Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.57
Panel handling
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.57 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) Tilt-up panel lifting and bracing operations must be done under the direct supervision of a qualified person.
(2) Tilt-up panel lifting must not start until the specified minimum concrete strength has been achieved, as verified through testing in a manner acceptable to the professional engineer responsible for the lifting and bracing design.
(3) A suitable bond breaker must be used to minimize adhesion of each tilt-up panel to the casting surface and wedges and pry bars must be used to assist in releasing the panel from the casting surface.
(4) Crane positions must, where practicable, be chosen to avoid blind lifts.
(5) If a blind lift is necessary, the crane must be located so that if a lift component fails the tilt-up panel will not contact the crane, and if such a crane position is not possible, the safety factor for the lifting inserts must be at least 4.0.
(6) Workers are not permitted in the danger area of the downside face of a tilt-up panel until all bracing components for the panel have been installed.
(7) If bracing or other attachments are required on the downside face of a tilt-up panel, they may only be installed after the panel is erect and is temporarily braced from the upside face as specified in the erection procedures.
(8) All specified tilt-up panel bracing including knee braces and any welded connection specified for temporary support must be installed as detailed before the hoisting rigging is slackened.
(9) Cross-lacing of knee bracing may be done after the hoisting rigging is disconnected but must be no more than one panel behind the lifting process.
(10) All specified bracing must be installed on erected tilt-up panels before leaving the site at the end of the work day.
(11) Drilled-in expansion bolts may only be used to secure braces if specifically authorized by the engineer responsible for the lift and bracing design.
(12) Tilt-up panel lifting must not be done if wind gust velocities exceed 55 km/h (35 mph).
(13) The job site and areas adjacent to braced tilt-up panels must be cleared of personnel if wind gust velocities exceed 100 km/h (60 mph).
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.