <DELETED> ``(A) meets the requirements of subsection (d);</DELETED> <DELETED> ``(B) allocates costs in accordance with subsection (g);</DELETED> <DELETED> ``(C) ensures that all rates, charges, terms, and conditions will be just and reasonable and not unduly discriminatory or preferential;
and</DELETED> <DELETED> ``(D) is consistent with the public interest.</DELETED> <DELETED> ``(g) Cost Allocation.--</DELETED> <DELETED> ``(1) Transmission tariffs.--For the purposes of this section, any transmitting utility that owns, controls, or operates electric transmission facilities constructed or modified as a result of this section shall file a tariff or tariff revision with the Commission pursuant to section 205 and the regulations of the Commission allocating the costs of the new or modified transmission facilities.</DELETED> <DELETED> ``(2) Requirement.--The Commission shall require that tariffs or tariff revisions filed under this section are just and reasonable and allocate the costs of providing service to customers that benefit, in accordance with the cost- causation principle, including through the benefits described in subsection (d)(2).</DELETED> <DELETED> ``(3) Ratepayer protection.--Customers that receive no benefit, or benefits that are trivial in relation to the costs sought to be allocated, from electric transmission facilities constructed or modified under this section shall not be involuntarily allocated any of the costs of those transmission facilities.</DELETED> <DELETED> ``(h) Construction Permit.--For the purposes of obtaining a construction permit under section 216(b), a project that is selected by transmission planning regions pursuant to a joint interregional transmission plan shall be considered to satisfy paragraphs (2) through (6) and, if applicable, (7) of that section.</DELETED> <DELETED> ``(i) Dispute Resolution.--In the event of a dispute between transmission planning regions with respect to a material element of a joint interregional transmission plan--</DELETED> <DELETED> ``(1) the transmission planning regions shall submit to the Commission their respective proposals for resolving the material element in dispute for resolution;
and</DELETED> <DELETED> ``(2) not later than 60 days after the proposals are submitted under paragraph (1), the Commission shall issue an order directing a resolution to the dispute.</DELETED> <DELETED> ``(j) Failure To Submit Plan.--In the event that neighboring transmission planning regions fail to submit to the Commission a joint interregional transmission plan under this section, the Commission shall, as the Commission determines to be appropriate-- </DELETED> <DELETED> ``(1) grant a request to extend the time for submission of the joint interregional transmission plan;
or</DELETED> <DELETED> ``(2) require, by order, the transmitting utilities within the affected transmission planning regions to comply with a joint interregional transmission plan approved by the Commission--</DELETED> <DELETED> ``(A) based on the record of the planning process conducted by the affected transmission planning regions;
and</DELETED> <DELETED> ``(B) in accordance with the cost allocation provisions in subsection (g).</DELETED> <DELETED> ``(k) NEPA.--For purposes of the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.)--</DELETED> <DELETED> ``(1) any approval of a joint interregional transmission plan under subsection (f) or (j) or order directing resolution of a dispute under subsection (i) shall not be considered a major Federal action;
and</DELETED> <DELETED> ``(2) any permit granted under section 216(b) for a project that is selected by transmission planning regions pursuant to a joint interregional transmission plan shall be considered a major Federal action.</DELETED> <DELETED> ``(l) Savings Provision.--Except as expressly provided in this section, nothing in this section shall be construed as conferring, limiting, or impairing any authority of the Commission under any other provision of law.''.</DELETED> <DELETED> (b) Conforming Amendments.--Section 201 of the Federal Power Act (16 U.S.C.
824) is amended--</DELETED> <DELETED> (1) in subsection (b)(2)--</DELETED> <DELETED> (A) in the first sentence, by striking ``and 222'' and inserting ``222, and 225'';
and</DELETED> <DELETED> (B) in the second sentence, by striking ``or 222'' and inserting ``222, or 225'';
and</DELETED> <DELETED> (2) in subsection (e)--</DELETED> <DELETED> (A) by striking ``206(f),'';
and</DELETED> <DELETED> (B) by striking ``or 222'' and inserting ``222, or 225''.</DELETED> <DELETED> (c) Savings Provision.--Nothing in this section or an amendment made by this section grants authority to the Federal Energy Regulatory Commission under the Federal Power Act (16 U.S.C.
791a et seq.) over sales of electric energy at retail or the local distribution of electricity.</DELETED> <DELETED>TITLE V--ELECTRIC RELIABILITY</DELETED> <DELETED>SEC.
501.
RELIABILITY ASSESSMENTS.</DELETED> <DELETED> Section 215 of the Federal Power Act (16 U.S.C.
824o) is amended by striking subsection (g) and inserting the following:</DELETED> <DELETED> ``(g) Reliability Reports.--</DELETED> <DELETED> ``(1) Periodic assessments.--The ERO shall conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.</DELETED> <DELETED> ``(2) Reliability assessments for regulations.-- (A) Whenever the Commission determines, on its own motion or on request from another Federal agency, an affected transmission organization, or any State commission, that a rule, regulation, or standard proposed by a Federal agency other than the Commission is likely to result in a violation of a tariff requirement or process for resource adequacy on file with the Commission or a mandatory standard for reliability approved by the Commission, the Commission shall require, by order, the ERO to assess and report on the effects of the proposed rule, regulation, or standard on the reliable operation of the bulk- power system.</DELETED> <DELETED> ``(B) An ERO reliability assessment ordered under subparagraph (A) shall--</DELETED> <DELETED> ``(i) identify any reasonably foreseeable significant adverse effects on the reliable operation of the bulk-power system that the ERO anticipates will result from the proposed rule, regulation, or standard;</DELETED> <DELETED> ``(ii) account for mitigations that will be available under existing rules, regulations, or tariffs governing facilities of the bulk-power system under this Act that will reduce or prevent significant adverse effects on the reliable operation of the bulk- power system from the proposed rule, regulation, or standard;
and</DELETED> <DELETED> ``(iii) take into account the technical views of affected transmission organizations regarding effects on the reliable operation of the bulk-power system from the proposed rule, regulation, or standard.</DELETED> <DELETED> ``(C) The ERO shall--</DELETED> <DELETED> ``(i) submit the report required under subparagraph (A) to the public docket of the Federal agency proposing the rule, regulation, or standard, and, if practicable, make such submission within the time period established by such Federal agency for submission of public comments on the proposed rule, regulation, or standard;</DELETED> <DELETED> ``(ii) submit such report to the Commission;
and</DELETED> <DELETED> ``(iii) publish such report in a publicly available format.</DELETED> <DELETED> ``(D) This paragraph shall apply to proposed rules, regulations, or standards pending on, or proposed on or after, the date of enactment of this paragraph.''.</DELETED> <DELETED>TITLE VI--LIQUEFIED NATURAL GAS EXPORTS</DELETED> <DELETED>SEC.
601.
ACTION ON APPLICATIONS.</DELETED> <DELETED> Section 3 of the Natural Gas Act (15 U.S.C.
717b) is amended--</DELETED> <DELETED> (1) in subsection (e)(3)(A), by inserting ``and subsection (g)'' after ``subparagraph (B)'';
and</DELETED> <DELETED> (2) by adding at the end the following:</DELETED> <DELETED> ``(g) Deadline To Act on Certain Export Applications.-- </DELETED> <DELETED> ``(1) In general.--The Commission shall grant or deny an application under subsection (a) to export to a foreign country any natural gas from the United States not later than days after the later of--</DELETED> <DELETED> ``(A) the date on which the notice of availability for each final review required under the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) for the exporting facility is published with respect to an application--</DELETED> <DELETED> ``(i) under subsection (e);
or</DELETED> <DELETED> ``(ii) for a license for the ownership, construction, or operation of a deepwater port, under section 4 of the Deepwater Port Act of 1974 (33 U.S.C.
1503);
and</DELETED> <DELETED> ``(B) the date of enactment of this subsection.</DELETED> <DELETED> ``(2) Applications to re-export.--The Commission shall grant or deny an application under subsection (a) to re- export to another foreign country any natural gas that has been exported from the United States to Canada or Mexico for liquefaction in Canada or Mexico, or the territorial waters of Canada or Mexico, not later than 90 days after the later of-- </DELETED> <DELETED> ``(A) the date on which the notice of availability for each draft review required under the National Environmental Policy Act of 1969 (42 U.S.C.
et seq.) for the application is published;
and</DELETED> <DELETED> ``(B) the date of enactment of this subsection.</DELETED> <DELETED> ``(3) Applications for extensions.--The Commission shall grant or deny an application for an extension of a previously issued authorization to export natural gas described in paragraph (1) or (2) not later than 90 days after the later of--</DELETED> <DELETED> ``(A) the date the application for extension is received by the Commission;
and</DELETED> <DELETED> ``(B) the date of enactment of this subsection.</DELETED> <DELETED> ``(4) Failure to act.--If the Commission fails to grant or deny an application subject to this subsection by the applicable date required by this subsection, the application shall be considered to be granted and a final agency order.''.</DELETED> <DELETED>SEC.
602.
SUPPLEMENTAL REVIEWS.</DELETED> <DELETED> (a) Definitions.--In this section:</DELETED> <DELETED> (1) 2018 lng export study.--The term ``2018 LNG Export Study'' means the report entitled ``Macroeconomic Outcomes of Market Determined Levels of U.S.
LNG Exports'', prepared by NERA Economic Consulting for the National Energy Technology Laboratory of the Department of Energy, published June 7, 2018.</DELETED> <DELETED> (2) 2019 life cycle ghg review.--The term ``2019 Life Cycle GHG Review'' means the report entitled ``Life Cycle Greenhouse Gas Perspective on Exporting Liquefied Natural Gas from the United States'', prepared by S.
Roman-White, S.
Rai, J.
Littlefield, G.
Cooney, and T.
J.
Skone for the National Energy Technology Laboratory of the Department of Energy, published September 12, 2019.</DELETED> <DELETED> (3) Secretary.--The term ``Secretary'' means the Secretary of Energy.</DELETED> <DELETED> (4) Supplemental greenhouse gas review.--The term ``supplemental greenhouse gas review'' means a review prepared or commissioned by the Department of Energy and published after January 26, 2024, that analyzes the life cycle greenhouse gas emissions of liquefied natural gas exports from the United States, including consideration of the modeling parameters used in the 2019 Life Cycle GHG Review.</DELETED> <DELETED> (5) Supplemental macroeconomic review.--The term ``supplemental macroeconomic review'' means a review prepared or commissioned by the Department of Energy and published after January 26, 2024, that analyzes the macroeconomic outcomes of different levels of liquefied natural gas exports from the United States, including consideration of the natural gas market factors and macroeconomic factors analyzed in the 2018 LNG Export Study.</DELETED> <DELETED> (6) Supplemental review.--The term ``supplemental review'' means a supplemental greenhouse gas review or a supplemental macroeconomic review.</DELETED> <DELETED> (b) Requirements for Supplemental Reviews.--</DELETED> <DELETED> (1) Notice and comment on proposed supplemental reviews.--Before finalizing a supplemental review, the Secretary shall publish a notice of availability of the proposed supplemental review in the Federal Register pursuant to the notice and comment provisions of section 553 of title 5, United States Code.</DELETED> <DELETED> (2) Quality of supplemental reviews.--A supplemental review shall be subject to a peer review process consistent with the final bulletin of the Office of Management and Budget entitled ``Final Information Quality Bulletin for Peer Review'' (70 Fed.
Reg.
2664 (January 14, 2005)) (or successor guidance).</DELETED> <DELETED> (3) Pending applications.--For a review of an application to grant, deny, or extend an order under section 3(a) of the Natural Gas Act (15 U.S.C.
717b(a)) to export to a foreign country any natural gas from an LNG terminal in the United States or from a facility subject to section 4 of the Deepwater Port Act of 1974 (33 U.S.C.
1503), or to re-export to another foreign country any natural gas that has been exported from the United States to Canada or Mexico for liquefaction in Canada or Mexico, or the territorial waters of Canada or Mexico, the Secretary shall base any evaluation of--</DELETED> <DELETED> (A) macroeconomic outcomes on the results of the 2018 LNG Export Study, or predecessor documents, unless and until the Secretary finalizes and implements a supplemental macroeconomic review;
and</DELETED> <DELETED> (B) life cycle greenhouse gas emissions on the results of the 2019 Life Cycle GHG Review, or predecessor documents, unless and until the Secretary finalizes and implements a supplemental greenhouse gas review.</DELETED> <DELETED>TITLE VII--HYDROPOWER</DELETED> <DELETED>SEC.
701.
HYDROPOWER LICENSE EXTENSIONS.</DELETED> <DELETED> (a) Definition of Covered Project.--In this section, the term ``covered project'' means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020.</DELETED> <DELETED> (b) Authorization of Extension.--Notwithstanding section of the Federal Power Act (16 U.S.C.
806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for an additional 4 years beyond the 8 years authorized by that section.</DELETED> <DELETED> (c) Period of Extension.--An extension of time to commence construction of a covered project under subsection (b) shall-- </DELETED> <DELETED> (1) begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C.
806) expires;
and</DELETED> <DELETED> (2) end on the date that is 4 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section.</DELETED> <DELETED> (d) Reinstatement of Expired License.--If the time period required under section 13 of the Federal Power Act (16 U.S.C.
806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act--</DELETED> <DELETED> (1) the Commission may reinstate the license for the applicable project effective as of the date of expiration of the license;
and</DELETED> <DELETED> (2) the extension authorized under subsection (b) shall take effect on the date of that expiration.</DELETED> SECTION 1.
SHORT TITLE;
Sec.
702.
Identifying and removing market barriers to hydropower.
Sec.
703.
Regulations to align timetables.
TITLE VIII--HIRING AND RETENTION Sec.
801.
Federal Energy Regulatory Commission staffing.
Sec.
802.
Compensation flexibility to address retention and hiring issues at the Bonneville Power Administration.
Sec.
803.
Northwest Power and Conservation Council.
Sec.
804.
Federal Energy Regulatory Commission personnel safety.
(B) Inclusions.--The term ``authorization'' includes-- (i) agency approvals of lease sales, permits, or plans required to explore for, develop, or produce minerals under-- (I) the Mineral Leasing Act (30 U.S.C.
(B) Inclusions.--The term ``authorization'' includes-- (i) agency approvals of lease sales, permits, rights-of-way, or plans required to explore for, develop, or produce energy or minerals under-- (I) the Mineral Leasing Act (30 U.S.C.
or (VI) the Geothermal Steam Act of (30 U.S.C.
(VI) the Geothermal Steam Act of (30 U.S.C.
and (ii) statements or permits for a project under sections 7 and 10 of the Endangered Species Act of 1973 (16 U.S.C.
(VII) the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1536, 1539).
1701 et seq.);
or (VIII) title I of the Naval Petroleum Reserves Production Act (42 U.S.C.
6501 et seq.);
(ii) statements or permits for a project under sections 7 and 10 of the Endangered Species Act of 1973 (16 U.S.C.
1536, 1539);
and (iii) agency approvals under the Healthy Forests Restoration Act of 2003 (16 U.S.C.
6501 et seq.) of hazardous fuel reduction and forest restoration projects.
(3) Project.--The term ``project'' means a project-- (A) proposed for the construction of infrastructure-- (i) to develop, produce, generate, store, transport, or distribute energy;
(3) Project.--The term ``project'' means a project-- (A) proposed for-- (i) the construction of infrastructure-- (I) to develop, produce, generate, store, transport, or distribute energy;
(ii) to capture, remove, transport, or store carbon dioxide;
(II) to capture, remove, transport, or store carbon dioxide;
or (iii) to mine, extract, beneficiate, or process minerals;
or (III) to mine, extract, beneficiate, or process minerals;
or (ii) hazardous fuel reduction and forest restoration for the protection of infrastructure or communities from wildfire;
(g) Permitting Council.--Nothing in this title precludes a project from being designated as a covered project (as defined in section 41001 of the FAST Act (42 U.S.C.
4370m)) for the purposes of title XLI of that Act (42 U.S.C.
4370m et seq.).
(a) Limitation on Issuance of Certain Leases or Rights-of-Way.-- Section 50265(b)(1)(B) of Public Law 117-169 (43 U.S.C.
(a) Limitation on Issuance of Certain Leases or Rights-of-way.-- Section 50265(b)(1)(B) of Public Law 117-169 (43 U.S.C.
3006(b)(1)(B)) is amended, in the matter preceding clause (i), by inserting ``for which expressions of interest have been submitted that have been'' after ``sum of total acres''.
3006(b)(1)(B)) is amended, in the matter preceding clause (i), by inserting ``, including only acres that were nominated in previously submitted expressions of interest,'' after ``energy development''.
``(B) Retroactivity.--In addition to all approved applications for permits to drill submitted on or after the date of enactment of this paragraph, subparagraph (A) shall apply to-- ``(i) all permits approved during the 2- year period preceding the date of enactment of this paragraph;
``(B) Retroactivity.--In addition to all approved applications for permits to drill submitted on or after the date of enactment of this paragraph, subparagraph (A) shall apply to-- ``(i) all valid, unexpired permits in effect on the date of enactment of this paragraph;
The first section of the Act of February 5, 1948 (62 Stat.
The Act of February 5, 1948 (62 Stat.
17, chapter 45), is amended-- (1) in the first section (62 Stat.
323), is amended by adding at the end the following:
323), by striking ``That the Secretary of the Interior be, and he is hereby, empowered to'' and inserting the following:
``Any right-of-way granted by an Indian tribe for the purposes authorized under this section shall not require the approval of the Secretary of the Interior, on the condition that the right-of- way approval process by the Indian tribe substantially complies with subsection (h) of the first section of the Act of August 9, 1955 (69 Stat.
``SECTION 1.
539, chapter 615;
RIGHTS-OF-WAY FOR ALL PURPOSES ACROSS INDIAN LAND.
``The Secretary of the Interior may'';
(2) in section 2 (62 Stat.
18, chapter 45;
415(h)) or the Indian tribe has approved regulations under paragraph (1) of that subsection.''.
324), by striking ``organized under the Act of June 18, 1934 (48 Stat.
984), as amended;
the Act of May 1, 1936 (49 Stat.
1250);
or the Act of June 26, 1936 (49 Stat.
1967),'';
and (3) by adding at the end the following:
``SEC.
8.
TRIBAL GRANTS OF RIGHTS-OF-WAY.
``(a) Rights-of-way.-- ``(1) In general.--Subject to paragraph (2), an Indian tribe may grant a right-of-way over and across the Tribal land of the Indian tribe for any purpose.
``(2) Authority.--A right-of-way granted under paragraph (1) shall not require the approval of the Secretary of the Interior or a grant by the Secretary of the Interior under section 1 if the right-of-way granted under that paragraph is executed in accordance with a Tribal regulation approved by the Secretary of the Interior under subsection (b).
``(b) Review of Tribal Regulations.-- ``(1) Tribal regulation submission and approval.-- ``(A) Submission.--An Indian tribe seeking to grant a right-of-way under subsection (a) shall submit for approval a Tribal regulation governing the granting of rights-of-way over and across the Tribal land of the Indian tribe.
``(B) Approval.--Subject to paragraph (2), the Secretary of the Interior shall have the authority to approve or disapprove any Tribal regulation submitted under subparagraph (A).
``(2) Considerations for approval.-- ``(A) In general.--The Secretary of the Interior shall approve a Tribal regulation submitted under paragraph (1)(A), if the Tribal regulation-- ``(i) is consistent with any regulations (or successor regulations) issued by the Secretary of the Interior under section 6;
``(ii) provides for an environmental review process that includes-- ``(I) the identification and evaluation of any significant impacts the proposed action may have on the environment;
and ``(II) a process for ensuring-- ``(aa) that the public is informed of, and has a reasonable opportunity to comment on, any significant environmental impacts of the proposed action identified by the Indian tribe under subclause (I);
and ``(bb) the Indian tribe provides a response to each relevant and substantive public comment on the significant environmental impacts identified by the Indian tribe under subclause (I) before the Indian tribe approves the right-of-way.
``(B) Applicable laws.--The Secretary of the Interior, in making a decision to approve a Tribal regulation under this subsection, shall not be subject to-- ``(i) the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.);
``(ii) section 306108 of title 54, United States Code;
or ``(iii) the Endangered Species Act of 1973 (16 U.S.C.
1531 et seq.).
``(3) Review process.-- ``(A) In general.--Not later than 180 days after the date on which the Indian tribe submits a Tribal regulation to the Secretary of the Interior under paragraph (1)(A), the Secretary of the Interior shall-- ``(i) review the Tribal regulation;
``(ii) approve or disapprove the Tribal regulation;
and ``(iii) notify the Indian tribe that submitted the Tribal regulation of the approval or disapproval.
``(B) Written documentation.--If the Secretary of the Interior disapproves a Tribal regulation submitted under paragraph (1)(A), the Secretary of the Interior shall include with the disapproval notification under subparagraph (A)(iii) written documentation describing the basis for the disapproval.
``(C) Extension.--The Secretary of the Interior may, after consultation with the Indian tribe that submitted a Tribal regulation under paragraph (1)(A), extend the 180-day period described in subparagraph (A).
``(4) Federal environmental review.--Notwithstanding paragraphs (2) and (3), if an Indian tribe carries out a project or activity funded by a Federal agency, the Indian tribe may rely on the environmental review process of the applicable Federal agency rather than any Tribal environmental review process required under this subsection.
``(c) Documentation.--An Indian tribe granting a right-of-way under subsection (a) shall provide to the Secretary of the Interior-- ``(1) a copy of the right-of-way, including any amendments or renewals;
and ``(2) if the right-of-way allows for compensation to be made directly to the Indian tribe, documentation of payments that are sufficient, as determined by the Secretary of the Interior, as to enable the Secretary of the Interior to discharge the trust responsibility of the United States under subsection (d).
``(d) Trust Responsibility.-- ``(1) In general.--The United States shall not be liable for losses sustained by any party to a right-of-way granted under subsection (a).
``(2) Authority of the secretary.-- ``(A) In general.--Pursuant to the authority of the Secretary of the Interior to fulfill the trust obligation of the United States to the applicable Indian tribe under Federal law (including regulations), the Secretary of the Interior may, on reasonable notice from the applicable Indian tribe and at the discretion of the Secretary of the Interior, enforce the provisions of, or cancel, any right-of-way granted by the Indian tribe under subsection (a).
``(B) Authority.--The enforcement or cancellation of a right-of-way under subparagraph (A) shall be conducted using regulatory procedures issued under section 6.
``(e) Compliance.-- ``(1) In general.--An interested party, after exhaustion of any applicable Tribal remedies, may submit a petition to the Secretary of the Interior, at such time and in such form as determined by the Secretary of the Interior, to review the compliance of an applicable Indian tribe with a Tribal regulation approved by the Secretary of the Interior under subsection (b).
``(2) Violations.--If the Secretary of the Interior determines that a Tribal regulation was violated after conducting a review under paragraph (1), the Secretary of the Interior may take any action the Secretary of the Interior determines to be necessary to remedy the violation, including rescinding the approval of the Tribal regulation and reassuming responsibility for approving rights-of-way through the trust land of the applicable Indian tribe.
``(3) Documentation.--If the Secretary of the Interior determines that a Tribal regulation was violated after conducting a review under paragraph (1), the Secretary of the Interior shall-- ``(A) provide written documentation, with respect to the Tribal regulation that has been violated, to the appropriate interested party and Indian tribe;
``(B) provide the applicable Indian tribe with a written notice of the alleged violation;
and ``(C) prior to the exercise of any remedy, including rescinding the approval for the applicable Tribal regulation or reassuming responsibility for approving rights-of-way through the trust land of the applicable Indian tribe, provide the applicable Indian tribe with-- ``(i) a hearing that is on the record;
and ``(ii) a reasonable opportunity to cure the alleged violation.
``(f) Savings Clause.--Nothing in this section affects the application of any Tribal regulations issued under Federal environmental law.
``(g) Effect of Tribal Regulations.--An approved Tribal regulation under subsection (b) shall not preclude an Indian tribe from, in the discretion of the Indian tribe, consenting to the grant of a right-of- way by the Secretary of the Interior under section 1.
``(h) Terms of Right-of-way.--The compensation for, and terms of, a right-of-way granted under subsection (a) will be determined by-- ``(1) negotiations by the Indian tribe;
or ``(2) the regulations of the Indian tribe.
``(i) Jurisdiction.--The grant of a right-of-way under subsection (a) does not waive the sovereign immunity of the Indian tribe or diminish the jurisdiction of that Indian tribe over the Tribal land subject to the right-of-way, unless otherwise provided in-- ``(1) the grant of the right-of-way;
or ``(2) the regulations of the Indian tribe.''.
(a) Deadline for Consideration of Applications for Rights-of-Way.-- (1) Completeness of review.-- (A) In general.--Not later than 30 days after the date on which the Secretary of the Interior or the Secretary of Agriculture, as applicable, receives an application for a right-of-way under section 501 of the Federal Land Policy and Management Act of 1976 (43 U.S.C.
(a) Definitions.--In this section:
1761) for an eligible project (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
(1) Eligible project.--The term ``eligible project'' has the meaning given the term in section 3101 of the Energy Act of (43 U.S.C.
3001)), the applicable Secretary shall-- (i) notify the applicant that the application is complete;
3001).
(2) Previously disturbed or developed.--The term ``previously disturbed or developed'' has the meaning given the term in section 1021.410(g)(1) of title 10, Code of Federal Regulations (or successor regulations).
(b) Deadline for Consideration of Applications for Rights-of-way.-- (1) Completeness of review.-- (A) In general.--Not later than 30 days after the date on which the Secretary of the Interior or the Secretary of Agriculture, as applicable, receives an application for a right-of-way under section 501 of the Federal Land Policy and Management Act of 1976 (43 U.S.C.
1761) for an eligible project, the applicable Secretary shall-- (i) notify the applicant that the application is complete;
(B) Environmental impact statement.--For an eligible project (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
(B) Environmental impact statement.--For an eligible project that requires an environmental impact statement for an application submitted under subparagraph (A), the Secretary of the Interior or the Secretary of Agriculture, as applicable, shall issue a notice of intent not later than 90 days after the date on which the applicable Secretary determines that an application is complete under subparagraph (A).
3001)) that requires an environmental impact statement for an application submitted under subparagraph (A), the Secretary of the Interior or the Secretary of Agriculture, as applicable, shall issue a notice of intent not later than 90 days after the date on which the applicable Secretary determines that an application is complete under subparagraph (A).
(b) Low Disturbance Activities for Renewable Energy Projects.-- (1) In general.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting of eligible projects (as defined in section 3101 of the Energy Act of 2020 (43 U.S.C.
(c) Low Disturbance Activities for Renewable Energy Projects.-- (1) In general.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting of eligible projects, the Secretary of the Interior and the Secretary of Agriculture shall each develop or adopt 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of (42 U.S.C.
3001)), the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
(C) Activities on previously disturbed or developed (as defined in section 1021.410(g)(1) of title 10, Code of Federal Regulations (or successor regulations)) land for which an approved land use plan or any environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C.
(C) Activities on previously disturbed or developed land for which an approved land use plan or any environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C.
(D) The installation, modification, operation, or decommissioning of commercially available energy systems located on a building or other structure (such as a rooftop, parking lot, or facility, or mounted to signage, lighting, gates, or fences).
(D) The installation, modification, operation, or removal of commercially available solar photovoltaic systems located on-- (i) a building or other structure (such as a rooftop, parking lot, or facility, or mounted to signage, lighting, gates, or fences);
or (ii) previously disturbed or developed land comprising less than 10 acres.
(G) The installation and removal of temporary meteorological stations.
(G) The construction and removal of meteorological evaluation towers.
(a) Preliminary Geothermal Activities.--Not later than 180 days after the date of enactment of this Act, the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
(a) Preliminary Geothermal Activities.--Not later than 180 days after the date of enactment of this Act, the Secretary of the Interior and the Secretary of Agriculture shall each develop or adopt 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C.
(2) geophysical exploration;
(2) geophysical exploration (including well drilling);
(3) drilling;
(3) production well drilling;
and (4) power plant construction.
and (4) use of geothermal resources (including power plant construction).
(2) Duties.--The Geothermal Ombudsman appointed under paragraph (1) shall-- (A) act as a liaison between the individual field offices of the Bureau of Land Management and the Director of the Bureau of Land Management;
(2) Duties.--The Geothermal Ombudsman appointed under paragraph (1) shall-- (A) act as a liaison between-- (i) the individual field offices of the Bureau of Land Management;
(ii) the Division Chief of the National Renewable Energy Coordination Office of the Bureau of Land Management;
and (iii) the Director of the Bureau of Land Management;
(b) Rulemaking.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting, the Secretary of the Interior and the Secretary of Agriculture shall each promulgate regulations for the use of 1 or more categorical exclusions under the National Environmental Policy Act of 1969 (42 U.S.C.
(b) Rulemaking.--Not later than 180 days after the date of enactment of this Act, to facilitate timely permitting, the Secretary of the Interior and the Secretary of Agriculture shall each develop or adopt 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C.
(2) Any repair, maintenance, replacement, upgrade, modification, optimization, or minor relocation of, or addition to, an existing electric transmission or distribution facility or associated infrastructure within an existing right-of-way or on otherwise previously disturbed or developed land, including reconductoring and installation of grid-enhancing technologies.
(2) Any repair, maintenance, replacement, upgrade, modification, optimization, or minor relocation of, or addition to, an existing electric transmission or distribution facility or associated infrastructure, including electrical substations, within an existing right-of-way or on otherwise previously disturbed or developed land, including reconductoring and installation of grid-enhancing technologies.
42) shall be deposited into the Fund.
42) shall be deposited into the Fund, to remain available until expended.
(3) Use.--The Secretary of the Interior may make expenditures from amounts available in the Fund, without further appropriations, only to carry out section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C.
(3) Use.--The Secretary of the Interior may make expenditures from amounts available in the Fund, without further appropriations or fiscal year limitation, only to carry out section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C.
and (B) may be transferred in accordance with section 40704(e)(2) of that Act (30 U.S.C.
(B) may be transferred in accordance with section 40704(e)(2) of that Act (30 U.S.C.
1245(e)(2)).
1245(e)(2));
and (C) may be used for the administration of the Fund and section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C.
1245) in amounts not to exceed 5 percent of amounts deposited into the Fund.
1337(p)) is amended-- (1) by striking paragraph (10) and inserting the following:
1337(p)) is amended-- (1) in paragraph (4)(I), by striking ``prevention of interference with reasonable uses'' and inserting ``prevention of unreasonable interference with other uses'';
(2) by striking paragraph (10) and inserting the following:
and (2) by adding at the end the following:
and (3) by adding at the end the following:
``(3) Secretary.--The term `Secretary' means the Secretary of Energy.
``(3) Landowner input.--The term `landowner input' means input received-- ``(A) by the Commission;
``(4) Transmission planning region.--The term `transmission planning region' has the meaning given the term in section 225(a).''.
``(B) from affected landowners, such as farmers and ranchers, in the path of the proposed construction or modification of an electric transmission facility;
and ``(C) pursuant to notification provided to, and consultation with, those affected landowners, farmers, and ranchers by the Commission.
``(4) Secretary.--The term `Secretary' means the Secretary of Energy.''.
824p(b)) is amended-- (1) in the matter preceding paragraph (1), by striking ``Except'' and all that follows through ``finds that'' and inserting ``Except as provided in subsections (d)(1) and (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities necessary in the national interest if the Commission finds that'';
824p(b)) is amended-- (1) in the matter preceding paragraph (1), by striking ``Except'' and all that follows through ``finds that'' and inserting ``Except as provided in subsections (d)(1) and (i), the Commission may, after notice and an opportunity for hearing, including a public comment period of at least 60 days, issue one or more permits for the construction or modification of electric transmission facilities necessary in the national interest if the Commission finds that'';
``(2) Consultation.--In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian Tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.''.
``(2) Consultation.--In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian Tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.
(d) Rights-of-Way.--Section 216(e)(3) of the Federal Power Act (16 U.S.C.
``(3) Landowner input.--In authorizing the construction or modification of an electric transmission facility under subsection (b), the Commission shall take into account landowner input.''.
(d) Rights-of-way.--Section 216(e)(3) of the Federal Power Act (16 U.S.C.
``(3) Ratepayer protection.--Customers that receive no benefit, or benefits that are trivial in relation to the costs sought to be allocated, from electric transmission facilities constructed or modified under this section shall not be involuntarily allocated any of the costs of those transmission facilities.''.
``(3) Ratepayer protection.--Customers that receive no benefit, or benefits that are trivial in relation to the costs sought to be allocated, from electric transmission facilities constructed or modified under this section shall not be involuntarily allocated any of the costs of those transmission facilities, provided, however, that nothing in this section shall prevent a transmitting utility from recovering such costs through voluntary agreement with its customers.''.
``(2) Other utilities.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).''.
``(2) Other utilities.-- ``(A) In general.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).
``(B) Clarification.--Being subject to Commission jurisdiction for the purposes of this section shall not make an entity described in section 201(f) a public utility for the purposes of section 201(e).''.
``(d) Alaska.--The Secretary-- ``(1) shall, in consultation with the State of Alaska and affected Indian Tribes, consider any intrastate transmission capacity constraints and congestion within the State of Alaska in the study under subsection (a);
and ``(2) in issuing the report under subsection (b), may, subject to the approval of the Regulatory Commission of Alaska, identify any geographic area in the State of Alaska that-- ``(A) is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers;
or ``(B) is expected to experience such energy transmission capacity constraints or congestion.
``(2) Other utilities.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).
``(2) Other utilities.-- ``(A) In general.--For the purposes of this section, the Commission shall have jurisdiction over all transmitting utilities, including transmitting utilities described in section 201(f), but excluding any ERCOT utility (as defined in section 212(k)(2)(B)).
``(B) Clarification.--Being subject to Commission jurisdiction for the purposes of this section shall not make an entity described in section 201(f) a public utility for the purposes of section 201(e).
``(j) Failure To Submit Plan.--In the event that neighboring transmission planning regions fail to submit to the Commission a joint interregional transmission plan under this section, the Commission shall, as the Commission determines to be appropriate-- ``(1) grant a request to extend the time for submission of the joint interregional transmission plan;
``(j) Failure to Submit Plan.--In the event that neighboring transmission planning regions fail to submit to the Commission a joint interregional transmission plan under this section, the Commission shall, as the Commission determines to be appropriate-- ``(1) grant a request to extend the time for submission of the joint interregional transmission plan;
``(g) Deadline To Act on Certain Export Applications.-- ``(1) In general.--The Commission shall grant or deny an application under subsection (a) to export to a foreign country any natural gas from the United States not later than 90 days after the later of-- ``(A) the date on which the notice of availability for each final review required under the National Environmental Policy Act of 1969 (42 U.S.C.
``(g) Deadline to Act on Certain Export Applications.-- ``(1) In general.--The Commission shall grant or deny an application under subsection (a) to export to a foreign country any natural gas from the United States not later than 90 days after the later of-- ``(A) the date on which the notice of availability for each final review required under the National Environmental Policy Act of 1969 (42 U.S.C.
806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act-- (1) the Commission may reinstate the license for the applicable project effective as of the date of expiration of the license;
806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act-- (1) the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license;
<all>
SEC.
702.
IDENTIFYING AND REMOVING MARKET BARRIERS TO HYDROPOWER.
(a) Definitions.--In this section:
(1) Commission.--The term ``Commission'' means the Federal Energy Regulatory Commission.
(2) Water power technologies.--The term ``water power technologies'' means hydropower in all its forms and modes of operation, including-- (A) conventional water power projects that use dams, conduits, or similar infrastructure to store, divert, or impound water to generate electricity;
and (B) marine and hydrokinetic technologies that use-- (i) waves, tides, and currents;
or (ii) temperature differentials in oceans, estuaries, tidal areas, rivers, lakes, streams, or manmade channels.
(b) Report on Hydropower Market Barriers.-- (1) In general.--Not later than 270 days after the date of enactment of this Act, the Commission, in consultation with the Secretary of Energy, shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Energy and Commerce of the House of Representatives a report-- (A) describing any market barriers to the development and proper compensation of conventional, storage, conduit, and emerging hydropower technologies related to-- (i) rules of Transmission Organizations (as defined in section 3 of the Federal Power Act (16 U.S.C.
796));
(ii) regulations or policies-- (I) of the Commission;
or (II) under the Federal Power Act (16 U.S.C.
791a et seq.);
or (iii) other Federal and State laws and policies unique to hydropower development, operation, and regulation, as compared to other sources of electricity;
(B) containing recommendations of the Commission for reducing market barriers described in subparagraph (A);
(C) identifying and determining any regulatory, market, procurement, or cost recovery mechanisms that would-- (i) encourage development of conventional, storage, conduit, and emerging hydropower technologies;
and (ii) properly compensate conventional, storage, conduit, and emerging hydropower technologies for the full range of services provided to the electric grid, including-- (I) balancing electricity supply and demand;
(II) ensuring grid reliability;
(III) providing ancillary services;
(IV) contributing to the decarbonization of the electric grid;
View plain text versions (2)

