Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.58
Inspections
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.58 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) The professional engineer who certified the erection procedure or the engineer's designated representative must inspect the site prior to the start of tilt-up panel lifting to ensure that lift procedures and temporary bracing requirements are understood, and a follow-up inspection must occur on the last day of tilt-up panel lifting to ensure that temporary bracing requirements have been met.
(2) Following each inspection required by subsection (1) the person inspecting must issue an inspection report addressing the matters specified in subsection (1) and a copy of the report must be maintained at the site while the temporary bracing system is in place.
(3) Work must not proceed on tilt-up panel lifting or in proximity to panels which have been temporarily braced until the relevant requirements of subsections (1) and (2) have been met.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.