CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 29.2
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 29.2 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) Subject to subsection (1.0.1), each single-toilet facility shall be provided with its own clean-up facility. O. Reg. 61/23, s. 4 (1).
(1.0.1) One readily accessible clean-up facility may be provided for every two single-toilet facilities if those single-toilet facilities are located together in the same area at the project. O. Reg. 61/23, s. 4 (1).
(1.1) In a multiple-toilet facility at a project, one clean-up facility shall be provided for every two toilets. O. Reg. 527/00, s. 3.
(2) Each clean-up facility shall meet the following requirements:
1. Subject to subsection (3), the facility shall have a wash basin with running water. Both hot and cold running water shall be available if reasonably possible.
2. Soap or hand cleanser shall be provided.
3. Paper towels or a hand dryer shall be provided. If paper towels are provided, there shall be a waste disposal receptacle nearby. O. Reg. 145/00, s. 15.
(3) If it is not reasonably possible to have a wash basin with running water at a clean-up facility, both of the following shall be provided:
1. A means of cleaning hands.
2. An alcohol-based hand sanitizer containing a minimum of 60 per cent alcohol. O. Reg. 61/23, s. 4 (2).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.