Wastewater Systems Effluent Regulations, SOR/2012-139

Section 45.2

General requirements

Cite as Wastewater Systems Effluent Regulations, SOR/2012-139, s. 45.2 · current to June 14, 2026 · regulation last amended June 4, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) An owner or operator of a wastewater system who holds a temporary bypass authorization must, during the period of authorization, comply with, (a) if the bypass occurs only at one or more overflow points, (i) sections 5 to 19, 21, 22 and 48 for the effluent deposited via all the final discharge points of the wastewater system; and (ii) paragraph 17(b) and section 20 for the effluent deposited via all the combined sewer overflow points of the wastewater system, (b) if the bypass occurs at at least one final discharge point, (i) sections 7 to 10, subsections 11(1) to (3) and (7), sections 12 to 19, 21, 22 and 48 for the effluent deposited via all the final discharge points of the wastewater system; and (ii) paragraph 17(b) and section 20 for the effluent deposited via all the combined sewer overflow points of the wastewater system. (2) Despite subsection (1), if, during the period of authorization, the volume or rate of flow of the influent or effluent cannot be measured in accordance with section 9, the holder of a temporary authorization may determine the daily volume of effluent by using a method of estimation in accordance with subsection 7(4). (3) The holder of a temporary bypass authorization must, within 90 days after the last day of the period of the authorization, send to the authorization officer a final report on the temporary bypass that includes the following information, as applicable: (a) the actual duration of the deposits; (b) the actual or estimated volume of the deposits; (c) a description of any actual treatment applied to effluent; (d) a description of how the mitigation and monitoring measures referred to in paragraphs 44(1)(h.1) and (h.2) have been implemented; (e) the results of any monitoring referred to in subparagraph 44(2)(b)(iv) conducted during the bypass period; and (f) for a Category 2 bypass as determined in accordance with sections 43.3 or 43.4 or a Category 3 bypass as determined in accordance with sections 43.2 to 43.4, a confirmation of the existence of a plan that describes modifications to be made to the wastewater system and any other measures to be taken to reduce the need for future temporary bypass authorizations and to limit any adverse effects on fish, fish habitat or the use by man of fish when performing work referred to in paragraph 43(2)(a), including a schedule for implementation of the plan. (4) The holder of a temporary bypass authorization must ensure that the plan referred to in paragraph (3)(f) is available for examination by the public.
Read the Wastewater Systems Effluent Regulations on the Justice Laws Website ↗

Made under Fisheries Act, R.S.C. 1985, c. F-14.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.