What Congress says this changes

S. Rept. 118-336

Published by the reporting committee Not generated — this is the committee's own “Changes in Existing Law Made by the Bill, as Reported”.

Text to be removed appears in [brackets]. Newly inserted text is italicised in the official report and cannot be marked in this plain-text rendition — read the official PDF ↗ for the authoritative formatting.

changes in existing law made by 
the bill S. 3044, as ordered reported, are shown as follows 
(existing law proposed to be omitted is enclosed in black 
brackets, new matter is printed in italic, existing law in 
which no change is proposed is shown in roman):

 TABLE OF EXISTING LAWS PROPOSED TO BE CHANGED

1. Mining Law of 1872
2. Mineral Leasing Act
3. Federal Power Act
4. Bonneville Project Act of 1937
5. Natural Gas Act
6. Indian Right of Way Act
7. Outer Continental Shelf Lands Act
8. Geothermal Steam Act of 1970
9. Department of Energy Organization Act
10. Pacific Northwest Electric Power Planning and Conservation Act
11. Omnibus Budget Reconciliation Act of 1993
12. Energy Policy Act of 2005
13. Energy Act of 2020
14. Infrastructure Investment and Jobs Act
15. Inflation Reduction Act

 MINING LAW OF 1872

 Revised Statutes, Sec. 2337

 Sec. 2337. (a) Where non-mineral land not contiguous to the 
vein or lode is used or occupied by the proprietor of such vein 
or lode for mining or milling purposes, such non-adjacent 
surface-ground may be embraced and included in an application 
for a patent for such vein or lode, and the same may be 
patented therewith, subject to the same preliminary 
requirements as to survey and notice as are applicable to veins 
or lodes; but no location hereafter made of such non-adjacent 
land shall exceed five acres, and payment for the same must be 
made at the same rate as fixed by this chapter for the 
superficies of the lode. The owner of a quartz-mill or 
reduction-works, not owning a mine in connection therewith, may 
also receive a patent for his mill-site, as provided in this 
section.
 (b) Where nonmineral land is needed by the proprietor of a 
placer claim for mining, milling, processing, beneficiation, or 
other operations in connection with such claim, and is used or 
occupied by the proprietor for such purposes, such land may be 
included in an application for a patent for such claim, and may 
be patented therewith subject to the same requirements as to 
survey and notice as are applicable to placers. No location 
made of such nonmineral land shall exceed five acres and 
payment for the same shall be made at the rate applicable to 
placer claims which do not include a vein or lode.
 (c) Additional Mill Sites.--
 (1) Definitions.--In this subsection:
 (A) Mill site.--The term, ``mill site'' means 
 a location of public land that is reasonably 
 necessary for waste rock or tailings disposal 
 or other operations reasonably incident to 
 mineral development on, or production from land 
 included in a plan of operations.
 (B) Operations; operator.--The terms 
 ``operations'' and ``operator'' have the 
 meanings given those terms in section 3809.5 of 
 title 43, Code of Federal Regulations (as in 
 effect on the date of enactment of this 
 subsection).
 (C) Plan of operations.--The term ``plan of 
 operations'' means a plan of operations that an 
 operator must submit and the Secretary of the 
 Interior or the Secretary of Agriculture, as 
 applicable, must approve before an operator may 
 begin operations, in accordance with, as 
 applicable--
 (i) subpart 3809 of title 43, Code of 
 Federal Regulations (or successor 
 regulations establishing application 
 and approval requirements); and
 (ii) part 228 of title 36, Code of 
 Federal Regulations (or successor 
 regulations establishing application 
 and approval requirements).
 (D) Public land.--The term ``public land'' 
 means land owned by the United States that is 
 open to location under sections 2319 through 
 2344 of the Revised Statutes (30 U.S.C. 22 et 
 seq.), including--
 (i) land that is mineral-in-character 
 (as defined in section 3830.5 of title 
 43, Code of Federal Regulations (as in 
 effect on the date of enactment of this 
 subsection));
 (ii) nonmineral land (as defined in 
 section 3830.5 of title 43, Code of 
 Federal Regulations (as in effect on 
 the date of enactment of this 
 subsection)); and
 (iii) land where the mineral 
 character has not been determined.
 (2) In general.--Notwithstanding subsections (a) and 
 (b), where public land is needed by the proprietor of a 
 lode or placer claim for operations in connection with 
 any lode or placer claim within the proposed plan of 
 operations, the proprietor may--
 (A) locate and include within the plan of 
 operations as many mill site claims under this 
 subsection as are reasonably necessary for its 
 operations; and
 (B) use or occupy public land in accordance 
 with an approved plan of operations.
 (3) Mill sites convey no mineral rights.--A mill site 
 under this subsection does not convey mineral rights to 
 the locator.
 (4) Size of mill sites.--A location of a single mill 
 site under this subsection shall not exceed 5 acres.
 (5) Mill site and lode or placer claims on same 
 tracts of public land.--A mill site may be located 
 under this subsection on a tract of public land on 
 which the claimant or operator maintains a previously 
 located lode or placer claim.
 (6) Effect on mining claims.--The location of a mill 
 site under this subsection shall not affect the 
 validity of any lode or placer claim, or any rights 
 associated with such a claim.
 (7) Patenting.--A mill site under this section shall 
 not be eligible for patenting.
 (8) Savings provisions.--Nothing in this subsection--
 (A) diminishes any right (including a right 
 of entry, use, or occupancy) of a claimant;
 (B) creates or increases any right (including 
 a right of exploration, entry, use, or 
 occupancy) of a claimant on land that is not 
 open to location under the general mining laws;
 (C) modifies any provision of law or any 
 prior administrative action withdrawing land 
 from location or entry;
 (D) limits the right of the Federal 
 Government to regulate mining and mining-
 related activities (including requiring claim 
 validity examinations to establish the 
 discovery of a valuable mineral deposit) in 
 areas withdrawn from mining, including under--
 (i) the general mining laws;
 (ii) the Federal Land Policy and 
 Management Act of 1976 (43 U.S.C. 1701 
 et seq.);
 (iii) the Wilderness Act (16 U.S.C. 
 1131 et seq.);
 (iv) sections 100731 through 100737 
 of title 54, United States Code;
 (v) the Endangered Species Act of 
 1973 (16 U.S.C. 1531 et seq.);
 (vi) division A of subtitle III of 
 title 54, United States Code (commonly 
 referred to as the ``National Historic 
 Preservation Act''); or
 (vii) section 4 of the Act of July 
 23, 1955 (commonly known as the 
 ``Surface Resources Act of 1955'') (69 
 Stat. 368, chapter 375; 30 U.S.C. 612);
 (E) restores any right (including a right of 
 entry, use, or occupancy, or right to conduct 
 operations) of a claimant that--
 (i) existed prior to the date on 
 which the land was closed to, or 
 withdrawn from, location under the 
 general mining laws; and
 (ii) that has been extinguished by 
 such closure or withdrawal; or
 (F) modifies section 404 of division E of the 
 Consolidated Appropriations Act, 2024 (Public 
 Law 118-42).

 MINERAL LEASING ACT

 Act of February 25, 1920, Chapter 85, as Amended

 AN ACT To promote the mining of coal, phosphate, oil, oil shale, gas, 
and sodium on the public domain.

 * * * * * * *

 COAL

 Sec. 2. (a)(1) The Secretary of the Interior is authorized 
to divide any lands subject to this Act which have been 
classified for coal leasing into leasing tracts of such size as 
[he finds appropriate] the Secretary of the Interior finds 
appropriate and in the public interest and which will permit 
the mining of all coal which can be economically extracted in 
such tract and thereafter [he shall, in his discretion, upon 
the request of any qualified applicant or on his own motion 
from time to time] the Secretary shall, at the discretion of 
the Secretary but subject to paragraph (6), on the request of 
any qualified applicant or on a motion by the Secretary, offer 
such lands for leasing and shall award leases thereon by 
competitive bidding: Provided, That notwithstanding the 
competitive bidding requirement of this section, the Secretary 
may, subject to such conditions which [he deems appropriate] 
the Secretary of the Interior determines to be appropriate, 
negotiate the sale at fair market value of coal the removal of 
which is necessary and incidental to the exercise of a right-
of-way permit issued pursuant to title V of the Federal Land 
Policy and Management Act of 1976. No less than 50 per centum 
of the total acreage offered for lease by the Secretary in any 
one year shall be leased under a system of deferred bonus 
payment. Upon default or cancellation of any coal lease for 
which bonus payments are due, any unpaid remainder of the bid 
shall be immediately payable to the United States. A reasonable 
number of leasing tracts shall be reserved and offered for 
lease in accordance with this section to public bodies, 
including Federal agencies, rural electric cooperatives, or 
nonprofit corporations controlled by any of such entities: 
Provided, That the coal so offered for lease shall be for use 
by such entity or entities in implementing a definite plan to 
produce energy for their own use or for sale to their members 
or customers (except for short-term sales to others). No bid 
shall be accepted which is less than the fair market value, as 
determined by the Secretary, of the coal subject to the lease. 
[Prior to his determination] Prior to a determination by the 
Secretary of the Interior of the fair market value of the coal 
subject to the lease, the Secretary shall give opportunity for 
and consideration to public comments on the fair market value. 
Nothing in this section shall be construed to require the 
Secretary [to make public his judgment] to make public the 
judgment of the Secretary of the Interior as to the fair market 
value of the coal to be leased, or the [comments he receives] 
comments received by the Secretary of the Interior thereon 
prior to the issuance of the lease. [He is hereby authorized] 
The Secretary of the Interior is authorized, in awarding leases 
for coal lands improved and occupied or claimed in good faith, 
prior to February 25, 1920, to consider and recognize equitable 
rights of such occupants or claimants.

 * * * * * * *

 (5) Notwithstanding any other provision of law, if the 
lessee under a coal lease fails to pay any installment of a 
deferred cash bonus bid within 10 days after the Secretary 
provides written notice that payment of the installment is past 
due--
 (A) the lease shall automatically terminate; and
 (B) any bonus payments already made to the United 
 States with respect to the lease shall not be returned 
 to the lessee or credited in any future lease sale.
 (6) Deadlines.--
 (A) Applicant motion.--Not later than 90 days after 
 the date on which a request of a qualified applicant is 
 received for a lease sale under paragraph (1), or for a 
 lease modification under section 3, the Secretary of 
 the Interior shall commence all necessary consultations 
 and reviews required under Federal law in accordance 
 with that paragraph or section, as applicable.
 (B) Decision.--Not later than 90 days after the 
 completion of an environmental impact statement or 
 environmental assessment consistent with the 
 requirements of the National Environmental Policy Act 
 of 1969 (42 U.S.C. 4321 et seq.) for a lease sale under 
 paragraph (1), or for a lease modification under 
 section 3, the Secretary of the Interior shall issue a 
 record of decision or a finding of no significant 
 impact for the lease sale or lease modification.
 (C) Fair market value.--Not later than 30 days after 
 the date on which the Secretary of the Interior issues 
 a record of decision or a finding of no significant 
 impact under subparagraph (B) for a lease sale under 
 paragraph (1), or for a lease modification under 
 section 3, the Secretary shall determine the fair 
 market value of the coal subject to the lease.
 (b) The Secretary may, under such regulations as he may 
prescribe, issue to any person an exploration license.

