CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 29

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 29 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) In this section, “facilities” means toilet, urinal and clean-up facilities; (“installations”) “service”, when used as a verb, means to have waste pumped out and to have the facilities replenished where necessary. (“entretenir”) O. Reg. 527/00, s. 1. (2) Revoked: O. Reg. 527/00, s. 1. (3) The constructor shall ensure, (a) that facilities are provided or arranged for workers before work has started at a project; and (b) that workers at the project have reasonable access to these facilities. O. Reg. 145/00, s. 15. (4) Subject to subsections (5) and (6), the facilities shall be located not more than 90 metres, where reasonably possible, and otherwise not more than 180 metres, measured horizontally, from the project work area. O. Reg. 61/23, s. 2 (1). (5) If work is being performed in a tunnel, the facilities shall be located not more than 180 metres, measured horizontally, from the entrance to the tunnel. O. Reg. 142/17, s. 6. (6) The facilities may be located not more than 3 kilometres from the work area if transportation to the facilities is provided for workers where reasonably required. O. Reg. 142/17, s. 6. (7) If the project is the construction of a building, the facility shall be located not more than 9 metres, measured vertically, from the level at which work is being performed, in addition to meeting the requirement set out in subsection (4). O. Reg. 142/17, s. 6. (8) The location of the facilities under subsection (7) may be varied if the arrangement affords reasonable accessibility for workers. O. Reg. 145/00, s. 15. (9) If the location of the facilities is varied under subsection (8), the constructor shall document in writing the location and the reasons for the variance, and shall provide the document to, (a) the joint health and safety committee or the health and safety representative, if any, for the workplace; or (b) the workers, if there is no committee or representative for the workers. O. Reg. 145/00, s. 15. (10) The constructor shall, (a) inform workers of the location of the facilities; and (b) post the location of the facilities in a conspicuous place at the project if it is practical to do so. O. Reg. 145/00, s. 15. (11) The facilities shall be serviced, cleaned and sanitized as frequently as necessary to maintain them in a clean and sanitary condition. O. Reg. 145/00, s. 15. (11.1) The facilities shall be kept in good repair at all times. O. Reg. 61/23, s. 2 (2). (12) In addition to the requirements of Ontario Regulation 480/24 (Washroom Facilities – Records of Cleaning) made under the Act, the constructor shall keep at the project, (a) a record of the servicing of the facilities, including any associated cleaning and sanitizing, which must include the date of all services for the past six months or the duration of the project, whichever is shorter; and (b) a copy of the document required under subsection (9), if any, which must be kept for the duration of the project. O. Reg. 482/24, s. 1. (13) Facilities that are not under the constructor’s control satisfy the requirements of this section only if the constructor has received permission from the facilities’ owner for workers to use the facilities. O. Reg. 145/00, s. 15.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.