(0.1) In this section,
“non-sewered flush toilet facilities” means water flush toilets or chemical flush toilets that have the features listed in subsection (0.2); (“installations de toilettes à chasse non raccordées à un réseau d’égouts”)
“sewered toilet facilities” means water flush toilets that are connected to a sanitary sewer system and equipped with a trap in accordance with the applicable provisions of the Building Code. (“installations de toilettes raccordées à un réseau d’égouts”) O. Reg. 527/00, s. 2 (1); O. Reg. 142/17, s. 7.
(0.2) The features referred to in the definition of “non-sewered flush toilet facilities” in subsection (0.1) are:
1. The toilets are not connected to a sanitary sewer system.
2. They are equipped with a trap or a positive seal separating stored waste from the bowl.
3. The waste is first flushed from the bowl with water or with water containing chemical additives. Then the waste is deposited into a container and chemically treated sufficiently for the container’s maximum capacity. O. Reg. 527/00, s. 2 (1).
(1) Each toilet facility shall meet the following requirements:
1. The facility shall have,
i. a toilet with an open-front toilet seat,
ii. a toilet paper holder and an adequate supply of toilet paper, and
iii. a self-closing door that can be locked from the inside.
2. The facility shall,
i. be adequately illuminated by natural or artificial light,
ii. be adequately heated, if that is possible,
iii. be adequately ventilated, and
iv. afford the user privacy and protection from weather and falling objects.
3. If the facility is a single-toilet facility, it shall be completely enclosed. O. Reg. 61/23, s. 3 (1).
(1.1) For greater certainty, the requirement that a facility be completely enclosed does not apply to a portable urinal. O. Reg. 61/23, s. 3 (1).
(2) Separate toilet facilities shall be provided for male and female workers, unless the facilities are intended to be used by only one worker at a time. O. Reg. 145/00, s. 15.
(2.1) Where the minimum number of toilets required at a project under subsection (5) or (7) is five or more, at least one facility at the project shall be for the use of female workers only, where reasonable in the circumstances. O. Reg. 61/23, s. 3 (2).
(2.2) If the facility is intended for use by males only or females only, it shall have a sign indicating that. O. Reg. 61/23, s. 3 (2).
(2.3) If the facility is intended for use by female workers, there shall be a disposal receptacle for menstrual products. O. Reg. 61/23, s. 3 (2); O. Reg. 190/24, s. 2.
(3) Sewered toilet facilities or non-sewered flush toilet facilities shall be provided at a project, subject to subsection (4). O. Reg. 145/00, s. 15.
(4) If a project is being carried out in a remote unpopulated area and it is not reasonably possible to provide toilet facilities required under subsection (3), other types of toilet facilities shall be provided. O. Reg. 61/23, s. 3 (3).
(5) When water flush toilets or non-recirculating chemical flush toilets are provided, the minimum number of toilets required at the project is as follows:
TABLE
Item | Column 1 Minimum number of toilets | Column 2 Number of workers regularly employed at the project
1. | 1 | 1-15
2. | 2 | 16-30
3. | 3 | 31-45
4. | 4 | 46-60
5. | 4, plus 1 additional toilet for each additional group of 15 or fewer workers | 61 or more
(6) If the toilets are located in a multiple water flush toilet facility and are intended to be used by male workers, water flush urinals may be substituted for a maximum of two-thirds of the number of toilets required by subsection (5). O. Reg. 145/00, s. 15.
(7) When toilets other than water flush toilets or non-recirculating chemical flush toilets are provided, the minimum number of toilets required at the project is as follows:
TABLE
Item | Column 1 Minimum number of toilets | Column 2 Number of workers regularly employed at the project
1. | 1 | 1-10
2. | 2 | 11-20
3. | 3 | 21-30
4. | 4 | 31-40
5. | 4, plus 1 additional toilet for each additional group of 15 or fewer workers | 41 or more
(8) If the toilets are located in a portable single-unit toilet facility intended for use by male workers, there shall be at least one urinal for each toilet. O. Reg. 145/00, s. 15.
(9) Portable urinals equipped with clean-up facilities are permitted in addition to the requirements of this section. O. Reg. 145/00, s. 15.
Read the CONSTRUCTION PROJECTS on e-Laws ↗