 * * * * * * *

 (3) The licensee shall furnish to the Secretary 
 copies of all data (including, but not limited to, 
 geological, [geophysical] geophysical, and core 
 drilling analyses) obtained during such exploration. 
 The Secretary shall maintain the confidentiality of all 
 data so obtained until after the areas involved have 
 been leased or until such time as he determines that 
 making the data available to the public would not 
 damage the competitive position of the licensee, 
 whichever comes first.

 * * * * * * *

 Sec. 3. (a)(1) Except as provided in paragraph (3), on a 
finding by the Secretary under paragraph (2), any person, 
association, or corporation holding a lease of coal lands or 
coal deposits under the provisions of this Act may with the 
approval of the Secretary of the Interior, secure modifications 
of the original coal lease by including additional coal lands 
or coal deposits contiguous or cornering to those embraced in 
the lease.

 * * * * * * *

 (b) [The Secretary shall prescribe] Subject to section 
2(a)(6), the Secretary shall prescribe terms and conditions 
which shall be consistent with this Act and applicable to all 
of the acreage in such modified lease except that nothing in 
this section shall require the Secretary to apply the 
production or mining plan requirements of section 2(d)(2) and 
7(c) of this Act (30 U.S.C. 201(d)(2) and 207(c)).

 * * * * * * *

 Sec. 17. (a) All lands subject to disposition under this 
Act which are known or believed to contain oil or gas deposits 
may be leased by the Secretary.
 (b)(1)(A) All lands to be leased which are not subject to 
leasing under paragraphs (2) and (3) of this subsection shall 
be leased as provided in this paragraph to the highest 
responsible qualified bidder by competitive bidding under 
general regulations in units of not more than 2,560 acres, 
except in Alaska, where units shall be not more than 5,760 
acres. Such units shall be as nearly compact as possible. Lease 
sales shall be conducted by oral bidding, except as provided in 
subparagraph (C). Lease sales shall be held for each State 
where eligible lands are available at least quarterly and more 
frequently if the Secretary of the Interior determines such 
sales are necessary. A lease shall be conditioned upon the 
payment of a royalty at a rate of not less than 12.5 percent in 
amount or value of the production removed or sold from the 
lease. The Secretary shall accept the highest bid from a 
responsible qualified bidder which is equal to or greater than 
the national minimum acceptable bid, without evaluation of the 
value of the lands proposed for lease. Leases shall be issued 
within 60 days following payment by the successful bidder of 
the remainder of the bonus bid, if any, and the annual rental 
for the first lease year. All bids for less than the national 
minimum acceptable bid shall be rejected. Lands for which no 
bids are received or for which the highest bid is less than the 
national minimum acceptable bid shall be offered promptly 
within 30 days for leasing under subsection (c) of this section 
and shall remain available for leasing for a period of 2 years 
after the competitive lease sale.

 * * * * * * *

 (3) Subdivision.--
 (A) In general.--A parcel of land included in 
 an expression of interest that the Secretary of 
 the Interior offers for lease shall be leased 
 as nominated and not subdivided into multiple 
 parcels unless the Secretary of the Interior 
 determines that a subpart of the submitted 
 parcel is not open to oil or gas leasing under 
 the approved resource management plan.
 (B) Required reviews.--Nothing in this 
 paragraph affects the obligations of the 
 Secretary of the Interior to complete 
 requirements and reviews established by other 
 provisions of law before leasing a parcel of 
 land.
 (4) Resource management plans.--
 (A) Lease terms and conditions.--A lease 
 issued under this section shall be subject to 
 the terms and conditions of the approved 
 resource management plan.
 (B) Effect of leasing decision.--
 Notwithstanding section 1506.1 of title 40, 
 Code of Federal Regulations (as in effect on 
 the date of enactment of this paragraph), the 
 Secretary may conduct a lease sale under an 
 approved resource management plan while 
 amendments to the approved plan are under 
 consideration.

 * * * * * * *

 [(g) The Secretary of the Interior, or] (g)(1) The 
Secretary of the Interior, or for National Forest lands, the 
Secretary of Agriculture, shall regulate all surface-disturbing 
activities conducted pursuant to any lease issued under this 
Act, and shall determine reclamation and other actions as 
required in the interest of conservation of surface resources. 
No permit to drill on an oil and gas lease issued under this 
Act may be granted without the analysis and approval by the 
Secretary concerned of a plan of operations covering proposed 
surface-disturbing activities within the lease area. The 
Secretary concerned shall, by rule or regulation, establish 
such standards as may be necessary to ensure that an adequate 
bond, surety, or other financial arrangement will be 
established prior to the commencement of surface-disturbing 
activities on any lease, to ensure the complete and timely 
reclamation of the lease tract, and the restoration of any 
lands or surface waters adversely affected by lease operations 
after the abandonment or cessation of oil and gas operations on 
the lease. The Secretary shall not issue a lease or leases or 
approve the assignment of any lease or leases under the terms 
of this section to any person, association, corporation, or any 
subsidiary, affiliate, or person controlled by or under common 
control with such person, association, or corporation, during 
any period in which, as determined by the Secretary of the 
Interior or Secretary of Agriculture, such entity has failed or 
refused to comply in any material respect with the reclamation 
requirements and other standards established under this section 
for any prior lease to which such requirements and standards 
applied. Prior to making such determination with respect to any 
such entity the concerned Secretary shall provide such entity 
with adequate notification and an opportunity to comply with 
such reclamation requirements and other standards and shall 
consider whether any administrative or judicial appeal is 
pending. Once the entity has complied with the reclamation 
requirement or other standard concerned an oil or gas lease may 
be issued to such entity under this Act.
 (2)(A) In the case of an oil and gas lease under this Act 
on land described in subparagraph (B) located within an oil and 
gas drilling or spacing unit, nothing in this Act authorizes 
the Secretary of the Interior--
 (i) to require a bond to protect non-Federal land;
 (ii) to enter non-Federal land without the consent of 
 the applicable landowner;
 (iii) to impose mitigation requirements; or (iv) to 
 require approval for surface reclamation.
 (B) Land referred to in subparagraph (A) is land where--
 (i) the Federal Government--
 (I) owns less than 50 percent of the minerals 
 within the oil and gas drilling or spacing 
 unit; and
 (II) does not own or lease the surface estate 
 within the area directly impacted by the 
 action;
 (ii) the well is located on non-Federal land 
 overlying a non-Federal mineral estate, but some 
 portion of the wellbore enters and produces from the 
 Federal mineral estate subject to the lease; or
 (iii) the well is located on non-Federal land 
 overlying a non-Federal mineral estate, but some 
 portion of the wellbore traverses but does not produce 
 from the Federal mineral estate subject to the lease.

 * * * * * * *

 (p) Deadlines for Consideration of Applications for 
Permits.--
 (1) In general.--Not later than 10 days after the 
 date on which the Secretary receives an application for 
 any permit to drill, the Secretary shall--
 (A) notify the applicant that the application 
 is complete; or
 (B) notify the applicant that information is 
 missing and specify any information that is 
 required to be submitted for the application to 
 be complete.
 (2) Issuance or deferral.--Not later than 30 days 
 after the applicant for a permit has submitted a 
 complete application, the Secretary shall--
 (A) issue the permit, if the requirements 
 under the National Environmental Policy Act of 
 1969 and other applicable law have been 
 completed within such timeframe; or
 (B) defer the decision on the permit and 
 provide to the applicant a notice--
 (i) that specifies any steps that the 
 applicant could take for the permit to 
 be issued; and
 (ii) a list of actions that need to 
 be taken by the agency to complete 
 compliance with applicable law together 
 with timelines and deadlines for 
 completing such actions.
 (3) Requirements for deferred applications.--
 (A) In general.--If the Secretary provides 
 notice under paragraph (2)(B), the applicant 
 shall have a period of 2 years from the date of 
 receipt of the notice in which to complete all 
 requirements specified by the Secretary, 
 including providing information needed for 
 compliance with the National Environmental 
 Policy Act of 1969.
 (B) Issuance of decision on permit.--If the 
 applicant completes the requirements within the 
 period specified in subparagraph (A), the 
 Secretary shall issue a decision on the permit 
 not later than 10 days after the date of 
 completion of the requirements described in 
 subparagraph (A), unless compliance with the 
 National Environmental Policy Act of 1969 and 
 other applicable law has not been completed 
 within such timeframe.
 (C) Denial of permit.--If the applicant does 
 not complete the requirements within the period 
 specified in subparagraph (A) or if the 
 applicant does not comply with applicable law, 
 the Secretary shall deny the permit.
 (4) Term.--
 (A) In general.--A permit to drill approved 
 under this subsection shall be valid for a 
 single non-renewable 4-year period beginning on 
 the date of the approval.
 (B) Retroactivity.--In addition to all 
 approved applications for permits to drill 
 submitted on or after the date of enactment of 
 this paragraph, subparagraph (A) shall apply 
 to--
 (i) all permits approved during the 
 2-year period preceding the date of 
 enactment of this paragraph; and
 (ii) all pending applications for 
 permit to drill submitted prior to the 
 date of enactment of this paragraph.
 (q) Fee for Expression of Interest.--
 (1) In general.--The [Secretary] Secretary of the 
 Interior shall assess a [nonrefundable] fee against any 
 person that, in accordance with procedures established 
 by the [Secretary] Secretary of the Interior to carry 
 out this subsection, submits an expression of interest 
 in leasing land available for disposition under this 
 section for exploration for, and development of, oil or 
 gas.
 (2) Amount of fee.--
 (A) In general.--Subject to subparagraph (B), 
 the fee assessed under paragraph (1) shall be 
 $5 per acre of the area covered by the 
 applicable expression of interest.
 (B) Adjustment of fee.--The [Secretary] 
 Secretary of the Interior shall, by regulation, 
 not less frequently than every 4 years, adjust 
 the amount of the fee under subparagraph (A) to 
 reflect the change in inflation.
 (3) Refund for nonwinning bid.--If a person other 
 than the person who submitted the expression of 
 interest is the highest responsible qualified bidder 
 for a parcel of land covered by the applicable 
 expression of interest in a lease sale conducted under 
 this section--
 (A) as a condition of the issuance of the 
 lease, the person who is the highest 
 responsible qualified bidder shall pay to the 
 Secretary of the Interior an amount equal to 
 the applicable fee paid by the person who 
 submitted the expression of interest; and
 (B) not later than 60 days after the date of 
 the lease sale, the Secretary of the Interior 
 shall refund to the person who submitted the 
 expression of interest an amount equal to the 
 amount of the initial fee paid.
 (4) Refundability.--Except as provided in paragraph 
 (3)(B), the fee assessed under paragraph (1) shall be 
 nonrefundable.

 * * * * * * *

 FEDERAL POWER ACT

Act of June 10, 1920, Chapter 285, as Amended

 * * * * * * *

PART II--REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE 
 COMMERCE

 DECLARATION OF POLICY; APPLICATION OF PART; DEFINITIONS

 Section. 201. (a) It is hereby declared that the business 
of transmitting and selling electric energy for ultimate 
distribution to the public is affected with a public interest, 
and that Federal regulation of matters relating to generation 
to the extent provided in this Part and the Part next following 
and of that part of such business which consists of the 
transmission of electric energy in interstate commerce and the 
sale of such energy at wholesale in interstate commerce is 
necessary in the public interest, such Federal regulation, 
however, to extend only to those matters which are not subject 
to regulation by the States.
 (b)(1) The provisions of this Part shall apply to the 
transmission of electric energy in interstate commerce and to 
the sale of electric energy at wholesale in interstate 
commerce, but except as provided in paragraph (2) shall not 
apply to any other sale of electric energy or deprive a State 
or State commission of its lawful authority now exercised over 
the exportation of hydroelectric energy which is transmitted 
across a State line. The Commission shall have jurisdiction 
over all facilities for such transmission or sale of electric 
energy, but shall not have jurisdiction, except as specifically 
provided in this Part and the Part next following, over 
facilities used for the generation of electric energy or over 
facilities used in local distribution or only for the 
transmission of electric energy in intrastate commerce, or over 
facilities for the transmission of electric energy consumed 
wholly by the transmitter.
 (2) Notwithstanding section 201(f), the provisions of 
sections 203(a)(2), 206(e), 210, 211, 211A, 212, 215, 215A, 
216, 217, 218, 219, 220, 221, [and 222] 222, and 225 shall 
apply to the entities described in such provisions, and such 
entities shall be subject to the jurisdiction of the Commission 
for purposes of carrying out such provisions and for purposes 
of applying the enforcement authorities of this Act with 
respect to such provisions. Compliance with any order of the 
Commission under the provisions of section 203(a)(2), 206(e), 
210, 211, 211A, 212, 215, 215A, 216, 217, 218, 219, 220, 221, 
[or 222] 222, or 225, shall not make an electric utility or 
other entity subject to the jurisdiction of the Commission for 
any purposes other than the purposes specified in the preceding 
sentence.

 * * * * * * *

 (e) The term ``public utility'' when used in this Part or 
in the Part next following means any person who owns or 
operates facilities subject to the jurisdiction of the 
Commission under this Part (other than facilities subject to 
such jurisdiction solely by reason of section 206(e), [206(f),] 
210, 211, 211A, 212, 215, 215A, 216, 217, 218, 219, 220, 221, 
[or 222] 222, or 225).

 * * * * * * *

SEC. 215. ELECTRIC RELIABILITY.

 (a) Definitions.--For purposes of this section:
 (1) The term ``bulk-power system'' means--
 (A) facilities and control systems necessary 
 for operating an interconnected electric energy 
 transmission network (or any portion thereof); 
 and
 (B) electric energy from generation 
 facilities needed to maintain transmission 
 system reliability.
 The term does not include facilities used in the local 
distribution of electric energy.
 (2) The terms ``Electric Reliability Organization'' 
 and ``ERO'' mean the organization certified by the 
 Commission under subsection (c) the purpose of which is 
 to establish and enforce reliability standards for the 
 bulk-power system, subject to Commission review.
 (3) The term ``reliability standard'' means a 
 requirement, approved by the Commission under this 
 section, to provide for reliable operation of the bulk-
 power system. The term includes requirements for the 
 operation of existing bulk-power system facilities, 
 including cybersecurity protection, and the design of 
 planned additions or modifications to such facilities 
 to the extent necessary to provide for reliable 
 operation of the bulk-power system, but the term does 
 not include any requirement to enlarge such facilities 
 or to construct new transmission capacity or generation 
 capacity.
 (4) The term ``reliable operation'' means operating 
 the elements of the bulk-power system within equipment 
 and electric system thermal, voltage, and stability 
 limits so that instability, uncontrolled separation, or 
 cascading failures of such system will not occur as a 
 result of a sudden disturbance, including a 
 cybersecurity incident, or unanticipated failure of 
 system elements.
 (5) The term ``Interconnection'' means a geographic 
 area in which the operation of bulk-power system 
 components is synchronized such that the failure of one 
 or more of such components may adversely affect the 
 ability of the operators of other components within the 
 system to maintain reliable operation of the facilities 
 within their control.
 (6) The term ``transmission organization'' means a 
 Regional Transmission Organization, Independent System 
 Operator, independent transmission provider, or other 
 transmission organization finally approved by the 
 Commission for the operation of transmission 
 facilities.
 (7) The term ``regional entity'' means an entity 
 having enforcement authority pursuant to subsection 
 (e)(4).
 (8) The term ``cybersecurity incident'' means a 
 malicious act or suspicious event that disrupts, or was 
 an attempt to disrupt, the operation of those 
 programmable electronic devices and communication 
 networks including hardware, software and data that are 
 essential to the reliable operation of the bulk power 
 system.

 * * * * * * *

 [(g) Reliability Reports.--The ERO shall conduct periodic 
assessments of the reliability and adequacy of the bulk-power 
system in North America.]
 (g) Reliability Reports.--
 (1) Periodic assessments.--The ERO shall conduct 
 periodic assessments of the reliability and adequacy of 
 the bulk-power system in North America.
 (2) Reliability assessments for regulations.--(A) 
 Whenever the Commission determines, on its own motion 
 or on request from another Federal agency, an affected 
 transmission organization, or any State commission, 
 that a rule, regulation, or standard proposed by a 
 Federal agency other than the Commission is likely to 
 result in a violation of a tariff requirement or 
 process for resource adequacy on file with the 
 Commission or a mandatory standard for reliability 
 approved by the Commission, the Commission shall 
 require, by order, the ERO to assess and report on the 
 effects of the proposed rule, regulation, or standard 
 on the reliable operation of the bulk-power system.
 (B) An ERO reliability assessment ordered under 
 subparagraph (A) shall--
 (i) identify any reasonably foreseeable 
 significant adverse effects on the reliable 
 operation of the bulk-power system that the ERO 
 anticipates will result from the proposed rule, 
 regulation, or standard;
 (ii) account for mitigations that will be 
 available under existing rules, regulations, or 
 tariffs governing facilities of the bulk-power 
 system under this Act that will reduce or 
 prevent significant adverse effects on the 
 reliable operation of the bulk-power system 
 from the proposed rule, regulation, or 
 standard; and
 (iii) take into account the technical views 
 of affected transmission organizations 
 regarding effects on the reliable operation of 
 the bulk-power system from the proposed rule, 
 regulation, or standard.
 (C) The ERO shall--
 (i) submit the report required under 
 subparagraph (A) to the public docket of the 
 Federal agency proposing the rule, regulation, 
 or standard, and, if practicable, make such 
 submission within the time period established 
 by such Federal agency for submission of public 
 comments on the proposed rule, regulation, or 
 standard;
 (ii) submit such report to the Commission; 
 and
 (iii) publish such report in a publicly 
 available format.
 (D) This paragraph shall apply to proposed rules, 
 regulations, or standards pending on, or proposed on or 
 after, the date of enactment of this paragraph.

 * * * * * * *

SEC. 216. SITING OF INTERSTATE ELECTRIC TRANSMISSION FACILITIES.

