United States 119th Congress Status: In Committee Sponsors 1 D

HR 10809 — Make Data Centers Pay Act

Last action — Referred to the House Committee on Energy and Commerce.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced October 13, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

In plain language

The bill aims to protect ratepayers from costs linked to data centers' electric loads.

The measure proposes amendments to the Federal Power Act to safeguard ratepayers from expenses associated with data centers and high-density computing facilities. The full details of the bill text are not available.

Summary

To amend the Federal Power Act to protect ratepayers from costs relating to the electric loads of data centers and high-density computing facilities.

Bill Text

Sections of law this bill changes

1 section in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 Amends the act as a whole

How this bill changes current law

1 change Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill adds a new section to the Federal Power Act to protect ratepayers from costs associated with the electric loads of data centers and high-density computing facilities.

  • SEC. 224. RATEPAYER PROTECTION FOR DATA CENTER AND HIGH-DENSITY COMPUTING LOAD. (a) Definitions.--In this section: (1) Commission.--The term `Commission' means the Federal Energy Regulatory Commission. (2) Covered load.--The term `covered load' means electric load that-- (A) is attributable to 1 or more data centers or high-density computing facilities located at a single site, or at multiple sites under common ownership or control; and (B) equals or exceeds 20 megawatts or, in the case of data centers or high-density computing facilities developed in phases, is reasonably expected to equal or exceed 20 megawatts at full buildout. (3) Data center or high-density computing facility.-- (A) In general.--The term `data center or high-density computing facility' means a facility, or group of colocated facilities, the primary purpose of which is to house computing, networking, or data storage equipment used to process, store, or transmit digital data, including equipment used for-- (i) artificial intelligence training or inference; (ii) cloud computing or data hosting; or (iii) cryptocurrency mining or other distributed-ledger or digital-asset computation. (B) Exclusion.--The term `data center or high-density computing facility' does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A). (4) Incremental cost.--The term `incremental cost' means the cost that would be avoided had a specific covered load not been served by the electric utility, including all costs to construct, own, and operate power generation or storage resources and electric transmission and distribution services associated with serving the covered load, based on costs estimated by the electric utility at or around the time that the covered load becomes operational and subject to approval by the Commission or a State, as appropriate. (5) State.--The term `State' includes the applicable State commission and any other State authority having jurisdiction over retail electric service. (b) Ratepayer Protection Floor.-- (1) No subsidy of covered load.--No portion of the incremental cost may be allocated to, or recovered in the rates of, any customer other than a covered load. (2) Surplus permitted.--Paragraph (1) does not limit the authority of the Commission or a State, under any other provision of law, to recover from covered loads amounts in excess of incremental cost and to credit those amounts to other customers as a rebate or a reduction to the utility costs that are used as a basis for the calculation of customer rates. (3) Continuing recovery on exit.--A rate, charge, or agreement for service to a covered load shall be designed to recover from the covered load the full incremental cost of the electric utility, and such recovery shall continue notwithstanding the termination by the covered load of a contract or other agreement pertaining to the sale of electric energy, or the cessation by the covered load of the purchase of electric energy, before that incremental cost has been fully recovered. (4) Financial assurance.--Before constructing, or making an upgrade to, a generation, transmission, or distribution facility necessary to serve a covered load, an electric utility shall require the covered load to provide financial assurances or contributions sufficient to cover the cost of the facility or upgrade, subject to the condition that any financial assurances or contributions provided by the applicable covered load to a public utility or Transmission Organization for the same facility or upgrade shall be credited against the requirement of this paragraph. (c) Rule of Construction.--Except as expressly provided in subsection (b), nothing in this section expands or diminishes the jurisdiction of the Commission or of any State, including State authority over retail electric service, rate design, and resource planning. (d) Applicability.-- (1) Prospective application.--Subsection (b) applies to a covered load that interconnects on or after the date of enactment of this section. (2) Existing arrangements.--An arrangement to serve a covered load that was approved by the Commission or by a State before the date of enactment of this section shall remain in effect.

    This section establishes a framework to prevent ratepayers from bearing the costs incurred by utilities for serving large electric loads from data centers and similar facilities.

Action History

  1. Referred to the House Committee on Energy and Commerce.

  2. Introduced in House

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 539 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (539)

539 members have not signed on to this bill.

Show all 539 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 10809 do?
To amend the Federal Power Act to protect ratepayers from costs relating to the electric loads of data centers and high-density computing facilities.
Who sponsors HR 10809?
HR 10809 is sponsored by Eugene Vindman (D).
What is the current status of HR 10809?
This bill is in committee in the House. Introduced October 13, 2026. It must pass committee before a floor vote.
Where can I track HR 10809?
Track HR 10809 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 10809

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 10809

Last checked for changes 12 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →