Regulation of Canada

Wastewater Systems Effluent Regulations

Statute Watch

Get an alert when a bill in Parliament would change this regulation, and every time it moves.

Citation
SOR/2012-139
Current to
June 14, 2026
Last amended
June 4, 2026
Made under
Fisheries Act, R.S.C. 1985, c. F-14
Official text
Justice Laws Website ↗

Bills in Parliament that would change it 0

No bill we hold would amend or repeal it.

Contents 57 entries

Interpretation

1 Definitions

Application

2 Application 3 Types of wastewater systems 4 Consolidated wastewater systems

Authorization to Deposit

Effluent Containing Deleterious Substances

5 Prescribed deleterious substances 6 Authorization to deposit

Volume of Effluent

7 Average daily volume deposited annually 8 Default measurement

Monitoring

Monitoring Equipment

9 Requirements

Composition of the Effluent

10 Taking of samples — intermittent wastewater system

Acute Lethality Testing

11 Taking of samples — intermittent wastewater system

Test Methods

12 CBOD matter 13 Suspended solids 14 Un-ionized ammonia 15 Acute lethality

Accredited Laboratory

16 Accredited laboratory

Record Keeping

17 Information to be recorded

Reporting

Identification Report

18 Required information

Monitoring Report and Notice

19 Information 19.1 Notice

Combined Sewer Overflow Report

20 Information

Record Making and Retention of Documents

21 When records made 22 Retention of records

Transitional and Temporary Authorizations to Deposit

Purpose

23 Paragraph 36(4)(b) of the Act

Transitional Authorization

Requirements and Duration

24 Transitional authorization — eligibility

Application

25 Required information

Conditions of Issuance

26 Required information 27 [Repealed, SOR/2024-97, s. 21]

Conditions on Transitional Authorizations

28 Authorized deposits — transitional authorization

Compliance Obligations

29 General requirements

Scope of Transitional Authorization and Revocation

30 Content of transitional authorization 31 Correction of information 32 Revocation 33 Transitional authorization — termination

Temporary Authorization to Deposit Un-ionized Ammonia

Requirements and Duration

34 Requirements

Application

35 Required information

Conditions of Issuance

36 Required information

Conditions on Temporary Authorization

37 Authorized deposits

Compliance Obligations

38 General requirements

Scope of Temporary Authorization and Revocation

39 Period and content 40 Extension 41 Correction of information 42 Revocation

Temporary Bypass Authorization

Requirements

43 Deposit without or with partial treatment

Bypass Categories for Temporary Bypass Authorizations

43.1 Physical or biological treatment 43.2 Bypass category determination — physical or biological treatment 43.3 Bypass category determination — no physical or biological treatment 43.4 Precipitation event

Application

44 Required information

Conditions of Issuance

45 Required information

Conditions on Temporary Bypass Authorizations

45.1 Authorized deposit

Compliance Obligations

45.2 General requirements

Issuance

46 Content of authorization 47 Correction of information

General

48 Electronic applications 49 Registry of authorizations

Coming into Force

50 On registration