 [(a) Designation of National Interest Electric Transmission 
Corridors.--(1) Not later than 1 year after the date of 
enactment of this section and every 3 years thereafter, the 
Secretary of Energy (referred to in this section as the 
``Secretary''), in consultation with affected States and Indian 
Tribes, shall conduct a study of electric transmission capacity 
constraints and congestion.
 [(2) Not less frequently than once every 3 years, the 
Secretary, after considering alternatives and recommendations 
from interested parties (including an opportunity for comment 
from affected States and Indian Tribes), shall issue a report, 
based on the study under paragraph (1) or other information 
relating to electric transmission capacity constraints and 
congestion, which may designate as a national interest electric 
transmission corridor any geographic area that--
 [(i) is experiencing electric energy transmission 
 capacity constraints or congestion that adversely 
 affects consumers; or
 [(ii) is expected to experience such energy 
 transmission capacity constraints or congestion.
 [(3) Not less frequently than once every 3 years, the 
Secretary, in conducting the study under paragraph (1) and 
issuing the report under paragraph (2), shall consult with any 
appropriate regional entity referred to in section 215.
 [(4) In determining whether to designate a national 
interest electric transmission corridor under paragraph (2), 
the Secretary may consider whether--
 [(A) the economic vitality and development of the 
 corridor, or the end markets served by the corridor, 
 may be constrained by lack of adequate or reasonably 
 priced electricity;
 [(B)(i) economic growth in the corridor, or the end 
 markets served by the corridor, may be jeopardized by 
 reliance on limited sources of energy; and
 [(ii) a diversification of supply is warranted;
 [(C) the energy independence or energy security of 
 the United States would be served by the designation;
 [(D) the designation would be in the interest of 
 national energy policy;
 [(E) the designation would enhance national defense 
 and homeland security;
 [(F) the designation would enhance the ability of 
 facilities that generate or transmit firm or 
 intermittent energy to connect to the electric grid;
 [(G) the designation--
 [(i) maximizes existing rights-of-way; and
 [(ii) avoids and minimizes, to the maximum 
 extent practicable, and offsets to the extent 
 appropriate and practicable, sensitive 
 environmental areas and cultural heritage 
 sites; and
 [(H) the designation would result in a reduction in 
 the cost to purchase electric energy for consumers.]
 (a) Definitions.--In this section:
 (1) Commission.--The term ``Commission'' means the 
 Federal Energy Regulatory Commission.
 (2) Improved reliability.--The term ``improved 
 reliability'' has the meaning given the term in section 
 225(a).
 (3) Landowner input.--The term ``landowner input: 
 means input received--
 (A) by the Commission;
 (B) from affected landowners, such as farmers 
 and ranchers, in the path of the proposed 
 construction or modification of an electric 
 transmission facility; and
 (C) pursuant to notification provided to, and 
 consultation with, those affected landowners, 
 farmers, and ranchers by the Commission.
 (4) Secretary.--The term ``Secretary'' means the 
 Secretary of Energy.
 (b) Construction Permit.--[Except as provided in subsection 
(i), the Commission may, after notice and an opportunity for 
hearing, issue one or more permits for the construction or 
modification of electric transmission facilities in a national 
interest electric transmission corridor designated by the 
Secretary under subsection (a) if the Commission finds that] 
Except as provided in subsections (d)(1) and (i), the 
Commission may, after notice and an opportunity for hearing, 
including a public comment period of at least 60 days, issue 
one or more permits for the construction or modification of 
electric transmission facilities necessary in the national 
interest if the Commission finds that--
 (1)(A) a State in which the transmission facilities 
 are to be constructed or modified does not have 
 authority to--
 (i) approve the siting or modification of the 
 facilities; or
 (ii) consider the interstate benefits or 
 interregional benefits expected to be achieved 
 by the proposed construction or modification of 
 transmission facilities in the State;
 (B) the applicant for a permit is a transmitting 
 utility under this Act but does not qualify to apply 
 for a permit or siting approval for the proposed 
 project in a State because the applicant does not serve 
 end-use customers in the State; or
 (C) a State commission or other entity that has 
 authority to approve the siting or modification of the 
 facilities--
 (i) has not made a determination on an 
 application seeking approval pursuant to 
 applicable law by the date that is 1 year after 
 the date on which the application was filed 
 with the State commission or other entity; [the 
 later of--
 [(I) the date on which the 
 application was filed; and
 [(II) the date on which the relevant 
 national interest electric transmission 
 corridor was designated by the 
 Secretary under subsection (a);]
 (ii) has conditioned its approval in such a 
 manner that the proposed construction or 
 modification will not significantly reduce 
 transmission capacity constraints or congestion 
 in interstate commerce or is not economically 
 feasible; or
 (iii) has denied an application seeking 
 approval pursuant to applicable law;
 [(2) the facilities to be authorized by the permit 
 will be used for the transmission of electric energy in 
 interstate commerce;
 [(3) the proposed construction or modification is 
 consistent with the public interest;
 [(4) the proposed construction or modification will 
 significantly reduce transmission congestion in 
 interstate commerce and protects or benefits consumers;
 [(5) the proposed construction or modification is 
 consistent with sound national energy policy and will 
 enhance energy independence; and
 [(6) the proposed modification will maximize, to the 
 extent reasonable and economical, the transmission 
 capabilities of existing towers or structures.]
 (2) the proposed facilities will be used for the 
 transmission of electric energy in interstate 
 (including transmission from the outer Continental 
 Shelf to a State) or foreign commerce;
 (3) the proposed construction or modification is 
 consistent with the public interest;
 (4) the proposed construction or modification will 
 significantly reduce transmission congestion in 
 interstate commerce, protect or benefit consumers, and 
 provide improved reliability;
 (5) the proposed construction or modification is 
 consistent with sound national energy policy and will 
 enhance energy independence;
 (6) the electric transmission facilities are capable 
 of transmitting electric energy at a voltage of not 
 less than 100 kilovolts or, in the case of facilities 
 that include advanced transmission conductors 
 (including superconductors), as defined by the 
 Commission, voltages determined to be appropriate by 
 the Commission; and
 (7) the proposed modification (including 
 reconductoring) will maximize, to the extent reasonable 
 and economical, the transmission capabilities of 
 existing towers, structures, or rights-of-way.
 (c) Permit Applications.--(1) Permit applications under 
subsection (b) shall be made in writing to the Commission.
 (2) The Commission shall issue rules specifying--
 (A) the form of the application;
 (B) the information to be contained in the 
 application; and
 (C) the manner of service of notice of the permit 
 application on interested persons.
 [(d) Comments.--In any proceeding before the Commission 
under subsection (b), the Commission shall afford each State in 
which a transmission facility covered by the permit is or will 
be located, each affected Federal agency and Indian tribe, 
private property owners, and other interested persons, a 
reasonable opportunity to present their views and 
recommendations with respect to the need for and impact of a 
facility covered by the permit.]
 (d) State Siting and Consultation.--
 (1) Preservation of state siting authority.--The 
 Commission shall have no authority to issue a permit 
 under subsection (b) for the construction or 
 modification of an electric transmission facility 
 within a State except as provided in paragraph (1) of 
 that subsection.
 (2) Consultation.--In any proceeding before the 
 Commission under subsection (b), the Commission shall 
 afford each State in which a transmission facility 
 covered by the permit is or will be located, each 
 affected Federal agency and Indian Tribe, private 
 property owners, and other interested persons, a 
 reasonable opportunity to present their views and 
 recommendations with respect to the need for and impact 
 of a facility covered by the permit.
 (3) Landowner input.--In authorizing the construction 
 or modification of an electric transmission facility 
 under subsection (b), the Commission shall take into 
 account landowner input.
 (e) Rights-of-Way.--(1) In the case of a permit under 
subsection (b) for electric transmission facilities to be 
located on property other than property owned by the United 
States or a State, if the permit holder cannot acquire by 
contract, or is unable to agree with the owner of the property 
to the compensation to be paid for, the necessary right-of-way 
to construct or modify, and operate and maintain, the 
transmission facilities and, in the determination of the 
Commission, the permit holder has made good faith efforts to 
engage with landowners and other stakeholders early in the 
applicable permitting process, the permit holder may acquire 
the right-of-way by the exercise of the right of eminent domain 
in the district court of the United States for the district in 
which the property concerned is located, or in the appropriate 
court of the State in which the property is located.
 (2) Any right-of-way acquired under paragraph (1) shall be 
used exclusively for the construction or modification of 
electric transmission facilities within a reasonable period of 
time after the acquisition.
 (3) The practice and procedure in any action or proceeding 
under this subsection in the district court of the United 
States [shall conform as nearly as practicable to the practice 
and procedure in a similar action or proceeding in the courts 
of the State in which the property is located.] shall be in 
accordance with rule 71.1 of the Federal Rules of Civil 
Procedure.
 (4) Nothing in this subsection shall be construed to 
authorize the use of eminent domain to acquire a right-of-way 
for any purpose other than the construction, modification, 
operation, or maintenance of electric transmission facilities 
and related facilities. The right-of-way cannot be used for any 
other purpose, and the right-of-way shall terminate upon the 
termination of the use for which the right-of-way was acquired.
 [(f) Compensation.--(1) Any right-of-way acquired pursuant 
to subsection (e) shall be considered a taking of private 
property for which just compensation is due.
 [(2) Just compensation shall be an amount equal to the fair 
market value (including applicable severance damages) of the 
property taken on the date of the exercise of eminent domain 
authority. (2) Just compensation shall be an amount equal to 
the fair market value (including applicable severance damages) 
of the property taken on the date of the exercise of eminent 
domain authority.]
 (f) Cost Allocation.--
 (1) Transmission tariffs.--For the purposes of this 
 section, any transmitting utility that owns, controls, 
 or operates electric transmission facilities that the 
 Commission finds to be consistent with the findings 
 under paragraphs (2) through (6) and, if applicable, 
 (7) of subsection (b) shall file a tariff or tariff 
 revision with the Commission pursuant to section 205 
 and the regulations of the Commission allocating the 
 costs of the new or modified transmission facilities.
 (2) Transmission benefits.--The Commission shall 
 require that tariffs or tariff revisions filed under 
 this subsection are just and reasonable and allocate 
 the costs of providing service to customers that 
 benefit, in accordance with the cost-causation 
 principle, including through--
 (A) improved reliability;
 (B) reduced congestion;
 (C) reduced power losses;
 (D) greater carrying capacity;
 (E) reduced operating reserve requirements; 
 and
 (F) improved access to lower cost generation 
 that achieves reductions in the cost of 
 delivered power.
 (3) Ratepayer Protection.--Customers that receive no 
 benefit, or benefits that are trivial in relation to 
 the costs sought to be allocated, from electric 
 transmission facilities constructed or modified under 
 this section shall not be involuntarily allocated any 
 of the costs of those transmission facilities, 
 provided, however, that nothing in this section shall 
 prevent a transmission utility from recovering such 
 costs through voluntary agreements with its customers.
 (g) State Law.--Nothing in this section precludes any 
person from constructing or modifying any transmission facility 
in accordance with State law.
 (h) Coordination of Federal Authorizations for Transmission 
Facilities.--(1) In this subsection:
 (A) The term ``Federal authorization'' means any 
 authorization required under Federal law in order to 
 site a transmission facility.
 (B) The term ``Federal authorization'' includes such 
 permits, special use authorizations, certifications, 
 opinions, or other approvals as may be required under 
 Federal law in order to site a transmission facility.
 (2) The Department of Energy shall act as the lead agency 
for purposes of coordinating all applicable Federal 
authorizations and related environmental reviews of the 
facility[.] except that--
 (A) the Commission shall act as the lead agency in 
 the case of facilities permitted under subsection (b) 
 and section 225; and
 (B) the Department of the Interior shall act as the 
 lead agency in the case of facilities located on a 
 lease, easement, or right-of-way granted by the 
 Secretary of the Interior under section 8(p)(1)(C) of 
 the Outer Continental Shelf Lands Act (43 U.S.C. 
 1337(p)(1)(C)).
 (3) To the maximum extent practicable under applicable 
Federal law, the [Secretary] lead agency shall coordinate the 
Federal authorization and review process under this subsection 
with any Indian tribes, multistate entities, and State agencies 
that are responsible for conducting any separate permitting and 
environmental reviews of the facility, to ensure timely and 
efficient review and permit decisions.
 (4)(A) [As head of the lead agency, the Secretary] The lead 
agency, in consultation with agencies responsible for Federal 
authorizations and, as appropriate, with Indian tribes, 
multistate entities, and State agencies that are willing to 
coordinate their own separate permitting and environmental 
reviews with the Federal authorization and environmental 
reviews, shall establish prompt and binding intermediate 
milestones and ultimate deadlines for the review of, and 
Federal authorization decisions relating to, the proposed 
facility.
 (B) The [Secretary] lead agency shall ensure that, once an 
application has been submitted with such data as the Secretary 
considers necessary, all permit decisions and related 
environmental reviews under all applicable Federal laws shall 
be completed--
 (i) within 1 year; or
 (ii) if a requirement of another provision of Federal 
 law does not permit compliance with clause (i), as soon 
 thereafter as is practicable.
 (C) The [Secretary] lead agency shall provide an 
expeditious pre-application mechanism for prospective 
applicants to confer with the agencies involved to have each 
such agency determine and communicate to the prospective 
applicant not later than 60 days after the prospective 
applicant submits a request for such information concerning--
 (i) the likelihood of approval for a potential 
 facility; and
 (ii) key issues of concern to the agencies and 
 public.
 (5)(A) [As lead agency head, the Secretary] The lead 
agency, in consultation with the affected agencies, shall 
prepare a single environmental review document, which shall be 
used as the basis for all decisions on the proposed project 
under Federal law.
 (B) The [Secretary] lead agency and the heads of other 
agencies shall streamline the review and permitting of 
transmission within corridors designated under section 503 of 
the Federal Land Policy and Management Act (43 U.S.C. 1763) by 
fully taking into account prior analyses and decisions relating 
to the corridors.
 (C) The document shall include consideration by the 
relevant agencies of any applicable criteria or other matters 
as required under applicable law.
 (6)(A) If any agency has denied a Federal authorization 
required for a transmission facility, or has failed to act by 
the deadline established by the [Secretary] lead agency 
pursuant to this section for deciding whether to issue the 
authorization, the applicant or any State in which the facility 
would be located may file an appeal with the President, who 
shall, in consultation with the affected agency, review the 
denial or failure to take action on the pending application.
 (B) Based on the overall record and in consultation with 
the affected agency, the President may--
 (i) issue the necessary authorization with any 
 appropriate conditions; or
 (ii) deny the application.
 (C) The President shall issue a decision not later than 90 
days after the date of the filing of the appeal.
 (D) In making a decision under this paragraph, the 
President shall comply with applicable requirements of Federal 
law, including any requirements of--
 (i) the National Forest Management Act of 1976 (16 
 U.S.C. 472a et seq.);
 (ii) the Endangered Species Act of 1973 (16 U.S.C. 
 1531 et seq.);
 (iii) the Federal Water Pollution Control Act (33 
 U.S.C. 1251 et seq.);
 (iv) the National Environmental Policy Act of 1969 
 (42 U.S.C. 4321 et seq.); and
 (v) the Federal Land Policy and Management Act of 
 1976 (43 U.S.C. 1701 et seq.).
 (7)(A) Not later than [18 months after the date of 
enactment of this section] 18 months after the date of 
enactment of the Energy Permitting Reform Act of 2024, the 
[Secretary] lead agency shall issue any regulations necessary 
to implement this subsection.
 (B)(i) Not later than [1 year after the date of enactment 
of this section] 18 months after the date of enactment of the 
Energy Permitting Reform Act of 2024, the [Secretary] lead 
agency and the heads of all Federal agencies with authority to 
issue Federal authorizations shall enter into a memorandum of 
understanding to ensure the timely and coordinated review and 
permitting of electricity transmission facilities.
 (ii) Interested Indian tribes, multistate entities, and 
State agencies may enter the memorandum of understanding.
 (C) The head of each Federal agency with authority to issue 
a Federal authorization shall designate a senior official 
responsible for, and dedicate sufficient other staff and 
resources to ensure, full implementation of the regulations and 
memorandum required under this paragraph.
 (8)(A) Each Federal land use authorization for an 
electricity transmission facility shall be issued--
 (i) for a duration, as determined by the [Secretary] 
 lead agency, commensurate with the anticipated use of 
 the facility; and
 (ii) with appropriate authority to manage the right-
 of-way for reliability and environmental protection.
 (B) On the expiration of the authorization (including an 
authorization issued before the date of enactment of this 
section), the authorization shall be reviewed for renewal 
taking fully into account reliance on such electricity 
infrastructure, recognizing the importance of the authorization 
for public health, safety, and economic welfare and as a 
legitimate use of Federal land.
 (9) In exercising the responsibilities under this section, 
the [Secretary] lead agency shall consult regularly with--
 (A) the Federal Energy Regulatory Commission;
 (B) electric reliability organizations (including 
 related regional entities) approved by the Commission; 
 and
 (C) Transmission Organizations approved by the 
 Commission.
 (i) Interstate Compacts.--(1) The consent of Congress is 
given for three or more contiguous States to enter into an 
interstate compact, subject to approval by Congress, 
establishing regional transmission siting agencies to--
 (A) facilitate siting of future electric energy 
 transmission facilities within those States; and
 (B) carry out the electric energy transmission siting 
 responsibilities of those States.
 (2) The Secretary shall provide technical assistance to 
regional transmission siting agencies established under this 
subsection.
 (3) The regional transmission siting agencies shall have 
the authority to review, certify, and permit siting of 
transmission facilities [, including facilities in national 
interest electric transmission corridors] (other than 
facilities on property owned by the United States).
 (4) The Commission shall have no authority to issue a 
permit for the construction or modification of an electric 
transmission facility within a State that is a party to a 
compact, unless the Secretary determines that the members of 
the compact are unable to reach an agreement on an application 
seeking approval by the [in disagreement after the later of] 
unable to reach an agreement on an application seeking approval 
by the--
 [(A) the date that is 1 year after the date on which 
 the relevant application for the facility was filed.]
 [(B) the date that is 1 year after the date on which 
 the relevant national interest electric transmission 
 corridor was designated by the Secretary under 
 subsection (a).]
 (j) Relationship to Other Laws.--(1) Except as specifically 
provided, nothing in this section affects any requirement of an 
environmental law of the United States, including the National 
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
 (2) Subsection (h)(6) shall not apply to any unit of the 
National Park System, the National Wildlife Refuge System, the 
National Wild and Scenic Rivers System, the National Trails 
System, the National Wilderness Preservation System, or a 
National Monument.
 [(k) ERCOT.--This section shall not apply within the area 
referred to in section 212(k)(2)(A).]
 (k) Jurisdiction.--
 (1) ERCOT.--This section shall not apply within the 
 area referred to in section 212(k)(2)(A).
 (2) Other utilities.--
 (A) In general.--For the purposes of this 
 section, the Commission shall have jurisdiction 
 over all transmitting utilities, including 
 transmitting utilities described in section 
 201(f), but excluding any ERCOT utility (as 
 defined in section 212(k)(2)(B)).
 (B) Clarification.--Being subject to 
 Commission jurisdiction for the purposes of 
 this section shall not make an entity described 
 in section 201(f) a public utility for the 
 purposes of section 201(e).

 * * * * * * *

SEC. 219. TRANSMISSION INFRASTRUCTURE INVESTMENT.

 (a) Rulemaking Requirement.--Not later than 1 year after 
the date of enactment of this section, the Commission shall 
establish, by rule, incentive-based (including performance-
based) rate treatments for the transmission of electric energy 
in interstate commerce by public utilities for the purpose of 
benefitting consumers by ensuring reliability and reducing the 
cost of delivered power by reducing transmission congestion.
 (b) Contents.--The rule shall--

 * * * * * * *

 (4) allow recovery of--
 (A) all prudently incurred costs necessary to 
 comply with mandatory reliability standards 
 issued pursuant to section 215; [and]
 (B) all prudently incurred costs related to 
 transmission infrastructure development 
 pursuant to section 216 [.]; and
 (C) all prudently incurred costs associated with 
 payments to jurisdictions impacted by electric 
 transmission facilities developed pursuant to section 
 216 or 225.

 * * * * * * *

SEC. 223. JOINT BOARDS ON ECONOMIC DISPATCH.

 * * * * * * *

SEC. 224. TRANSMISSION STUDY.

 (a) In General.--Not later than 1 year after the date of 
enactment of this section and every 3 years thereafter, the 
Secretary of Energy (referred to in this section as the 
`Secretary'), in consultation with affected States and Indian 
Tribes, shall conduct a study of electric transmission capacity 
constraints and congestion.
 (b) Report.--Not less frequently than once every 3 years, 
the Secretary, after considering alternatives and 
recommendations from interested parties (including an 
opportunity for comment from affected States and Indian 
Tribes), shall issue a report, based on the study under 
subsection (a) or other information relating to electric 
transmission capacity constraints and congestion, which may 
identify any geographic area that--
 (1) is experiencing electric energy transmission 
 capacity constraints or congestion that adversely 
 affects consumers; or
 (2) is expected to experience such energy 
 transmission capacity constraints or congestion.
 (c) Consultation.--Not less frequently than once every 3 
years, the Secretary, in conducting the study under subsection 
(a) and issuing the report under subsection (b), shall consult 
with affected transmission planning regions (as defined in 
section 225(a)) and any appropriate regional entity referred to 
in section 215.
 (d) Alaska.--The Secretary--
 (1) shall, in consultation with the State of Alaska 
 and affected Indian Tribes, consider any intrastate 
 transmission capacity constraints and congestion within 
 the State of Alaska in the study under subsection (a); 
 and
 (2) in issuing the report under subsection (b), may, 
 subject to the approval of the Regulatory Commission of 
 Alaska, identify any geographic area in the State of 
 Alaska that--
 (A) is experiencing electric energy 
 transmission capacity constraints or congestion 
 that adversely affects consumers; or
 (B) is expected to experience such energy 
 transmission capacity constraints or 
 congestion.

SEC. 225. PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE GRID 
 RELIABILITY, AFFORDABILITY, AND RESILIENCE.

 (a) Definitions.--In this section:
 (1) Commission.--The term ``Commission'' means the 
 Federal Energy Regulatory Commission.
 (2) ERO.--The term ``ERO'' has the meaning given the 
 term in section 215(a).
 (3) Improved reliability.--The term ``improved 
 reliability'' means that, on balance, considering each 
 of the matters described in subparagraphs (A) through 
 (D), reliability is improved in a material manner that 
 benefits customers through at least one of the 
 following:
 (A) facilitating compliance with a mandatory 
 standard for reliability approved by the 
 Commission under section 215;
 (B) a reduction in expected unserved energy, 
 loss of load hours, or loss of load probability 
 (as defined by the ERO);
 (C) facilitating compliance with a tariff 
 requirement or process for resource adequacy on 
 file with the Commission; and
 (D) any other similar material improvement, 
 including a reduction in correlated outage 
 risk, such as achieved through increased 
 geographic or resource diversification.
 (4) Interregional transmission facility.--The term 
 ``interregional transmission facility'' means a 
 transmission facility that--
 (A) is located within 2 or more neighboring 
 transmission planning regions; or
 (B) significantly impacts the ability of 1 or 
 more transmission planning regions to transmit 
 electric energy among neighboring transmission 
 planning regions.
 (5) Transmission planning region.--
 (A) In general.--The term ``transmission 
 planning region''--
 (i) when used in a geographical 
 sense, means a region for which the 
 Commission determines that electric 
 transmission planning is appropriate, 
 such as a region established in 
 accordance with Order No. 1000 of the 
 Commission, entitled `Transmission 
 Planning and Cost Allocation by 
 Transmission Owning and Operating 
 Public Utilities' (76 Fed. Reg. 49842 
 (August 11, 2011)); and
 (ii) when used in a corporate sense, 
 means the Transmission Organization or 
 other entity responsible for planning 
 or operating electric transmission 
 facilities within a region described in 
 clause (i).
 (B) Exclusion.--The term ``transmission 
 planning region'' does not include the Electric 
 Reliability Council of Texas or the region 
 served by members of the Electric Reliability 
 Council of Texas.
 (b) Jurisdiction.--
 (1) ERCOT.--This section shall not apply within the 
 area referred to in section 212(k)(2)(A).
 (2) Other utilities.--
 (A) In general.--For the purposes of this 
 section, the Commission shall have jurisdiction 
 over all transmitting utilities, including 
 transmitting utilities described in section 
 201(f), but excluding any ERCOT utility (as 
 defined in section 212(k)(2)(B)).
 (B) Clarification.--Being subject to 
 Commission jurisdiction for the purposes of 
 this section shall not make an entity described 
 in section 201(f) a public utility for the 
 purposes of section 201(e).
 (c) Rulemaking Requirement.--Not later than 180 days after 
the date of enactment of this section, the Commission shall, 
consistent with the requirements of this section, by rule--
 (1) require neighboring transmission planning regions 
 to jointly plan with each other;
 (2) require each transmission planning region to 
 submit to the Commission for approval a joint 
 interregional transmission plan with each of its 
 neighboring transmission planning regions, which 
 requirement may, at the discretion of the transmission 
 planning region, be satisfied through the submission 
 of--
 (A) a separate joint interregional 
 transmission plan with each of its neighboring 
 transmission planning regions; or
 (B) 1 or more joint interregional 
 transmission plans, any of which may be 
 submitted with any 1 or more of its neighboring 
 transmission planning regions; and
 (3) establish rate treatments for interregional 
 transmission planning and cost allocation.
 (d) Plan Elements.--The Commission shall require, within 
the rule under subsection (c), that joint interregional 
transmission plans contain the following elements:
 (1) Compatibility.--A common set of input assumptions 
 and models, on a consistent timeline, that--
 (A) allow for the joint identification and 
 selection, by transmission planning regions, of 
 specific interregional transmission facilities 
 for construction or modification, including 
 through the use of advanced transmission 
 conductors (including superconductors) and 
 reconductoring;
 (B) consider, to the extent reasonable and 
 economical, modifications that maximize the 
 transmission capabilities of existing towers, 
 structures, or rights-of-way; and
 (C) consider existing transmission plans.
 (2) Transmission benefits.--A common set of benefits 
 for interregional transmission planning and cost 
 allocation, including--
 (A) improved reliability;
 (B) reduced congestion;
 (C) reduced power losses;
 (D) greater carrying capacity;
 (E) reduced operating reserve requirements; 
 and
 (F) improved access to lower cost generation 
 that achieves reductions in the cost of 
 delivered power.
 (3) Selection criteria.--Criteria governing the 
 selection by transmission planning regions, for 
 construction or modification, of interregional 
 transmission facilities that--
 (A) provide improved reliability;
 (B) protect or benefit consumers; and
 (C) are consistent with the public interest.
 (e) Deadline; Updates.--The joint interregional 
transmission plans required to be submitted to the Commission 
pursuant to the rule under subsection (c) shall be--
 (1) submitted to the Commission not later than 2 
 years after the date of enactment of this section; and
 (2) updated not less frequently than once every 4 
 years.
 (f) Commission Review.--The Commission shall--
 (1) review each joint interregional transmission plan 
 submitted pursuant to the rule under subsection (c); 
 and
 (2) approve the joint interregional transmission plan 
 if the Commission finds that the plan--
 (A) meets the requirements of subsection (d);
 (B) allocates costs in accordance with 
 subsection (g);
 (C) ensures that all rates, charges, terms, 
 and conditions will be just and reasonable and 
 not unduly discriminatory or preferential; and
 (D) is consistent with the public interest.
 (g) Cost Allocation.--
 (1) Transmission tariffs.--For the purposes of this 
 section, any transmitting utility that owns, controls, 
 or operates electric transmission facilities 
 constructed or modified as a result of this section 
 shall file a tariff or tariff revision with the 
 Commission pursuant to section 205 and the regulations 
 of the Commission allocating the costs of the new or 
 modified transmission facilities.
 (2) Requirement.--The Commission shall require that 
 tariffs or tariff revisions filed under this section 
 are just and reasonable and allocate the costs of 
 providing service to customers that benefit, in 
 accordance with the cost-causation principle, including 
 through the benefits described in subsection (d)(2).
 (3) Ratepayer protection.--Customers that receive no 
 benefit, or benefits that are trivial in relation to 
 the costs sought to be allocated, from electric 
 transmission facilities constructed or modified under 
 this section shall not be involuntarily allocated any 
 of the costs of those transmission facilities.
 (h) Construction Permit.--For the purposes of obtaining a 
construction permit under section 216(b), a project that is 
selected by transmission planning regions pursuant to a joint 
interregional transmission plan shall be considered to satisfy 
paragraphs (2) through (6) and, if applicable, (7) of that 
section.
 (i) Dispute Resolution.--In the event of a dispute between 
transmission planning regions with respect to a material 
element of a joint interregional transmission plan--
 (1) the transmission planning regions shall submit to 
 the Commission their respective proposals for resolving 
 the material element in dispute for resolution; and
 (2) not later than 60 days after the proposals are 
 submitted under paragraph (1), the Commission shall 
 issue an order directing a resolution to the dispute.
 (j) Failure to Submit Plan.--In the event that neighboring 
transmission planning regions fail to submit to the Commission 
a joint interregional transmission plan under this section, the 
Commission shall, as the Commission determines to be 
appropriate--
 (1) grant a request to extend the time for submission 
 of the joint interregional transmission plan; or
 (2) require, by order, the transmitting utilities 
 within the affected transmission planning regions to 
 comply with a joint interregional transmission plan 
 approved by the Commission--
 (A) based on the record of the planning 
 process conducted by the affected transmission 
 planning regions; and
 (B) in accordance with the cost allocation 
 provisions in subsection (g).
 (k) NEPA.--For purposes of the National Environmental 
Policy Act of 1969 (42 U.S.C. 4321 et seq.)--
 (1) any approval of a joint interregional 
 transmission plan under subsection (f) or (j) or order 
 directing resolution of a dispute under subsection (i) 
 shall not be considered a major Federal action; and
 (2) any permit granted under section 216(b) for a 
 project that is selected by transmission planning 
 regions pursuant to a joint interregional transmission 
 plan shall be considered a major Federal action.
 (l) Savings Provision.--Except as expressly provided in 
this section, nothing in this section shall be construed as 
conferring, limiting, or impairing any authority of the 
Commission under any other provision of law.

 * * * * * * *

 BONNEVILLE PROJECT ACT OF 1937

 Act of August 20, 1937, Chapter 720, as Amended

 AN ACT To the completion, maintenance, and operation of Bonneville 
project for navigation, and for other purposes.

 * * * * * * *

 [Sec. 10. The Secretary of the Interior shall appoint, 
without regard to the civil-service laws, an Assistant 
Administrator, chief engineer, and general counsel and shall 
fix the compensation of each in accordance with the 
Classification Act of 1923, as amended. The assistant 
Administrator shall perform the duties and exercise the powers 
of the Administrator, in the event of the absence or sickness 
of the Administrator until such absence or sickness shall cease 
and in the event of a vacancy in the office of Administrator 
until a successor is appointed.
 [(b) The Administrator, the Secretary of War, and the 
Federal Power Commission, respectively, are authorized to 
appoint, subject to the civil-service laws, such officers and 
employees as may be necessary to carry out the purposes of this 
Act, the appointment of whom is not otherwise provided for, and 
to fix their compensation in accordance with the Classification 
Act of 1923, as amended. The Administrator may employ laborers, 
mechanics, and workmen in connection with construction work or 
the operation and maintenance of electrical facilities 
(hereinafter called ``laborers, mechanics, and workmen''), 
subject to the civil-service laws, and fix their compensation 
without regard to the Classification Act of 1923, as amended, 
and any other laws, rules, or regulations relating to the 
payment of employees of the United States except the Act of May 
29, 1930 (46 Stat. 468), as amended, to the extent that it 
otherwise is applicable. The Administrator is further 
authorized to employ physicians, under agreement and without 
regard to civil-service laws or regulations, to make physical 
examinations of employees or prospective employees who are or 
may become laborers, mechanics, and workmen. The Administrator, 
the Secretary of War, and the Federal Power Commission, 
respectively, are also authorized to appoint, without regard to 
the civil-service laws, such experts as may be necessary for 
carrying out the functions entrusted to them under this Act and 
to fix the compensation of each of such experts without regard 
to the Classification Act of 1923, as amended, but at not to 
exceed $7500 per annum.]
 (a) Employee Compensation Program.--
 (1) In general.--Notwithstanding any other law, rule, 
 regulation, or directive relating to the payment of 
 Federal employees (other than chapter 83 of title 5, 
 United States Code), the administrator shall develop, 
 implement, and, as appropriate, update, based on the 
 results of an annual review under paragraph (4), a 
 compensation plan that specifies and fixes the 
 compensation (including salary or any other pay, 
 bonuses, benefits, incentives, and any other form of 
 remuneration) for employees of the administrator, 
 including members of the Senior Executive Service (as 
 defined in section 2101a of title 5, United States 
 Code).
 (2) Initial compensation plan.--
 (A) In general.--Not later than 1 year after 
 the date of enactment of the Energy Permitting 
 Reform Act of 2024, the administrator shall, in 
 consultation with the Director of the Office of 
 Personnel Management, and subject to 
 confirmation and approval by the Secretary of 
 Energy, which shall not be unreasonably 
 withheld, develop an initial compensation plan 
 under paragraph (1).
 (B) Implementation.--Not later than 1 year 
 after the date on which the initial 
 compensation plan is developed under 
 subparagraph (A), the administrator shall 
 implement the initial compensation plan.
 (3) Requirements.--A compensation plan developed 
 under paragraph (1) shall--
 (A) be based on an annual survey of the 
 prevailing compensation for similar positions 
 in the public sectors of the electric industry;
 (B) be consistent with the approved annual 
 general and administrative budget of the 
 administrator and encourage the widest 
 diversified use of electric power at the lowest 
 possible rates to consumers consistent with 
 sound business principles;
 (C) provide that education, experience, level 
 of responsibility, geographic differences, and 
 retention and recruitment needs are to be taken 
 into account in determining the compensation of 
 employees of the administrator;
 (D) provide that the individual total 
 compensation of the administrator and any 
 employee of the administrator shall be 
 comparable to and competitive with similar 
 positions among consumer-owned utilities in the 
 Western Interconnection.
 (4) Annual review.--
 (A) In general.--Annually, the administrator 
 shall review and update, as appropriate, the 
 compensation plan developed under paragraph 
 (1).
 (B) Compensation of the administrator.--
 Notwithstanding any other law, rule, 
 regulation, or directive relating to the 
 payment of the administrator (other than 
 chapter 83 of title 5, United States Code), the 
 Secretary shall periodically review and update, 
 as appropriate, the compensation of the 
 administrator consistent with paragraph (3)(D).
 (C) Publication of information.--The 
 administrator shall include in the quarterly 
 public business review of the administrator or 
 any other appropriate public review of the 
 operations and finances of the administrator 
 information on the applicable annual 
 compensation plan review under subparagraph 
 (A), including information on the amount of 
 salaries of any employees whose annual salaries 
 would exceed the annual rate payable for 
 positions at Level IV of the Executive Schedule 
 under section 5315 of title 5, United States 
 Code.
 (5) Annual publication.--Annually, the administrator 
 shall publish the compensation plan developed under 
 paragraph (1) or updated under paragraph (4), as 
 applicable.
 (b) Appointment; Employment.--
 (1) In general.--The administrator may, as the 
 administrator determines to be necessary to carry out 
 this Act, subject to applicable civil service laws--
 (A) appoint any officers and employees;
 (B) employ laborers, mechanics, and workers 
 for construction work or the operation and 
 maintenance of electrical facilities; and
 (C) fix the compensation of individuals 
 appointed under subparagraph (A) or (B), 
 respectively, consistent with the applicable 
 compensation plan developed under subsection 
 (a)(1).
 (2) Exemption from certain civil service laws.--In 
 carrying out the authority provided by paragraph (1), 
 the administrator shall be exempt from chapters 34, 43, 
 51, 53, 57, and 59 of title 5, United States Code.
 (3) Application of merit system principles.--
 Employees of the administrator are subject to the 
 application of the merit system principles set forth in 
 section 2301 of title 5, United States Code, to the 
 extent that the principles apply to a wholly owned 
 Government corporation.
 (4) Employment of physicians.--The administrator may 
 employ physicians, without regard to the civil service 
 laws (including regulations), to perform physical 
 examinations of employees of the administrator or 
 prospective employees of the administrator who are or 
 may become laborers, mechanics, and workers described 
 in paragraph (1)(B).
 (5) Employment of experts.--The administrator may 
 appoint, without regard to the civil service laws 
 (including regulations), any experts that the 
 administrator determines to be necessary to carry out 
 the functions of the administrator under this Act.
 (c) The Administrator may accept and utilize such voluntary 
and uncompensated services and with the consent of the agency 
concerned may utilize such officers, employees, or equipment of 
any agency of the Federal, State, or local governments which he 
finds helpful in carrying out the purposes of this Act; in 
connection with the utilization of such services, reasonable 
payments may be allowed for necessary travel and other 
expenses.

 NATURAL GAS ACT

 Act of June 21, 1938, Chapter 556, as Amended

 AN ACT To regulate the transportation and sale of natural gas in 
interstate commerce, and for other purposes.

 * * * * * * *

 EXPORTATION OR IMPORTATION OF NATURAL GAS; LNG TERMINALS

 Sec. 3. (a) After six months from the date on which this 
act takes effect no person shall export any natural gas from 
the United States to a foreign country or import any natural 
gas from a foreign country without first having secured an 
order of the Commission authorizing it to do so. The Commission 
shall issue such order upon application, unless, after 
opportunity for hearing, it finds that the proposed exportation 
or importation will not be consistent with the public interest. 
The Commission may by its order grant such application, in 
whole or in part, with such modification and upon such terms 
and conditions as the Commission may find necessary or 
appropriate, and may from time to time, after opportunity for 
hearing, and for good cause shown, make such supplemental order 
in the premises as it may find necessary or appropriate.
 (b) With respect to natural gas which is imported into the 
United States from a nation with which there is in effect a 
free trade agreement requiring national treatment for trade in 
natural gas, and with respect to liquefied natural gas--
 (1) the importation of such natural gas shall be 
 treated as a ``first sale'' within the meaning of 
 section 2(21) of the Natural Gas Policy Act of 1978; 
 and
 (2) the Commission shall not, on the basis of 
 national origin, treat any such imported natural gas on 
 an unjust, unreasonable, unduly discriminatory, or 
 preferential basis.
 (c) For purposes of subsection (a), the importation of the 
natural gas referred to in subsection (b), or the exportation 
of natural gas to a nation with which there is in effect a free 
trade agreement requiring national treatment for trade in 
natural gas, shall be deemed to be consistent with the public 
interest, and applications for such importation or exportation 
shall be granted without modification or delay.

 * * * * * * *

 (e)(1) The Commission shall have the exclusive authority to 
approve or deny an application for the siting, construction, 
expansion, or operation of an LNG terminal. Except as 
specifically provided in this Act, nothing in this Act is 
intended to affect otherwise applicable law related to any 
Federal agency's authorities or responsibilities related to LNG 
terminals.

 * * * * * * *

 (3)(A) Except as provided in subparagraph (B) and 
subsection (g), the Commission may approve an application 
descripted in paragraph (2), in whole or part, with such 
modifications and upon such terms and conditions as the 
Commission find necessary or appropriate.
 (B) Before January 1, 2015, the Commission shall 
 not--
 (i) deny an application solely on the basis 
 that the applicant proposes to use the LNG 
 terminal exclusively or partially for gas that 
 the applicant or an affiliate of the applicant 
 will supply to the facility; or
 (ii) condition an order on--
 (I) a requirement that the LNG 
 terminal offer service to customers 
 other than the applicant, or any 
 affiliate of the applicant, securing 
 the order:
 (II) any regulation of the rates, 
 charges, terms, or conditions of 
 service of the LNG terminal; or
 (III) a requirement to file with the 
 Commission schedules or contracts 
 related to the rates, charges, terms, 
 or conditions of service of the LNG 
 terminal.
 (C) Subparagraph (B) shall cease to have effect on 
 January 1, 2030.

 * * * * * * *

 (g) Deadline To Act on Certain Export Applications.--
 (1) In general.--The Commission shall grant or deny 
 an application under subsection (a) to export to a 
 foreign country any natural gas from the United States 
 not later than 90 days after the later of--
 (A) the date on which the notice of 
 availability for each final review required 
 under the National Environmental Policy Act of 
 1969 (42 U.S.C. 4321 et seq.) for the exporting 
 facility is published with respect to an 
 application--
 (i) under subsection (e); or
 (ii) for a license for the ownership, 
 construction, or operation of a 
 deepwater port, under section 4 of the 
 Deepwater Port Act of 1974 (33 U.S.C. 
 1503); and
 (B) the date of enactment of this subsection.
 (2) Applications to re-export.--The Commission shall 
 grant or deny an application under subsection (a) to 
 re-export to another foreign country any natural gas 
 that has been exported from the United States to Canada 
 or Mexico for liquefaction in Canada or Mexico, or the 
 territorial waters of Canada or Mexico, not later than 
 90 days after the later of--
 (A) the date on which the notice of 
 availability for each draft review required 
 under the National Environmental Policy Act of 
 1969 (42 U.S.C. 4321 et seq.) for the 
 application is published; and
 (B) the date of enactment of this subsection.
 (3) Applications for extensions.--The Commission 
 shall grant or deny an application for an extension of 
 a previously issued authorization to export natural gas 
 described in paragraph (1) or (2) not later than 90 
 days after the later of--
 (A) the date the application for extension is 
 received by the Commission; and
 (B) the date of enactment of this subsection.
 (4) Failure to act.--If the Commission fails to grant 
 or deny an application subject to this subsection by 
 the applicable date required by this subsection, the 
 application shall be considered to be granted and a 
 final agency order.

 * * * * * * *

 INDIAN RIGHT OF WAY ACT

 Act of February 5, 1948, Chapter 45

AN ACT To empower the Secretary of the Interior to grant rights-of-way 
 for various purposes across lands of individual Indians or Indian 
tribes, communities, bands or nations.

 * * * * * * *

 Be it enacted by the Senate and House of Representatives of 
the United States of America in Congress assembled, [That the 
Secretary of the Interior be, and he is hereby, empowered to]

SECTION 1. RIGHTS-OF-WAY FOR ALL PURPOSES ACROSS INDIAN LAND.

 The Secretary of the Interior may grant rights-of-way for 
all purposes, subject to such conditions as he may prescribe, 
over and across any lands now or hereafter held in trust by the 
United States for individual Indians or Indian tribes, 
communities, bands, or nations, or any lands now or hereafter 
owned, subject to restrictions against alienation, by 
individual Indians or Indian tribes, communities, bands, or 
nations, including the lands belonging to the Pueblo Indians in 
New Mexico, and any other lands heretofore or hereafter 
acquired or set aside for the use and benefit of Indians.
 Sec. 2. No grant of a right-of-way over and across any 
lands belonging to a tribe [organized under the Act of June 18, 
1934 (48 Stat. 984), as amended; the Act of May 1, 1936 (49 
Stat. 1250); or the Act of June 26, 1936 (49 Stat. 1967),] 
shall be made without the consent of the proper tribal 
officials. Rights-of-way over and across lands of individual 
Indians may be granted without the consent of the individual 
Indian owners if (1) the land is owned by more than one person, 
and the owners or owner of a majority of the interests therein 
consent to the grant; (2) the whereabouts of the owner of the 
land or an interest therein are unknown, and the owners or 
owner of any interests therein whose whereabouts are known, or 
a majority thereof, consent to the grant; (3) the heirs or 
devisees of a deceased owner of the land or an interest therein 
have not been determined, and the Secretary of the Interior 
finds that the grant will cause no substantial injury to the 
land or any owner thereof; or (4) the owners of interests in 
the land are so numerous that the Secretary finds it would be 
impracticable to obtain their consent, and also finds that the 
grant will cause no substantial injury to the land or any owner 
thereof.

 * * * * * * *

SEC. 8. TRIBAL GRANTS OF RIGHTS-OF-WAY.

 (a) Rights-of-Way.--
 (1) In general.--Subject to paragraph (2), an Indian 
 tribe may grant a right-of-way over and across the 
 Tribal land of the Indian tribe for any purpose.
 (2) Authority.--A right-of-way granted under 
 paragraph (1) shall not require the approval of the 
 Secretary of the Interior or a grant by the Secretary 
 of the Interior under section 1 if the right-of-way 
 granted under that paragraph is executed in accordance 
 with a Tribal regulation approved by the Secretary of 
 the Interior under subsection (b).
 (b) Review of Tribal Regulations.--
 (1) Tribal regulation submission and approval.--
 (A) Submission.--An Indian tribe seeking to 
 grant a right-of-way under subsection (a) shall 
 submit for approval a Tribal regulation 
 governing the granting of rights-of-way over 
 and across the Tribal land of the Indian tribe.
 (B) Approval.--Subject to paragraph (2), the 
 Secretary of the Interior shall have the 
 authority to approve or disapprove any Tribal 
 regulation submitted under subparagraph (A).
 (2) Considerations for approval.--
 (A) In general.--The Secretary of the 
 Interior shall approve a Tribal regulation 
 submitted under paragraph (1)(A), if the Tribal 
 regulation--
 (i) is consistent with any 
 regulations (or successor regulations) 
 issued by the Secretary of the Interior 
 under section 4;
 (ii) provides for an environmental 
 review process that includes--
 (I) the identification and 
 evaluation of any significant 
 impacts the proposed action may 
 have on the environment; and
 (II) a process for ensuring--
 (aa) that the public 
 is informed of, and has 
 a reasonable 
 opportunity to comment 
 on, any significant 
 environmental impacts 
 of the proposed action 
 identified by the 
 Indian tribe under 
 subclause (I); and
 (bb) the Indian tribe 
 provides a response to 
 each relevant and 
 substantive public 
 comment on the 
 significant 
 environmental impacts 
 identified by the 
 Indian tribe under 
 subclause (I) before 
 the Indian tribe 
 approves the right-of-
 way.
 (B) Applicable laws.--The Secretary of the 
 Interior, in making a decision to approve a 
 Tribal regulation under this subsection, shall 
 not be subject to--
 (i) the National Environmental Policy 
 Act of 1969 (42 U.S.C. 4321 et seq.);
 (ii) section 306108 of title 54, 
 United States Code; or
 (iii) the Endangered Species Act of 
 1973 (16 U.S.C. 1531 et seq.).
 (3) Review process.--
 (A) In general.--Not later than 180 days 
 after the date on which the Indian tribe 
 submits a Tribal regulation to the Secretary of 
 the Interior under paragraph (1)(A), the 
 Secretary of the Interior shall--
 (i) review the Tribal regulation;
 (ii) approve or disapprove the Tribal 
 regulation; and
 (iii) notify the Indian tribe that 
 submitted the Tribal regulation of the 
 approval or disapproval.
 (B) Written documentation.--If the Secretary 
 of the Interior disapproves a Tribal regulation 
 submitted under paragraph (1)(A), the Secretary 
 of the Interior shall include with the 
 disapproval notification under subparagraph 
 (A)(iii) written documentation describing the 
 basis for the disapproval.
 (C) Extension.--The Secretary of the Interior 
 may, after consultation with the Indian tribe 
 that submitted a Tribal regulation under 
 paragraph (1)(A), extend the 180-day period 
 described in subparagraph (A).
 (4) Federal environmental review.--Notwithstanding 
 paragraphs (2) and (3), if an Indian tribe carries out 
 a project or activity funded by a Federal agency, the 
 Indian tribe may rely on the environmental review 
 process of the applicable Federal agency rather than 
 any Tribal environmental review process required under 
 this subsection.
 (c) Documentation.--An Indian tribe granting a right-of-way 
under subsection (a) shall provide to the Secretary of the 
Interior--
 (1) a copy of the right-of-way, including any 
 amendments or renewals; and
 (2) if the right-of-way allows for compensation to be 
 made directly to the Indian tribe, documentation of 
 payments that are sufficient, as determined by the 
 Secretary of the Interior, as to enable the Secretary 
 of the Interior to discharge the trust responsibility 
 of the United States under subsection (d).
 (d) Trust Responsibility.--
 (1) In general.--The United States shall not be 
 liable for losses sustained by any party to a right-of-
 way granted under subsection (a).
 (2) Authority of the secretary.--
 (A) In general.--Pursuant to the authority of 
 the Secretary of the Interior to fulfill the 
 trust obligation of the United States to the 
 applicable Indian tribe under Federal law 
 (including regulations), the Secretary of the 
 Interior may, on reasonable notice from the 
 applicable Indian tribe and at the discretion 
 of the Secretary of the Interior, enforce the 
 provisions of, or cancel, any right-of-way 
 granted by the Indian tribe under subsection 
 (a).
 (B) Authority.--The enforcement or 
 cancellation of a right-of-way under 
 subparagraph (A) shall be conducted using 
 regulatory procedures issued under section 6.
 (e) Compliance.--
 (1) In general.--An interested party, after 
 exhaustion of any applicable Tribal remedies, may 
 submit a petition to the Secretary of the Interior, at 
 such time and in such form as determined by the 
 Secretary of the Interior, to review the compliance of 
 an applicable Indian tribe with a Tribal regulation 
 approved by the Secretary of the Interior under 
 subsection (b).
 (2) Violations.--If the Secretary of the Interior 
 determines that a Tribal regulation was violated after 
 conducting a review under paragraph (1), the Secretary 
 of the Interior may take any action the Secretary of 
 the Interior determines to be necessary to remedy the 
 violation, including rescinding the approval of the 
 Tribal regulation and reassuming responsibility for 
 approving rights-of-way through the trust land of the 
 applicable Indian tribe.
 (3) Documentation.--If the Secretary of the Interior 
 determines that a Tribal regulation was violated after 
 conducting a review under paragraph (1), the Secretary 
 of the Interior shall--
 (A) provide written documentation, with 
 respect to the Tribal regulation that has been 
 violated, to the appropriate interested party 
 and Indian tribe;
 (B) provide the applicable Indian tribe with 
 a written notice of the alleged violation; and
 (C) prior to the exercise of any remedy, 
 including rescinding the approval for the 
 applicable Tribal regulation or reassuming 
 responsibility for approving rights-of-way 
 through the trust land of the applicable Indian 
 tribe, provide the applicable Indian tribe 
 with--
 (i) a hearing that is on the record; 
 and
 (ii) a reasonable opportunity to cure 
 the alleged violation.
 (f) Savings Clause.--Nothing in this section affects the 
application of any Tribal regulations issued under Federal 
environmental law.
 (g) Effect of Tribal Regulations.--An approved Tribal 
regulation under subsection (b) shall not preclude an Indian 
tribe from, in the discretion of the Indian tribe, consenting 
to the grant of a right-of-way by the Secretary of the Interior 
under section 1.
 (h) Terms of Right-of-Way.--The compensation for, and terms 
of, a right-of-way granted under subsection (a) will be 
determined by--
 (1) negotiations by the Indian tribe; or
 (2) the regulations of the Indian tribe.
 (i) Jurisdiction.--The grant of a right-of-way under 
subsection (a) does not waive the sovereign immunity of the 
Indian tribe or diminish the jurisdiction of that Indian tribe 
over the Tribal land subject to the right-of-way, unless 
otherwise provided in--
 (1) the grant of the right-of-way; or
 (2) the regulations of the Indian tribe.

 OUTER CONTINENTAL SHELF LANDS ACT

 Act of August 7, 1953, Chapter 345, as Amended

 AN ACT To provide for the jurisdiction of the United States over the 
 submerged lands of the outer Continental Shelf, and to authorize the 
Secretary of the Interior to lease such lands for certain purposes.

 * * * * * * *

 Sec. 8. Leases, Easements, and Rights-of-Way on the Outer 
Continental Shelf.--

 * * * * * * *

 (p) Leases, Easements, or Rights-of-Way for Energy and 
Related Purposes.--

 * * * * * * *

 (4) Requirements.--The Secretary shall ensure that 
 any activity under this subsection is carried out in a 
 manner that provides for--

 * * * * * * *

 (I) [prevention of interference with 
 reasonable uses] prevention of unreasonable 
 interference with other uses (as determined by 
 the Secretary) of the exclusive economic zone, 
 the high seas, and the territorial seas;

 * * * * * * *

 [(10) Applicability.--This subsection does not apply 
 to any area on the outer Continental Shelf within the 
 exterior boundaries of any unit of the National Park 
 System, National Wildlife Refuge System, or National 
 Marine Sanctuary System, or any National Monument.]
 (10) Applicability.--
 (A) In general.--Except as provided in 
 subparagraph (B), this subsection does not 
 apply to any area on the outer Continental 
 Shelf within the exterior boundaries of any 
 unit of the National Park System, the National 
 Wildlife Refuge System, the National Marine 
 Sanctuary System, or any National Monument.
 (B) Exception.--Notwithstanding subparagraph 
 (A), the Secretary, in consultation with the 
 Secretary of Commerce under section 304(d) of 
 the National Marine Sanctuaries Act (16 U.S.C. 
 1434(d)), may grant rights-of-way on the outer 
 Continental Shelf within units of the National 
 Marine Sanctuary System for the transmission of 
 electricity generated by or produced from 
 renewable energy.
 (11) Duration of permits in marine sanctuaries.--
 Notwithstanding section 310(c)(2) of the National 
 Marine Sanctuaries Act (16 U.S.C. 1441(c)(2)), any 
 permit or authorization granted under that Act that 
 authorizes the installation, operation, or maintenance 
 of electric transmission cables on a right-of-way 
 granted by the Secretary described in paragraph (10)(B) 
 shall be issued for a term equal to the duration of the 
 right-of-way granted by the Secretary.

 * * * * * * *

 GEOTHERMAL STEAM ACT OF 1970

 Public Law 91-581

 AN ACT To authorize the Secretary of the Interior to make disposition 
of geothermal steam and associated geothermal resources, and for other 
purposes.

 * * * * * * *

SEC. 4. LEASING PROCEDURES.

 (a) Nominations.--The Secretary shall accept nominations of 
land to be leased at any time from qualified companies and 
individuals under this Act.
 (b) Competitive Lease Sales Required.--
 (1) In general.--Except as otherwise specifically 
 provided by this Act, all land to be leased that is not 
 subject to leasing under subsection (c) shall be leased 
 as provided in this subsection to the highest 
 responsible qualified bidder, as determined by the 
 Secretary.
 (2) Competitive lease sales.--The Secretary shall 
 hold a competitive lease sale at least once [every 2 
 years] per year for land in a State that has 
 nominations pending under subsection (a) if the land is 
 otherwise available for leasing.

 * * * * * * *

 (5) Replacement sales.--If a lease sale under this 
 section for a year is cancelled or delayed, the 
 Secretary shall conduct a replacement sale not later 
 than 180 days after the date of the cancellation or 
 delay, as applicable, and the replacement sale may not 
 be cancelled or delayed.

 * * * * * * *

 (g) Area Subject to Lease for Direct Use.--
 (1) In general.--Subject to paragraph (2), a 
 geothermal lease for the direct use of geothermal 
 resources shall cover not more than the quantity of 
 acreage deermined by the Secretary to be reasonable 
 necessary for the proposed use.
 (2) Limitations.--The quantity of acreage covered by 
 the lease shall not exceed the limitations established 
 under section 7.
 (h) Deadlines for Consideration of Geothermal Drilling 
Permits.--
 (1) In general.--Not later than 10 days after the 
 date on which the Secretary receives an application for 
 any geothermal drilling permit, the Secretary shall--
 (A) provide written notice to the applicant 
 that the application is complete; or
 (B) notify the applicant that information is 
 missing from the application and specify any 
 information that is required to be submitted 
 for the application to be complete.
 (2) Decision.--Not later than 30 days after the date 
 on which an applicant submits a complete application 
 for a geothermal drilling permit under paragraph (1), 
 the Secretary shall--
 (A) grant or deny the application, if the 
 requirements under the National Environmental 
 Policy Act of 1969 (42 U.S.C. 4321 et seq.) and 
 any other applicable law have been completed; 
 or
 (B) defer the decision on the application and 
 provide to the applicant notice--
 (i) that specifies steps that the 
 applicant can take for the decision on 
 the application to be issued; and
 (ii) of a list of actions that need 
 to be taken by the agency in order to 
 comply with applicable law, and 
 timelines and deadlines for completing 
 those actions.

 * * * * * * *

[SEC. 24. RULES AND REGULATIONS.

 The Secretary]

SEC. 24. RULES AND REGULATIONS.

 The Secretary shall prescribe such rules and regulations as 
he may deem appropriate to carry out the provisions of this 
Act. Such regulations may include, without limitation, 
provisions for (a) the prevention of waste, (b) development and 
conservation of geothermal and other natural resources, (c) the 
protection of the public interest, (d) assignment, segregation, 
extension of terms, relinquishment of leases, development 
contracts, unitization, pooling, and drilling agreements, (e) 
compensatory royalty agreements, suspension of operations or 
production, and suspension or reduction of rental or royalties, 
(f) the filing of surety bonds to assure compliance with the 
terms pf the lease and to protect surface use and resources, 
(g) use of the surface by a lessee of the lands embraced in his 
lease, (h) the maintenance by the lessee of an active 
development program, and (i) protection of water quality and 
other environmental qualities. The Secretary shall, not later 
than 180 days after the date of enactment of the Energy 
Permitting Reform Act of 2024, promulgate rules for cost 
recovery, to be paid by permit applicants or lessees, to 
facilitate the timely coordination and processing of leases, 
permits, and authorizations and to reimburse the Secretary for 
all reasonable administrative costs incurred from the 
inspection and monitoring of activities thereunder.

 * * * * * * *

 DEPARTMENT OF ENERGY ORGANIZATION ACT

 Public Law 95-91

 AN ACT To establish a Department of Energy in the executive branch by 
the reorganization of energy functions within the Federal Government in 
 order to secure effective management to assure a coordinated national 
energy policy, and for other purposes.

 * * * * * * *

 TITLE IV--FEDERAL ENERGY REGULATORY COMMISSION APPOINTMENT AND 
 ADMINISTRATION

 Sec. 401. (a) There is hereby established within the 
Department of Energy an independent regulatory commission to be 
known as the Federal Energy Regulatory Commission.

 * * * * * * *

 (k) Addressing Insufficient Compensationof Employees and 
Other Personnel of the Commission.--

 * * * * * * *

 (2) Certification of requirements.--A certification 
 issued under paragraph (1) shall--
 (A) apply with respect to a category of 
 employees or other personnel responsible for 
 conducting work of a scientific, technological, 
 engineering, [or mathematical] mathematical, 
 economic, or legal nature;

 * * * * * * *

 [(6) Consultation required.--The Chairman shall 
 consult with the Director of the Office of Personnel 
 Management in implementing this subsection, including 
 in the determination of the amount of compensation with 
 respect to each category of employees or other 
 personnel.]
 [(7)] (6) Experts and Consultants.--

 * * * * * * *

 PACIFIC NORTHWEST ELECTRIC POWER PLANNING AND CONSERVATION ACT

 Public Law 117-286

 AN ACT To assist the electric consumers of the Pacific Northwest 
through use of the Federal Columbia River Power System to achieve cost-
 effective energy conservation, to encourage the development of 
 renewable energy resources, to establish a representative regional 
 power planning process, to assure the region of an efficient and 
adequate power supply, and for other purposes.

 * * * * * * *

 REGIONAL PLANNING AND PARTICIPATION

 Sec. 4. (a)(1) The purposes of this section are to provide 
for the prompt establishment and effective operation of the 
Pacific Northwest Electric Power and Conservation Planning 
Council, to further the purposes of this Act by the Council 
promptly preparing and adopting (A) a regional conservation and 
electric power plan and (B) a program to protect, mitigate, and 
enhance fish and wildlife, and to otherwise expeditiously and 
effectively carry out the Council's responsibilities and 
functions under this Act.

 * * * * * * *

 (c)(1) The provisions of this subsection shall, except as 
specifically provided in this subsection, apply to the Council 
established pursuant to either subsection (a) or (b) of this 
section.

 * * * * * * *

 (10)(A) At the request of the Council, the Administrator 
shall pay from funds available to the Administrator the 
compensation and other expenses of the Council as are 
authorized by this Act, including the reimbursement of those 
States with members on the Council for services and personnel 
to assist in preparing a plan pursuant to subsection (d) and a 
program pursuant to subsection (h) of this section, as the 
Council determines are necessary or appropriate for the 
performance of its functions and responsibilities. Such 
payments shall be included by the Administrator in his annual 
budgets submitted to Congress pursuant to the Federal Columbia 
River Transmission System Act and shall be subject to the 
requirements of that Act, including the audit requirements of 
section 11(d) of such Act. The records, reports, and other 
documents of the Council shall be available to the Comptroller 
General for review in connection with such audit or other 
review and examination by the Comptroller General pursuant to 
other provisions of law applicable to the Comptroller General. 
Funds provided by the Administrator for such payments shall not 
exceed annually an amount equal to 0.02 mill multiplied by the 
kilowatt hours of firm power forecast to be sold by the 
Administrator during the year to be funded. In order to assist 
the Council's initial organization, the Administrator after the 
enactment of this Act shall promptly prepare and propose an 
amended annual budget to expedite payment for Council 
activities.
 (B) Notwithstanding the limitation contained in the fourth 
sentence of subparagraph (A) of this paragraph, upon an annual 
showing by the Council that such limitation will not permit the 
Council to carry out its functions and responsibilities under 
this Act the Administrator may raise such limit up to any 
amount not in excess of 0.10 mill multiplied by the kilowatt 
hours of firm power forecast to be sold by the Administrator 
during the year to be funded [.], adjusted for inflation since 
the date of enactment of the Energy Permitting Reform Act of 
2024.

 * * * * * * *

 OMNIBUS BUDGET RECONCILIATION ACT OF 1993

 Public Law 103-66

 AN ACT To provide for reconciliation pursuant to section 7 of the 
concurrent resolution on the budget for fiscal year 1994.

 * * * * * * *

TITLE X--NATURAL RESOURCES PROVISIONS

 * * * * * * *

 Subtitle B--Hardrock Mining Claim Maintenance Fee

SEC. 10101. FEE.

 (a) Claim Maintenance Fee.--
 (1) Lode mining claims, mill sites, and tunnel 
 sites.--[The holder of]
 (A) In general.--The holder of each 
 unpatented lode mining claim, mill site, or 
 tunnel site, located pursuant to the mining 
 laws of the United States before, on, or after 
 August 10, 1993, shall pay to the Secretary of 
 the Interior, on or before September 1 of each 
 year, to the extent provided in advance in 
 appropriations Acts, a claim maintenance fee of 
 $100 per claim or site, respectively. [Such 
 claim maintenance fee]
 (B) Fee.--The claim maintenance fee under 
 subparagraph (A) shall be in lieu of the 
 assessment work requirement contained in [the 
 Mining Law of 1872 (30 U.S.C. 28-28e)] sections 
 2319 through 2344 of the Revised Statutes (30 
 U.S.C. 22 et seq.) and the related filing 
 requirements contained in section 314 (a) and 
 (c) of the Federal Land Policy and Management 
 Act of 1976 (43 U.S.C. 1744(a) and (c)).
 (2) Placer mining claims.--[The holder of]
 (A) In general.--The holder of each 
 unpatented placer mining claim located pursuant 
 to the mining laws of the United States before, 
 on, or after August 10, 1993, shall pay to the 
 Secretary of the Interior, on or before 
 September 1 of each year, the claim maintenance 
 fee described in subsection (a)(1), for each 20 
 acres of the placer claim or portion thereof. 
 [Such claim maintenance fee]
 (B) Fee.--The claim maintenance fee under 
 subparagraph (A) shall be in lieu of the 
 assessment work requirement contained in [the 
 Mining Law of 1872 (30 U.S.C. 28-28e)] sections 
 2319 through 2344 of the Revised Statutes (30 
 U.S.C. 22 et seq.) and the related filing 
 requirements contained in section 314(a) and 
 (c) of the Federal Land Policy and Management 
 Act of 1976 (43 U.S.C. 1744(a) and (c)).
 (b) Time of Payment.--[The claim maintenance fee]
 (1) In general.--The claim maintenance fee under 
 subsection (a) shall be paid for the year in which the 
 location is made, at the time the location notice is 
 recorded with the Bureau of Land Management. [The 
 location fee]
 (2) Fee.--The location fee imposed under section 
 10102 shall be payable not later than 90 days after the 
 date of location.

 * * * * * * *

 (d) Waiver.--(1) The claim maintenance fee required under 
this section may be waived for a claimant who certifies in 
writing to the Secretary that on the date the payment was due, 
the claimant and all related parties--
 (A) held not more than 10 mining claims, mill sites, 
 or tunnel sites, or any combination thereof, on public 
 lands; and
 (B) have performed assessment work required under 
 [the Mining Law of 1872 (30 U.S.C. 28-28e)] sections 
 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 
 et seq.) to maintain the mining claims held by the 
 claimant and such related parties for the assessment 
 year ending on noon of September 1 of the calendar year 
 in which payment of the claim maintenance fee was due.

 * * * * * * *

 ENERGY POLICY ACT OF 2005

 Public Law 109-58

 AN ACT To ensure jobs for our future with secure, affordable, and 
reliable energy.

 * * * * * * *

TITLE II--RENEWABLE ENERGY

 * * * * * * *

Subtitle G--Miscellaneous

 * * * * * * *

SEC. 390. NEPA REVIEW.

 (a) NEPA Review.--Action by the Secretary of the Interior 
in managing the public lands, or the Secretary of Agriculture 
in managing National Forest System Lands, with respect to any 
of the activities described in subsection (b) shall be subject 
to a rebuttable presumption that the use of a categorical 
exclusion under the National Environmental Policy act of 1969 
[(NEPA)] (42 U.S.C. 4321 et seq.)(referred to in this section 
as ``NEPA'') would apply if the activity is conducted pursuant 
to the Mineral Leasing Act (30 U.S.C. 181 et seq.) for the 
purpose of exploration or development of oil or gas, or the 
Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) for 
purpose of exploration or development of geothermal resources.
 (b) Activities Described.--The activities referred to in 
subsection (a) are the following:

 * * * * * * *

 (2) Drilling an [oil or gas] oil, gas, or geothermal 
 resources well at a location or well pad site at which 
 drilling has occurred previously within 5 years prior 
 to the date of spudding the well.
 (3) Drilling an [oil or gas] oil, gas, or geothermal 
 resources well within a developed field for which an 
 approved land use plan or any environmental document 
 prepared pursuant to NEPA analyzed such drilling as a 
 reasonable foreseeable activity, so long as such plan 
 or document was approved within 5 years prior to the 
 date of spudding the well.

 * * * * * * *

TITLE XII--ELECTRICITY

 * * * * * * *

Subtitle B--Transmission Infrastructure Modernization

 * * * * * * *

SEC. 1222. THIRD PARTY FINANCE.

 (a) Existing Facilities.--The Secretary, acting through the 
Administrator of the Western Area Power Administration 
(hereinafter in this section referred to as ``WAPA''), or 
through the Administrator of the Southwestern Power 
Administration (hereinafter in this section referred to as 
``SWPA''), or both, may design, develop, construct, operate, 
maintain, or own, or participate with other entities in 
designing, developing, constructing, operating, maintaining, or 
owning, an electric power transmission facility and related 
facilities (``Project'') needed to upgrade existing 
transmission facilities owned by SWPA or WAPA if the Secretary, 
in consultation with the applicable Administrator, determines 
that the proposed Project--
 (1)(A) is located [in a national interest electric 
 transmission corridor designated under section 216(a)] 
 in a geographic area identified under section 224 of 
 the Federal Power Act and will reduce congestion of 
 electric transmission in interstate commerce; or
 (B) is necessary to accommodate an actual or 
 projected increase in demand for electric transmission 
 capacity;

 * * * * * * *

 (b) New Facilities.-- The Secretary, acting through WAPA or 
SWPA, or both, may design, develop, construct, operate, 
maintain, or own, or participate with other entities in 
designing, developing, constructing, operating, maintaining, or 
owning, a new electric power transmission facility and related 
facilities (``Project'') located within any State in which WAPA 
or SWPA operates if the Secretary, in consultation with the 
applicable Administrator, determines that the proposed 
Project--
 (1)(A) is located [in a national interest electric 
 transmission corridor designated under section 216(a)] 
 in a geographic area identified under section 224 of 
 the Federal Power Act and will reduce congestion of 
 electric transmission in interstate commerce; or
 (B) is necessary to accommodate an actual or 
 projected increase in demand for electric transmission 
 capacity;

 * * * * * * *

 ENERGY ACT OF 2020

 Division Z of the Consolidated Appropriations Act, 2021, Public Law 
116-260

 * * * * * * *

TITLE III--RENEWABLE ENERGY AND STORAGE

 * * * * * * *

 Subtitle B--Natural Resources Provisions

SEC. 3101. DEFINITIONS.

 In this subtitle:

 * * * * * * *

 (4) Eligible project.--The term ``eligible project'' 
 means a project carried out on covered land that uses 
 wind, solar, or geothermal energy to generate or store 
 energy.

 * * * * * * *

SEC. 3102. PROGRAM TO IMPROVE ELIGIBLE PROJECT PERMIT COORDINATION.

 (a) Establishment.--The Secretary shall establish a 
national Renewable Energy Coordination Office and State, 
district, or field offices, as appropriate, with responsibility 
to establish and implement a program to improve Federal permit 
coordination with respect to eligible projects on covered land 
and such other activities as the Secretary determines 
necessary. In carrying out the program, the Secretary may 
temporarily assign qualified staff to Renewable Energy 
Coordination Offices to expedite the permitting of eligible 
projects sufficient to achieve goals for renewable energy 
production on Federal land established under section 3104.

 * * * * * * *

 (f) Renewable Energy Project Review Standards.--Not later 
than 2 years after the date of enactment of the Energy 
Permitting Reform Act of 2024, for the purpose of encouraging 
standardized reviews and facilitating the permitting of 
eligible projects, the National Renewable Energy Coordination 
Office of the Bureau of Land Management shall promulgate 
renewable energy project review standards to be adopted by 
regional renewable energy coordination offices.
 (g) Clarification of Existing Authority.--Under section 307 
of the Federal Land Policy and Management Act of 1976 (43 
U.S.C. 1737), the Secretary may accept donations from renewable 
energy companies to improve community engagement for the 
permitting of energy projects.
 [(f)] (h) Report to Congress._

 * * * * * * *

SEC. 3104. NATIONAL GOAL FOR RENEWABLE ENERGY PRODUCTION ON FEDERAL 
 LAND.

 (a) In General.--Not later than September 1, 2022, the 
Secretary shall, in consultation with the Secretary of 
Agriculture and other heads of relevant Federal agencies, 
establish and periodically revise national goals for renewable 
energy production on Federal land.
 (b) Minimum Production Goal.--The Secretary shall seek to 
issue permits that, in total, authorize production f not less 
than 25 gigawatts of electricity from wind, solar, and 
geothermal energy projects by not later than 2025, through 
management of public lands and administration of Federal laws.
 (c) Permitting.--Subject to the limitations described in 
section 50265(b)(1) of Public Law 117-169 (43 U.S.C. 
3006(b)(1)), the Secretary shall, in consultation with the 
heads of relevant Federal agencies, seek to issue permits that 
authorize, in total, sufficient electricity from eligible 
projects to meet or exceed the national goals established and 
revised under this section.

 * * * * * * *

 INFRASTRUCTURE INVESTMENT AND JOBS ACT

 Public Law 117-58

 AN ACT To authorize funds for Federal-aid highways, highway safety 
programs, and transit programs, and for other purposes.

 * * * * * * *

DIVISION D--ENERGY

 * * * * * * *

 TITLE I--GRID INFRASTRUCTURE AND RESILIENCY

Subtitle A--Grid Infrastructure Resiliency and Reliability

 * * * * * * *

SEC. 40106. TRANSMISSION FACILITATION PROGRAM.

 * * * * * * *

 (h) Public-Private Partnerships.--The Secretary may 
participate with an eligible entity with respect to an eligible 
project under subsection (e)(1)(C) if the Secretary determines 
that the eligible project--
 (1)(A) is located [in an area designated as a 
 national interest electric transmission corridor 
 pursuant to section 216(a) of the Federal Power Act 16 
 U.S.C. 824p(a)] in a geographic area identified under 
 section 224 of the Federal Power Act; or

 * * * * * * *

 INFLATION REDUCTION ACT

 Public Law 117-169

 AN ACT To provide for reconciliation pursuant to title II of S. Con. 
Res. 14.

 * * * * * * *

 TITLE V--COMMITTEE ON ENERGY AND NATURAL RESOURCES

Subtitle A--Energy

 * * * * * * *

 PART 5--ELECTRIC TRANSMISSION

SEC. 50151. TRANSMISSION FACILITY FINANCING.

 * * * * * * *

 (b) Use of Funds.--The Secretary shall use the amounts made 
available by subsection (a) to carry out a program to pay the 
costs of direct loans to non-Federal borrowers, subject to the 
limitations that apply to loan guarantees under section 
50141(d) and under such terms and conditions as the Secretary 
determines to be appropriate, for the construction or 
modification of electric transmission [facilities designated by 
the Secretary to be necessary in the nation interest under 
section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))] 
facilities in a geographic area identified under section 224 of 
the Federal Power Act.

 * * * * * * *

PART 6--FOSSIL FUEL RESOURCES

 * * * * * * *

SEC. 50265. ENSURING ENERGY SECURITY.

 * * * * * * *

 (b) Limitation on Issuance of Certain Leases or Rights-of-
Way.--During the 10-year period beginning on the date of 
enactment of this Act--
 (1) the Secretary may not issue a right-of-way for 
 wind or solar energy development on Federal land 
 unless--
 (A) an onshore lease sale has been held 
 during the 120-day period ending on the date of 
 the issuance of the right-of-way for wind or 
 solar energy development; and
 (B) the sum total of acres offered for lease 
 in onshore lease sales during the 1-year period 
 ending on the date of the issuance of the 
 right-of-way for wind or solar energy 
 development, including only acres that were 
 nominated in previously submitted expressions 
 of interest, is not less than the lesser of--
 (i) 2,000,000 acres; and
 (ii) 50 percent of the acreage for 
 which expressions of interest have been 
 submitted for lease sales during that 
 period; and

 * * * * * * *

Source: S. Rept. 118-336 · govinfo

Committee report

Published by the committee that reported the bill, through the Government Publishing Office.

  • S. Rept. 118-336

    Committee on Energy and Natural Resources

    PDF Text

Sections of law this bill changes

25 sections in 13 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Natural gas · 15 U.S.C. ch. 15B 1 section
  • § 717b Exportation or importation of natural gas; LNG terminals Amends

    15 U.S.C. § 717b

    The law today

    (a) Mandatory authorization order After six months from June 21, 1938, no person shall export any natural gas from the United States to a foreign country or import any natural gas from a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application, unless, after opportunity for hearing, it finds that the proposed exportation or importation will not be consistent with the public interest. The Commission may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, make such supplemental order in the premises as it may find necessary or appropriate. (b) Free trade agreements With respect to natural gas which is imported into the United States from a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, and with respect to liquefied natural gas— (1) the importation of such natural gas shall be treated as a “first sale” within the meaning of section 3301(21) of this title; and (2) the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. (c) Expedited application and approval process For purposes of subsection (a), the importation of the natural gas referred to in subsection (b), or the exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, shall be deemed to be consistent with the public interest, and applications for such importation or exportation shall be granted without modification or delay. (d) Construction with other laws Except as specifically provided in this chapter, nothing in this chapter affects the rights of States under— (1) the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.); (2) the Clean Air Act (42 U.S.C. 7401 et seq.); or (3) the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.). (e) LNG terminals (1) The Commission shall have the exclusive authority to approve or deny an application for the siting, construction, expansion, or operation of an LNG terminal. Except as specifically provided in this chapter, nothing in this chapter is intended to affect otherwise applicable law related to any Federal agency’s authorities or responsibilities related to LNG terminals. (2) Upon the filing of any application to site, construct, expand, or operate an LNG terminal, the Commission shall— (A) set the matter for hearing; (B) give reasonable notice of the hearing to all interested persons, including the State commission of the State in which the LNG terminal is located and, if not the same, the Governor-appointed State agency described in section 717b–1 of this title; (C) decide the matter in accordance with this subsection; and (D) issue or deny the appropriate order accordingly. (3) (A) Except as provided in subparagraph (B), the Commission may approve an application described in paragraph (2), in whole or part, with such modifications and upon such terms and conditions as the Commission find 1 necessary or appropriate. (B) Before January 1, 2015, the Commission shall not— (i) deny an application solely on the basis that the applicant proposes to use the LNG terminal exclusively or partially for gas that the applicant or an affiliate of the applicant will supply to the facility; or (ii) condition an order on— (I) a requirement that the LNG terminal offer service to customers other than the applicant, or any affiliate of the applicant, securing the order; (II) any regulation of the rates, charges, terms, or conditions of service of the LNG terminal; or (III) a requirement to file with the Commission schedules or contracts related to the rates, charges, term...

    137 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Federal regulation and development of power · 16 U.S.C. ch. 12 3 sections Amends the act as a whole
  • § 824o Electric reliability Amends

    16 U.S.C. § 824o

    The law today

    (a) Definitions For purposes of this section: (1) The term “bulk-power system” means— (A) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and (B) electric energy from generation facilities needed to maintain transmission system reliability. The term does not include facilities used in the local distribution of electric energy. (2) The terms “Electric Reliability Organization” and “ERO” mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review. (3) The term “reliability standard” means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity. (4) The term “reliable operation” means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance, including a cybersecurity incident, or unanticipated failure of system elements. (5) The term “Interconnection” means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of one or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control. (6) The term “transmission organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities. (7) The term “regional entity” means an entity having enforcement authority pursuant to subsection (e)(4). (8) The term “cybersecurity incident” means a malicious act or suspicious event that disrupts, or was an attempt to disrupt, the operation of those programmable electronic devices and communication networks including hardware, software and data that are essential to the reliable operation of the bulk power system. (b) Jurisdiction and applicability (1) The Commission shall have jurisdiction, within the United States, over the ERO certified by the Commission under subsection (c), any regional entities, and all users, owners and operators of the bulk-power system, including but not limited to the entities described in section 824(f) of this title, for purposes of approving reliability standards established under this section and enforcing compliance with this section. All users, owners and operators of the bulk-power system shall comply with reliability standards that take effect under this section. (2) The Commission shall issue a final rule to implement the requirements of this section not later than 180 days after August 8, 2005. (c) Certification Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify one such ERO if the Commission determines that such ERO— (1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and (2) has established rules that— (A) assure its independence of the users and owners and operators of the bulk-power system, while ass...

    19 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 824p Siting of interstate electric transmission facilities Amends

    16 U.S.C. § 824p — at 824p(b), 824p(e)(3), 824p(h), and 824p(i)

    The law today

    (a) Designation of national interest electric transmission corridors (1) Not later than 1 year after August 8, 2005, and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion. (2) Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under paragraph (1) or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that— (i)  1 is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or (ii)  2 is expected to experience such energy transmission capacity constraints or congestion. (3) Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph (1) and issuing the report under paragraph (2), shall consult with any appropriate regional entity referred to in section 824o of this title. (4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether— (A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity; (B) (i) economic growth in the corridor, or the end markets served by the corridor, may be jeopardized by reliance on limited sources of energy; and (ii) a diversification of supply is warranted; (C) the energy independence or energy security of the United States would be served by the designation; (D) the designation would be in the interest of national energy policy; (E) the designation would enhance national defense and homeland security; (F) the designation would enhance the ability of facilities that generate or transmit firm or intermittent energy to connect to the electric grid; (G) the designation— (i) maximizes existing rights-of-way; and (ii) avoids and minimizes, to the maximum extent practicable, and offsets to the extent appropriate and practicable, sensitive environmental areas and cultural heritage sites; and (H) the designation would result in a reduction in the cost to purchase electric energy for consumers. (b) Construction permit Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that— (1) (A) a State in which the transmission facilities are to be constructed or modified does not have authority to— (i) approve the siting of the facilities; or (ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State; (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or (C) a State commission or other entity that has authority to approve the siting of the facilities— (i) has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of— (I) the date on which the application was filed; and (II) the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a); (ii) has conditioned its approval in such a manner that the propos...

    37 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 824s Transmission infrastructure investment Amends

    16 U.S.C. § 824s — at 824s(b)(4)

    The law today

    (a) Rulemaking requirement Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion. (b) Contents The rule shall— (1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities; (2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies); (3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and (4) allow recovery of— (A) all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; and (B) all prudently incurred costs related to transmission infrastructure development pursuant to section 824p of this title. (c) Incentives In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization. The Commission shall ensure that any costs recoverable pursuant to this subsection may be recovered by such utility through the transmission rates charged by such utility or through the transmission rates charged by the Transmission Organization that provides transmission service to such utility. (d) Just and reasonable rates All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential.

    9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Bonneville project · 16 U.S.C. ch. 12B 1 section
  • § 832i Employment of personnel Amends

    16 U.S.C. § 832i

    The law today

    (a) Appointment of Assistant Administrator, chief engineer, and general counsel; compensation; duties The Secretary of Energy shall appoint, without regard to the civil-service laws, an Assistant Administrator, chief engineer, and general counsel and shall fix the compensation of each in accordance with chapter 51 and subchapter III of chapter 53 of title 5. The Assistant Administrator shall perform the duties and exercise the powers of the Administrator, in the event of the absence or sickness of the Administrator until such absence or sickness shall cease and in the event of a vacancy in the office of Administrator until a successor is appointed (b) Officers and employees; compensation The Administrator, the Secretary of the Army, and the Secretary of Energy, respectively, are authorized to appoint, subject to the civil-service laws, such officers and employees as may be necessary to carry out the purposes of this chapter, the appointment of whom is not otherwise provided for, and to fix their compensation in accordance with chapter 51 and subchapter III of chapter 53 of title 5. The Administrator may employ laborers, mechanics, and workmen in connection with construction work or the operation and maintenance of electrical facilities (hereinafter called “laborers, mechanics, and workmen”), subject to the civil-service laws. The Administrator is further authorized to employ physicians, under agreement and without regard to civil-service laws or regulations, to make physical examinations of employees or prospective employees who are or may become laborers, mechanics, and workmen. The Administrator, the Secretary of the Army, and the Secretary of Energy, respectively, are also authorized to appoint, without regard to the civil-service laws, such experts as may be necessary for carrying out the functions entrusted to them under this chapter. (c) Voluntary and uncompensated services; utilization of personnel and equipment of other governmental agencies The Administrator may accept and utilize such voluntary and uncompensated services and with the consent of the agency concerned may utilize such officers, employees, or equipment of any agency of the Federal, State, or local governments which he finds helpful in carrying out the purposes of this chapter; in connection with the utilization of such services, reasonable payments may be allowed for necessary travel and other expenses.

    2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Pacific northwest electric power planning and conservation · 16 U.S.C. ch. 12H 1 section
  • § 839b Regional planning and participation Amends

    16 U.S.C. § 839b — at 839b(c)(10)(B)

    The law today

    (a) Pacific Northwest Electric Power and Conservation Planning Council; establishment and operation as regional agency (1) The purposes of this section are to provide for the prompt establishment and effective operation of the Pacific Northwest Electric Power and Conservation Planning Council, to further the purposes of this chapter by the Council promptly preparing and adopting (A) a regional conservation and electric power plan and (B) a program to protect, mitigate, and enhance fish and wildlife, and to otherwise expeditiously and effectively carry out the Council’s responsibilities and functions under this chapter. (2) To achieve such purposes and facilitate cooperation among the States of Idaho, Montana, Oregon, and Washington, and with the Bonneville Power Administration, the consent of Congress is given for an agreement described in this paragraph and not in conflict with this chapter, pursuant to which— (A) there shall be established a regional agency known as the “Pacific Northwest Electric Power and Conservation Planning Council” which (i) shall have its offices in the Pacific Northwest, (ii) shall carry out its functions and responsibilities in accordance with the provisions of this chapter, (iii) shall continue in force and effect in accordance with the provisions of this chapter, and (iv) except as otherwise provided in this chapter, shall not be considered an agency or instrumentality of the United States for the purpose of any Federal law; and (B) two persons from each State may be appointed, subject to the applicable laws of each such State, to undertake the functions and duties of members of the Council. The State may fill any vacancy occurring prior to the expiration of the term of any member. The appointment of six initial members, subject to applicable State law, by June 30, 1981, by at least three of such States shall constitute an agreement by the States establishing the Council and such agreement is hereby consented to by the Congress. Upon request of the Governors of two of the States, the Secretary shall extend the June 30, 1981, date for six additional months to provide more time for the States to make such appointments. (3) Except as otherwise provided by State law, each member appointed to the Council shall serve for a term of three years, except that, with respect to members initially appointed, each Governor shall designate one member to serve a term of two years and one member to serve a term of three years. The members of the Council shall select from among themselves a chairman. The members and officers and employees of the Council shall not be deemed to be officers or employees of the United States for any purpose. The Council shall appoint, fix compensation, assign and delegate duties to such executive and additional personnel as the Council deems necessary to fulfill its functions under this chapter, taking into account such information and analyses as are, or are likely to be, available from other sources pursuant to provisions of this chapter. The compensation of the members shall be fixed by State law. The compensation of the members and the officers shall not exceed the rate prescribed for Federal officers and positions at step 1 of level GS–18 of the General Schedule. (4) For the purpose of providing a uniform system of laws, in addition to this chapter, applicable to the Council relating to the making of contracts, conflicts-of-interest, financial disclosure, open meetings of the Council, advisory committees, disclosure of information, judicial review of Council functions and actions under this chapter, and related matters, the Federal laws applicable to such matters in the case of the Bonneville Power Administration shall apply to the Council to the extent appropriate, except that with respect to open meetings, the Federal laws applicable to open meetings in the case of the Federal Energy Regulatory Commission shall apply to the Council to the extent appropriate. In applying the Fe...

    3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Rights-of-way through indian lands · 25 U.S.C. ch. 8 1 section
  • § 323 Rights-of-way for all purposes across any Indian lands Amends

    25 U.S.C. § 323

    The law today

    The Secretary of the Interior be, and he is empowered to grant rights-of-way for all purposes, subject to such conditions as he may prescribe, over and across any lands now or hereafter held in trust by the United States for individual Indians or Indian tribes, communities, bands, or nations, or any lands now or hereafter owned, subject to restrictions against alienation, by individual Indians or Indian tribes, communities, bands, or nations, including the lands belonging to the Pueblo Indians in New Mexico, and any other lands heretofore or hereafter acquired or set aside for the use and benefit of the Indians.

    1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗

Mineral lands and regulations in general · 30 U.S.C. ch. 2 2 sections
  • § 28f Fee Amends

    30 U.S.C. § 28f

    The law today

    (a) Claim maintenance fee (1) Lode mining claims, mill sites, and tunnel sites The holder of each unpatented lode mining claim, mill site, or tunnel site, located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $100 per claim or site, respectively. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in the Mining Law of 1872 (30 U.S.C. 28–28e) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43. (2) Placer mining claims The holder of each unpatented placer mining claim located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, the claim maintenance fee described in subsection (a)(1), for each 20 acres of the placer claim or portion thereof. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in the Mining Law of 1872 (30 U.S.C. 28 to 28e) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43. (b) Time of payment The claim main tenance 2 fee under subsection (a) shall be paid for the year in which the location is made, at the time the location notice is recorded with the Bureau of Land Management. The location fee imposed under section 28g of this title shall be payable not later than 90 days after the date of location. (c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992 This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242). (d) Waiver (1) The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties— (A) held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and (B) have performed assessment work required under the Mining Law of 1872 (30 U.S.C. 28–28e) 1 to maintain the mining claims held by the claimant and such related parties for the assessment year ending on noon of September 1 of the calendar year in which payment of the claim maintenance fee was due. (2) For purposes of paragraph (1), with respect to any claimant, the term “related party” means— (A) the spouse and dependent children (as defined in section 152 of title 26), of the claimant; and (B) a person who controls, is controlled by, or is under common control with the claimant. For purposes of this section, the term control includes actual control, legal control, and the power to exercise control, through or by common directors, officers, stockholders, a voting trust, or a holding company or investment company, or any other means. (3) If a small miner waiver application is determined to be defective for any reason, the claimant shall have a period of 60 days after receipt of written notification of the defect or defects by the Bureau of Land Management to: (A) cure such defect or defects, or (B) pay the $100 claim maintenance fee due for such period.

    34 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 42 Patents for nonmineral lands: application, survey, notice, acreage limitation, payment Amends

    30 U.S.C. § 42

    The law today

    (a) Vein or lode and mill site owners eligible Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section. (b) Placer claim owners eligible Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode.

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Leases and prospecting permits · 30 U.S.C. ch. 3A 3 sections
  • § 201 Leases and exploration Amends

    30 U.S.C. § 201 — at 201(a), 201(a)(1), and 201(b)(3)

    The law today

    (a) Leases (1) The Secretary of the Interior is authorized to divide any lands subject to this chapter which have been classified for coal leasing into leasing tracts of such size as he finds appropriate and in the public interest and which will permit the mining of all coal which can be economically extracted in such tract and thereafter he shall, in his discretion, upon the request of any qualified applicant or on his own motion, from time to time, offer such lands for leasing and shall award leases thereon by competitive bidding: Provided, That notwithstanding the competitive bidding requirement of this section, the Secretary may, subject to such conditions which he deems appropriate, negotiate the sale at fair market value of coal the removal of which is necessary and incidental to the exercise of a right-of-way permit issued pursuant to title V of the Federal Land Policy and Management Act of 1976 [43 U.S.C. 1761 et seq.]. No less than 50 per centum of the total acreage offered for lease by the Secretary in any one year shall be leased under a system of deferred bonus payment. Upon default or cancellation of any coal lease for which bonus payments are due, any unpaid remainder of the bid shall be immediately payable to the United States. A reasonable number of leasing tracts shall be reserved and offered for lease in accordance with this section to public bodies, including Federal agencies, rural electric cooperatives, or nonprofit corporations controlled by any of such entities: Provided, That the coal so offered for lease shall be for use by such entity or entities in implementing a definite plan to produce energy for their own use or for sale to their members or customers (except for short-term sales to others). No bid shall be accepted which is less than the fair market value, as determined by the Secretary, of the coal subject to the lease. Prior to his determination of the fair market value of the coal subject to the lease, the Secretary shall give opportunity for and consideration to public comments on the fair market value. Nothing in this section shall be construed to require the Secretary to make public his judgment as to the fair market value of the coal to be leased, or the comments he receives thereon prior to the issuance of the lease. He is authorized, in awarding leases for coal lands improved and occupied or claimed in good faith, prior to February 25, 1920, to consider and recognize equitable rights of such occupants or claimants. (2) (A) The Secretary shall not issue a lease or leases under the terms of this chapter to any person, association, corporation, or any subsidiary, affiliate, or persons controlled by or under common control with such person, association, or corporation, where any such entity holds a lease or leases issued by the United States to coal deposits and has held such lease or leases for a period of ten years when such entity is not, except as provided for in section 207(b) of this title, producing coal from the lease deposits in commercial quantities. In computing the ten-year period referred to in the preceding sentence, periods of time prior to August 4, 1976, shall not be counted. (B) Any lease proposal which permits surface coal mining within the boundaries of a National Forest which the Secretary proposes to issue under this chapter shall be submitted to the Governor of each State within which the coal deposits subject to such lease are located. No such lease may be issued under this chapter before the expiration of the sixty-day period beginning on the date of such submission. If any Governor to whom a proposed lease was submitted under this subparagraph objects to the issuance of such lease, such lease shall not be issued before the expiration of the six-month period beginning on the date the Secretary is notified by the Governor of such objection. During such six-month period, the Governor may submit to the Secretary a statement of reasons why such lease should not be issu...

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 203 Additional lands or deposits Amends

    30 U.S.C. § 203 — at 203(b)

    The law today

    (a) In general (1) Except as provided in paragraph (3), on a finding by the Secretary under paragraph (2), any person, association, or corporation holding a lease of coal lands or coal deposits under the provisions of this chapter may with the approval of the Secretary of the Interior,1 secure modifications of the original coal lease by including additional coal lands or coal deposits contiguous or cornering to those embraced in the lease. (2) A finding referred to in paragraph (1) is a finding by the Secretary that the modifications— (A) would be in the interest of the United States; (B) would not displace a competitive interest in the lands; and (C) would not include lands or deposits that can be developed as part of another potential or existing operation. (3) In no case shall the total area added by modifications to an existing coal lease under paragraph (1)— (A) exceed 960 acres; or (B) add acreage larger than that in the original lease. (b) Terms and conditions The Secretary shall prescribe terms and conditions which shall be consistent with this chapter and applicable to all of the acreage in such modified lease except that nothing in this section shall require the Secretary to apply the production or mining plan requirements of sections 202a(2) and 207(c) of this title. (c) Royalties The minimum royalty provisions of section 207(a) of this title shall not apply to any lands covered by this modified lease prior to a modification until the term of the original lease or extension thereof which became effective prior to the effective date of this Act has expired.

    2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 226 Leasing of oil and gas parcels Amends

    30 U.S.C. § 226 — at 226(b), 226(q), 226(p), and 226(g)

    The law today

    (a) Leasing authorized (1) In general Any parcel of land subject to disposition under this chapter that is known or believed to contain oil or gas deposits shall be made available for leasing, subject to paragraph (2), by the Secretary of the Interior, not later than 18 months after the date of receipt by the Secretary of an expression of interest in leasing the applicable parcel of land available for disposition under this section, if the Secretary determines that the parcel of land is open to oil or gas leasing under the approved resource management plan applicable to the planning area in which the parcel of land is located that is in effect on the date on which the expression of interest was submitted to the Secretary (referred to in this subsection as the “approved resource management plan”). (2) Resource management plans (A) Lease terms and conditions A lease issued by the Secretary under this section with respect to an applicable parcel of land made available for leasing under paragraph (1)— (i) shall be subject to the terms and conditions of the approved resource management plan; and (ii) may not require any stipulations or mitigation requirements not included in the approved resource management plan. (B) Effect of amendment The initiation of an amendment to an approved resource management plan shall not prevent or delay the Secretary from making the applicable parcel of land available for leasing in accordance with that approved resource management plan if the other requirements of this section have been met, as determined by the Secretary. (b) Lands within known geologic structure of a producing oil or gas field; lands within special tar sand areas; competitive bidding; royalties (1) (A) All lands to be leased which are not subject to leasing under paragraphs (2) and (3) of this subsection shall be leased as provided in this paragraph to the highest responsible qualified bidder by competitive bidding under general regulations in units of not more than 2,560 acres, except in Alaska, where units shall be not more than 5,760 acres. Such units shall be as nearly compact as possible. Lease sales shall be conducted by oral bidding, except as provided in subparagraph (C). Lease sales shall be held for each State where eligible lands are available at least quarterly and more frequently if the Secretary of the Interior determines such sales are necessary. For purposes of the previous sentence, the term “eligible lands” means all lands that are subject to leasing under this chapter and are not excluded from leasing by a statutory prohibition, and the term “available”, with respect to eligible lands, means those lands that have been designated as open for leasing under a land use plan developed under section 1712 of title 43 and that have been nominated for leasing through the submission of an expression of interest, are subject to drainage in the absence of leasing, or are otherwise designated as available pursuant to regulations adopted by the Secretary. A lease shall be conditioned upon the payment of a royalty at a rate of not less than 12.5 percent in amount or value of the production removed or sold from the lease. The Secretary shall accept the highest bid from a responsible qualified bidder which is equal to or greater than the national minimum acceptable bid, without evaluation of the value of the lands proposed for lease. Leases shall be issued within 60 days following payment by the successful bidder of the remainder of the bonus bid, if any, and the annual rental for the first lease year. All bids for less than the national minimum acceptable bid shall be rejected. Lands for which no bids are received or for which the highest bid is less than the national minimum acceptable bid shall be offered promptly within 30 days for leasing under subsection (c) of this section and shall remain available for leasing for a period of 2 years after the competitive lease sale. (B) The national minimum acceptable bid shall be $10 ...

    128 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Geothermal resources · 30 U.S.C. ch. 23 2 sections
  • § 1003 Leasing procedures Amends

    30 U.S.C. § 1003 — at 1003(b)

    The law today

    (a) Nominations The Secretary shall accept nominations of land to be leased at any time from qualified companies and individuals under this chapter. (b) Competitive lease sale required (1) In general Except as otherwise specifically provided by this chapter, all land to be leased that is not subject to leasing under subsection (c) shall be leased as provided in this subsection to the highest responsible qualified bidder, as determined by the Secretary. (2) Competitive lease sales The Secretary shall hold a competitive lease sale at least once every 2 years for land in a State that has nominations pending under subsection (a) if the land is otherwise available for leasing. (3) Lands subject to mining claims Lands that are subject to a mining claim for which a plan of operations has been approved by the relevant Federal land management agency may be available for noncompetitive leasing under this section to the mining claim holder. (4) Land subject to oil and gas lease Land under an oil and gas lease issued pursuant to the Mineral Leasing Act (30 U.S.C. 181 et seq.) or the Mineral Leasing Act for Acquired Lands (30 U.S.C. 351 et seq.) that is subject to an approved application for permit to drill and from which oil and gas production is occurring may be available for noncompetitive leasing under subsection (c) by the holder of the oil and gas lease— (A) on a determination that geothermal energy will be produced from a well producing or capable of producing oil and gas; and (B) to provide for the coproduction of geothermal energy with oil and gas. (c) Noncompetitive leasing The Secretary shall make available for a period of 2 years for noncompetitive leasing any tract for which a competitive lease sale is held, but for which the Secretary does not receive any bids in a competitive lease sale. (d) Pending lease applications (1) In general It shall be a priority for the Secretary, and for the Secretary of Agriculture with respect to National Forest Systems land, to ensure timely completion of administrative actions, including amendments to applicable forest plans and resource management plans, necessary to process applications for geothermal leasing pending on August 8, 2005.1 All future forest plans and resource management plans for areas with high geothermal resource potential shall consider geothermal leasing and development. (2) Administration An application described in paragraph (1) and any lease issued pursuant to the application— (A) except as provided in subparagraph (B), shall be subject to this section as in effect on the day before August 8, 2005; or (B) at the election of the applicant, shall be subject to this section as in effect on August 8, 2005. (e) Leases sold as a block If information is available to the Secretary indicating a geothermal resource that could be produced as 1 unit can reasonably be expected to underlie more than 1 parcel to be offered in a competitive lease sale, the parcels for such a resource may be offered for bidding as a block in the competitive lease sale. (f) Leasing for direct use of geothermal resources Notwithstanding subsection (b), the Secretary may identify areas in which the land to be leased under this chapter exclusively for direct use of geothermal resources, without sale for purposes other than commercial generation of electricity, may be leased to any qualified applicant that first applies for such a lease under regulations issued by the Secretary, if the Secretary— (1) publishes a notice of the land proposed for leasing not later than 90 days before the date of the issuance of the lease; (2) does not receive during the 90-day period beginning on the date of the publication any nomination to include the land concerned in the next competitive lease sale; and (3) determines there is no competitive interest in the geothermal resources in the land to be leased. (g) Area subject to lease for direct use (1) In general Subject to paragraph (2), a geothermal lease for the direct use ...

    46 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 1023 Rules and regulations Amends

    30 U.S.C. § 1023

    The law today

    The Secretary shall prescribe such rules and regulations as he may deem appropriate to carry out the provisions of this chapter. Such regulations may include, without limitation, provisions for (a) the prevention of waste, (b) development and conservation of geothermal and other natural resources, (c) the protection of the public interest, (d) assignment, segregation, extension of terms, relinquishment of leases, development contracts, unitization, pooling, and drilling agreements, (e) compensatory royalty agreements, suspension of operations or production, and suspension or reduction of rentals or royalties, (f) the filing of surety bonds to assure compliance with the terms of the lease and to protect surface use and resources, (g) use of the surface by a lessee of the lands embraced in his lease, (h) the maintenance by the lessee of an active development program, and (i) protection of water quality and other environmental qualities.

    1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗

Department of energy · 42 U.S.C. ch. 84 1 section
  • § 7171 Appointment and administration Amends

    42 U.S.C. § 7171 — at 7171(k) and 7171(k)(2)(A)

    The law today

    (a) Federal Energy Regulatory Commission; establishment There is established within the Department an independent regulatory commission to be known as the Federal Energy Regulatory Commission. (b) Composition; term of office; conflict of interest; expiration of terms (1) The Commission shall be composed of five members appointed by the President, by and with the advice and consent of the Senate. One of the members shall be designated by the President as Chairman. Members shall hold office for a term of 5 years and may be removed by the President only for inefficiency, neglect of duty, or malfeasance in office. Not more than three members of the Commission shall be members of the same political party. Any Commissioner appointed to fill a vacancy occurring prior to the expiration of the term for which his predecessor was appointed shall be appointed only for the remainder of such term. A Commissioner may continue to serve after the expiration of his term until his successor is appointed and has been confirmed and taken the oath of Office, except that such Commissioner shall not serve beyond the end of the session of the Congress in which such term expires. Members of the Commission shall not engage in any other business, vocation, or employment while serving on the Commission. (2) Notwithstanding the third sentence of paragraph (1), the terms of members first taking office after April 11, 1990, shall expire as follows: (A) In the case of members appointed to succeed members whose terms expire in 1991, one such member’s term shall expire on June 30, 1994, and one such member’s term shall expire on June 30, 1995, as designated by the President at the time of appointment. (B) In the case of members appointed to succeed members whose terms expire in 1992, one such member’s term shall expire on June 30, 1996, and one such member’s term shall expire on June 30, 1997, as designated by the President at the time of appointment. (C) In the case of the member appointed to succeed the member whose term expires in 1993, such member’s term shall expire on June 30, 1998. (c) Duties and responsibilities of Chairman The Chairman shall be responsible on behalf of the Commission for the executive and administrative operation of the Commission, including functions of the Commission with respect to (1) the appointment and employment of hearing examiners in accordance with the provisions of title 5, (2) the selection, appointment, and fixing of the compensation of such personnel as he deems necessary, including an executive director, (3) the supervision of personnel employed by or assigned to the Commission, except that each member of the Commission may select and supervise personnel for his personal staff, (4) the distribution of business among personnel and among administrative units of the Commission, and (5) the procurement of services of experts and consultants in accordance with section 3109 of title 5. The Secretary shall provide to the Commission such support and facilities as the Commission determines it needs to carry out its functions. (d) Supervision and direction of members, employees, or other personnel of Commission In the performance of their functions, the members, employees, or other personnel of the Commission shall not be responsible to or subject to the supervision or direction of any officer, employee, or agent of any other part of the Department. (e) Designation of Acting Chairman; quorum; seal The Chairman of the Commission may designate any other member of the Commission as Acting Chairman to act in the place and stead of the Chairman during his absence. The Chairman (or the Acting Chairman in the absence of the Chairman) shall preside at all sessions of the Commission and a quorum for the transaction of business shall consist of at least three members present. Each member of the Commission, including the Chairman, shall have one vote. Actions of the Commission shall be determined by a majority vote of the members present....

    10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

National energy policy and programs · 42 U.S.C. ch. 149 2 sections
  • § 15942 NEPA review Amends

    42 U.S.C. § 15942

    The law today

    (a) NEPA review Action by the Secretary of the Interior in managing the public lands, or the Secretary of Agriculture in managing National Forest System Lands, with respect to any of the activities described in subsection (b) shall be subject to a rebuttable presumption that the use of a categorical exclusion under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] (NEPA) would apply if the activity is conducted pursuant to the Mineral Leasing Act [30 U.S.C. 181 et seq.] for the purpose of exploration or development of oil or gas. (b) Activities described The activities referred to in subsection (a) are the following: (1) Individual surface disturbances of less than 5 acres so long as the total surface disturbance on the lease is not greater than 150 acres and site-specific analysis in a document prepared pursuant to NEPA has been previously completed. (2) Drilling an oil or gas well at a location or well pad site at which drilling has occurred previously within 5 years prior to the date of spudding the well. (3) Drilling an oil or gas well within a developed field for which an approved land use plan or any environmental document prepared pursuant to NEPA analyzed such drilling as a reasonably foreseeable activity, so long as such plan or document was approved within 5 years prior to the date of spudding the well. (4) Placement of a pipeline in an approved right-of-way corridor, so long as the corridor was approved within 5 years prior to the date of placement of the pipeline. (5) Maintenance of a minor activity, other than any construction or major renovation or a building or facility.

    37 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16421 Third-party finance Amends

    42 U.S.C. § 16421

    The law today

    (a) Existing facilities The Secretary, acting through the Administrator of the Western Area Power Administration (hereinafter in this section referred to as “WAPA”), or through the Administrator of the Southwestern Power Administration (hereinafter in this section referred to as “SWPA”), or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, an electric power transmission facility and related facilities (“Project”) needed to upgrade existing transmission facilities owned by SWPA or WAPA if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in a national interest electric transmission corridor designated under section 216(a) of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or (B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity; (2) is consistent with— (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]), if any, or approved regional reliability organization; and (B) efficient and reliable operation of the transmission grid; and (3) would be operated in conformance with prudent utility practice. (b) New facilities The Secretary, acting through WAPA or SWPA, or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, a new electric power transmission facility and related facilities (“Project”) located within any State in which WAPA or SWPA operates if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in an area designated under section 216(a) of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or (B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity; (2) is consistent with— (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]) if any, or approved regional reliability organization; and (B) efficient and reliable operation of the transmission grid; (3) will be operated in conformance with prudent utility practice; (4) will be operated by, or in conformance with the rules of, the appropriate (A) Transmission Organization, if any, or (B) if such an organization does not exist, regional reliability organization; and (5) will not duplicate the functions of existing transmission facilities or proposed facilities which are the subject of ongoing or approved siting and related permitting proceedings. (c) Other funds (1) In general In carrying out a Project under subsection (a) or (b), the Secretary may accept and use funds contributed by another entity for the purpose of carrying out the Project. (2) Availability The contributed funds shall be available for expenditure for the purpose of carrying out the Project— (A) without fiscal year limitation; and (B) as if the funds had been appropriated specifically for that Project. (3) Allocation of costs In carrying out a Project under subsection (a) or (b), any costs of the Project not paid for by contributions from another entity shall be collected through rates charged to customers using the new transmission capability provided by the Project and allocated equitably among these project beneficiaries using the new transmission capability. (d) Relationship to other laws Nothing in this section affects any requirement of— (1) any Federal environmental law, including the National Environmental Polic...

    9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Energy infrastructure · 42 U.S.C. ch. 162 2 sections
  • § 18713 Transmission facilitation program Amends

    42 U.S.C. § 18713 — at 18713(h)(1)(A)

    The law today

    (a) Definitions In this section: (1) Capacity contract The term “capacity contract” means a contract entered into by the Secretary and an eligible entity under subsection (e)(1)(A) for the right to the use of the transmission capacity of an eligible project. (2) Eligible electric power transmission line The term “eligible electric power transmission line” means an electric power transmission line that is capable of transmitting not less than— (A) 1,000 megawatts; or (B) in the case of a project that consists of upgrading an existing transmission line or constructing a new transmission line in an existing transmission, transportation, or telecommunications infrastructure corridor, 500 megawatts. (3) Eligible entity The term “eligible entity” means an entity seeking to carry out an eligible project. (4) Eligible project The term “eligible project” means a project (including any related facility)— (A) to construct a new or replace an existing eligible electric power transmission line; (B) to increase the transmission capacity of an existing eligible electric power transmission line; or (C) to connect an isolated microgrid to an existing transmission, transportation, or telecommunications infrastructure corridor located in Alaska, Hawaii, or a territory of the United States. (5) Fund The term “Fund” means the Transmission Facilitation Fund established by subsection (d)(1). (6) Program The term “program” means the Transmission Facilitation Program established by subsection (b). (7) Related facility (A) In general The term “related facility” means a facility related to an eligible project described in paragraph (4). (B) Exclusions The term “related facility” does not include— (i) facilities used primarily to generate electric energy; or (ii) facilities used in the local distribution of electric energy. (b) Establishment There is established a program, to be known as the “Transmission Facilitation Program”, under which the Secretary shall facilitate the construction of electric power transmission lines and related facilities in accordance with subsection (e). (c) Applications (1) In general To be eligible for assistance under this section, an eligible entity shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require. (2) Procedures The Secretary shall establish procedures for the solicitation and review of applications from eligible entities. (d) Funding (1) Transmission Facilitation Fund There is established in the Treasury a fund, to be known as the “Transmission Facilitation Fund”, consisting of— (A) all amounts received by the Secretary, including receipts, collections, and recoveries, from any source relating to expenses incurred by the Secretary in carrying out the program, including— (i) costs recovered pursuant to paragraph (4); (ii) amounts received as repayment of a loan issued to an eligible entity under subsection (e)(1)(B); and (iii) amounts contributed by eligible entities for the purpose of carrying out an eligible project with respect to which the Secretary is participating with the eligible entity under subsection (e)(1)(C); (B) all amounts borrowed from the Secretary of the Treasury by the Secretary for the program under paragraph (2); and (C) any amounts appropriated to the Secretary for the program. (2) Borrowing authority The Secretary of the Treasury may, without further appropriation and without fiscal year limitation, loan to the Secretary on such terms as may be fixed by the Secretary and the Secretary of the Treasury, such sums as, in the judgment of the Secretary, are from time to time required for the purpose of carrying out the program, not to exceed, in the aggregate (including deferred interest), $2,500,000,000 in outstanding repayable balances at any 1 time. (3) Authorization of appropriations There is authorized to be appropriated to the Secretary to carry out the program, including for any administrative expenses of carry...

    12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 18715 Transmission facility financing Amends

    42 U.S.C. § 18715 — at 18715(b)

    The law today

    (a) Appropriation In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $2,000,000,000, to remain available through September 30, 2030, to carry out this section: Provided, That the Secretary shall not enter into any loan agreement pursuant to this section that could result in disbursements after September 30, 2031. (b) Use of funds The Secretary shall use the amounts made available by subsection (a) to carry out a program to pay the costs of direct loans to non-Federal borrowers, subject to the limitations that apply to loan guarantees under section 50141(d) and under such terms and conditions as the Secretary determines to be appropriate, for the construction or modification of electric transmission facilities designated by the Secretary to be necessary in the national interest under section 824p(a) of title 16. (c) Loans A direct loan provided under this section— (1) shall have a term that does not exceed the lesser of— (A) 90 percent of the projected useful life, in years, of the eligible transmission facility; and (B) 30 years; (2) shall not exceed 80 percent of the project costs; and (3) shall, on first issuance, be subject to the condition that the direct loan is not subordinate to other financing. (d) Interest rates A direct loan provided under this section shall bear interest at a rate determined by the Secretary, taking into consideration market yields on outstanding marketable obligations of the United States of comparable maturities as of the date on which the direct loan is made. (e) Definition of direct loan In this section, the term “direct loan” has the meaning given the term in section 661a of title 2.

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Submerged lands · 43 U.S.C. ch. 29 1 section
  • § 1337 Leases, easements, and rights-of-way on the outer Continental Shelf Amends

    43 U.S.C. § 1337 — at 1337(p)

    The law today

    (a) Oil and gas leases; award to highest responsible qualified bidder; method of bidding; royalty relief; Congressional consideration of bidding system; notice (1) The Secretary is authorized to grant to the highest responsible qualified bidder or bidders by competitive bidding, under regulations promulgated in advance, any oil and gas lease on submerged lands of the outer Continental Shelf which are not covered by leases meeting the requirements of subsection (a) of section 1335 of this title. Such regulations may provide for the deposit of cash bids in an interest-bearing account until the Secretary announces his decision on whether to accept the bids, with the interest earned thereon to be paid to the Treasury as to bids that are accepted and to the unsuccessful bidders as to bids that are rejected. The bidding shall be by sealed bid and, at the discretion of the Secretary, on the basis of— (A) cash bonus bid with a royalty at not less than 12½ percent, but not more than 16⅔ percent, fixed by the Secretary in amount or value of the production saved, removed, or sold; (B) variable royalty bid based on a per centum in amount or value of the production saved, removed, or sold, with either a fixed work commitment based on dollar amount for exploration or a fixed cash bonus as determined by the Secretary, or both; (C) cash bonus bid, or work commitment bid based on a dollar amount for exploration with a fixed cash bonus, and a diminishing or sliding royalty based on such formulae as the Secretary shall determine as equitable to encourage continued production from the lease area as resources diminish, but not less than 12½ percent, but not more than 16⅔ percent, at the beginning of the lease period in amount or value of the production saved, removed, or sold; (D) cash bonus bid with a fixed share of the net profits of no less than 30 per centum to be derived from the production of oil and gas from the lease area; (E) fixed cash bonus with the net profit share reserved as the bid variable; (F) cash bonus bid with a royalty at not less than 12½ percent, but not more than 16⅔ percent, fixed by the Secretary in amount or value of the production saved, removed, or sold and a fixed per centum share of net profits of no less than 30 per centum to be derived from the production of oil and gas from the lease area; (G) work commitment bid based on a dollar amount for exploration with a fixed cash bonus and a fixed royalty in amount or value of the production saved, removed, or sold; (H) cash bonus bid with royalty at not less than 12½ percent, but not more than 16⅔ percent, fixed by the Secretary in amount or value of production saved, removed, or sold, and with suspension of royalties for a period, volume, or value of production determined by the Secretary, which suspensions may vary based on the price of production from the lease; or (I) subject to the requirements of paragraph (4) of this subsection, any modification of bidding systems authorized in subparagraphs (A) through (G), or any other systems of bid variables, terms, and conditions which the Secretary determines to be useful to accomplish the purposes and policies of this subchapter, except that no such bidding system or modification shall have more than one bid variable. (2) The Secretary may, in his discretion, defer any part of the payment of the cash bonus, as authorized in paragraph (1) of this subsection, according to a schedule announced at the time of the announcement of the lease sale, but such payment shall be made in total no later than five years after the date of the lease sale. (3) (A) The Secretary may, in order to promote increased production on the lease area, through direct, secondary, or tertiary recovery means, reduce or eliminate any royalty or net profit share set forth in the lease for such area. (B) In the Western and Central Planning Areas of the Gulf of Mexico and the portion of the Eastern Planning Area of the Gulf of Mexico encompassing whole lease...

    187 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Renewable energy production on federal land · 43 U.S.C. ch. 48 4 sections
  • § 3001 Definitions Amends

    43 U.S.C. § 3001

    The law today

    In this chapter: (1) Covered land The term “covered land” means land that is— (A) Federal lands administered by the Secretary concerned; and (B) not excluded from the development of geothermal, solar, or wind energy under— (i) a land use plan; or (ii) other Federal law. (2) Federal land The term “Federal land” means— (A) public land as defined by section 103 of the Federal Land Policy Management Act of 1976 (43 U.S.C. 1702); or (B) land of the National Forest System (as defined in section 1609(a) of title 16). (3) Land use plan The term “land use plan” means— (A) for public land, a land use plan established under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); and (B) for National Forest System land, a land management plan approved, amended, or revised under section 1604 of title 16. (4) Eligible project The term “eligible project” means a project carried out on covered land that uses wind, solar, or geothermal energy to generate energy. (5) Secretary The term “Secretary” means the Secretary of the Interior.

    2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 3002 Program to improve eligible project permit coordination Amends

    43 U.S.C. § 3002

    The law today

    (a) Establishment The Secretary shall establish a national Renewable Energy Coordination Office and State, district, or field offices, as appropriate, with responsibility to establish and implement a program to improve Federal permit coordination with respect to eligible projects on covered land and such other activities as the Secretary determines necessary. In carrying out the program, the Secretary may temporarily assign qualified staff to Renewable Energy Coordination Offices to expedite the permitting of eligible projects. (b) Memorandum of understanding (1) In general Not later than 180 days after December 27, 2020, the Secretary shall enter into a memorandum of understanding for purposes of this section with— (A) the Secretary of Agriculture; (B) the Administrator of the Environmental Protection Agency; and (C) the Secretary of Defense. (2) State and tribal participation The Secretary may request the Governor of any interested State or any Tribal leader of any interested Indian Tribe (as defined in section 5304 of title 25) to be a signatory to the memorandum of understanding under paragraph (1). (c) Designation of qualified staff (1) In general Not later than 30 days after the date on which the memorandum of understanding under subsection (b) is executed, all Federal signatories, as appropriate, shall identify for each of the Bureau of Land Management Renewable Energy Coordination Offices one or more employees who have expertise in the regulatory issues relating to the office in which the employee is employed, including, as applicable, particular expertise in— (A) consultation regarding, and preparation of, biological opinions under section 1536 of title 16; (B) permits under section 1344 of title 33; (C) regulatory matters under the Clean Air Act (42 U.S.C. 7401 et seq.); (D) the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); (E) the Migratory Bird Treaty Act (16 U.S.C. 703 et seq.); (F) the preparation of analyses under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); (G) implementation of the requirements of section 306108 of title 54 (formerly known as section 106 of the National Historic Preservation Act); (H) planning under section 472a of title 16; (I) developing geothermal resources under the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.); (J) the Act of June 8, 1940 (16 U.S.C. 668 et seq., popularly known as the Bald and Golden Eagle Protection Act); and (K) section 100101(a), chapter 1003, and sections 100751(a), 100752, 100753 and 102101 of title 54 (previously known as the National Park Service Organic Act). (2) Duties Each employee assigned under paragraph (1) shall— (A) be responsible for addressing all issues relating to the jurisdiction of the home office or agency of the employee; and (B) participate as part of the team of personnel working on proposed energy projects, planning, monitoring, inspection, enforcement, and environmental analyses. (d) Additional personnel The Secretary may assign such additional personnel for the Bureau of Land Management Renewable Energy Coordination Offices as are necessary to ensure the effective implementation of any programs administered by the offices in accordance with the multiple use mandate of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.). (e) Transfer of funds To facilitate the coordination and processing of eligible project permits on Federal land under the Renewable Energy Coordination Offices, the Secretary may authorize the expenditure or transfer of any funds that are necessary to— (1) the United States Fish and Wildlife Service; (2) the Bureau of Indian Affairs; (3) the Forest Service; (4) the Corps of Engineers; (5) the National Park Service; (6) the Environmental Protection Agency; or (7) the Department of Defense. (f) Report to Congress (1) In general Not later than February 1 of the first fiscal year beginning after December 27, 2020, and each February 1 thereafter,...

    4 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 3004 National goal for renewable energy production on Federal land Amends

    43 U.S.C. § 3004

    The law today

    (a) In general Not later than September 1, 2022, the Secretary shall, in consultation with the Secretary of Agriculture and other heads of relevant Federal agencies, establish national goals for renewable energy production on Federal land. (b) Minimum production goal The Secretary shall seek to issue permits that, in total, authorize production of not less than 25 gigawatts of electricity from wind, solar, and geothermal energy projects by not later than 2025, through management of public lands and administration of Federal laws.

    3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 3006 Ensuring energy security Amends

    43 U.S.C. § 3006 — at 3006(b)(1)(B)

    The law today

    (a) Definitions In this section: (1) Federal land The term “Federal land” means public lands (as defined in section 1702 of this title). (2) Offshore lease sale The term “offshore lease sale” means an oil and gas lease sale— (A) that is held by the Secretary in accordance with the Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.); and (B) that, if any acceptable bids have been received for any tract offered in the lease sale, results in the issuance of a lease. (3) Onshore lease sale The term “onshore lease sale” means a quarterly oil and gas lease sale— (A) that is held by the Secretary in accordance with section 226 of title 30; and (B) that, if any acceptable bids have been received for any parcel offered in the lease sale, results in the issuance of a lease. (b) Limitation on issuance of certain leases or rights-of-way During the 10-year period beginning on August 16, 2022— (1) the Secretary may not issue a right-of-way for wind or solar energy development on Federal land unless— (A) an onshore lease sale has been held during the 120-day period ending on the date of the issuance of the right-of-way for wind or solar energy development; and (B) the sum total of acres offered for lease in onshore lease sales during the 1-year period ending on the date of the issuance of the right-of-way for wind or solar energy development is not less than the lesser of— (i) 2,000,000 acres; and (ii) 50 percent of the acreage for which expressions of interest have been submitted for lease sales during that period; and (2) the Secretary may not issue a lease for offshore wind development under section 8(p)(1)(C) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(p)(1)(C)) unless— (A) an offshore lease sale has been held during the 1-year period ending on the date of the issuance of the lease for offshore wind development; and (B) the sum total of acres offered for lease in offshore lease sales during the 1-year period ending on the date of the issuance of the lease for offshore wind development is not less than 60,000,000 acres. (c) Savings Except as expressly provided in paragraphs (1) and (2) of subsection (b), nothing in this section supersedes, amends, or modifies existing law.

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 5 U.S.C. § 553, 5 U.S.C. § 2101a, 5 U.S.C. § 2301, 5 U.S.C. § 5315, 16 U.S.C. § 796, 16 U.S.C. § 806, 16 U.S.C. § 1434, 16 U.S.C. § 1441, 16 U.S.C. § 1536, 25 U.S.C. § 324, 25 U.S.C. § 415, 30 U.S.C. § 28 and 9 more

How this bill changes current law

3 changes Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill amends existing laws regarding mineral leasing and permits to modernize the leasing process and modify certain requirements.

  • 30 U.S.C. 226(b)

    "(b) Expressions of interest for oil and gas leasing. The Secretary shall take into consideration expressions of interest for oil and gas leasing." → "(3) Subdivision.--(A) In general.--A parcel of land included in an expression of interest that the Secretary of the Interior offers for lease shall be leased as nominated and not subdivided into multiple parcels unless the Secretary of the Interior determines that a subpart of the submitted parcel is not open to oil or gas leasing under the approved resource management plan."

    This change ensures that lands nominated for leasing are not divided into smaller parcels without specific justification.

  • 30 U.S.C. 226(p)

    "(4) Term. A permit to drill approved under this subsection shall be valid for a period of 2 years after the date of the approval." → "(4) Term.--(A) In general.--A permit to drill approved under this subsection shall be valid for a single non-renewable 4-year period beginning on the date of the approval."

    This change extends the validity of drilling permits from 2 years to 4 years, allowing more time for operations.

  • 30 U.S.C. 226(q)

    "(1) Fee refunds for expressions of interest shall be nonrefundable." → "(3) Refund for nonwinning bid.--If a person other than the person who submitted the expression of interest is the highest responsible qualified bidder for a parcel of land covered by the applicable expression of interest in a lease sale conducted under this section--(A) as a condition of the issuance of the lease, the person who is the highest responsible qualified bidder shall pay to the Secretary of the Interior an amount equal to the applicable fee paid by the person who submitted the expression of interest; and (B) not later than 60 days after the date of the lease sale, the Secretary of the Interior shall refund to the person who submitted the expression of interest an amount equal to the amount of the initial fee paid."

    This allows for the refunding of fees associated with expressions of interest if a different bidder wins the lease.

Action History

  1. Placed on Senate Legislative Calendar under General Orders. Calendar No. 756.

  2. Committee on Energy and Natural Resources. Reported by Senator Manchin with an amendment in the nature of a substitute. With written report No. 118-336.

  3. Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

  4. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 554 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (554)

554 members have not signed on to this bill.

Show all 554 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Lobbying on this bill

From the reports lobbyists file with Congress. A report shows the bill was lobbied, not that anyone met a member about it.

414 lobbying reports for 175 clients name S 4753, the latest filed July 20, 2026.

Counted from reports filed July 23, 2024 through September 30, 2026: a report names a bill by its number, not its Congress, so we count those filed within about two years of when this bill began.

See who's lobbying on S 4753

The clients and their firms, what they reported spending, the issues and the agencies and chambers they lobbied, and former officials among the lobbyists, on any paid plan.

See plans

Source: U.S. Senate Office of Public Records, LDA.gov, retrieved August 29, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov.

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 4753 do?
A bill to reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
Who sponsors S 4753?
S 4753 is sponsored by Joe Manchin (D).
What is the current status of S 4753?
This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 4753?
Track S 4753 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 4753

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 4753

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →