CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 236

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 236 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) Every prefabricated, hydraulic or engineered support system shall be designed by an engineer. O. Reg. 213/91, s. 236 (1); O. Reg. 375/22, s. 5. (2) Every prefabricated, hydraulic or engineered support system shall be constructed, installed, used and maintained in accordance with its design drawings and specifications. O. Reg. 213/91, s. 236 (2). (3) The design drawings and specifications for a prefabricated, hydraulic or an engineered support system, (a) shall indicate the size of the system and the type and grade of materials of which it is to be made; (b) shall indicate the maximum depth and the types of soil for which it is designed; (c) shall indicate the proper positioning of the system in the excavation, including the maximum allowable clearance between the walls of the support system and the walls of the excavation; and (d) shall indicate how to install and remove the system. (e) Revoked: O. Reg. 85/04, s. 21. (4) In addition to the requirements of subsection (3), the design drawings and specifications for a hydraulic support system, (a) shall indicate the minimum working pressure required for the system; and (b) shall require the use of a device to ensure the protection of workers if a loss of hydraulic pressure occurs in the system. O. Reg. 213/91, s. 236 (4). (5) Before a variation from the design drawings and specifications for a prefabricated, hydraulic or an engineered support system is permitted, the variation shall be approved in writing by an engineer. O. Reg. 213/91, s. 236 (5); O. Reg. 375/22, s. 5. (6) If the soil conditions on a project differ from those assumed by the engineer in designing a prefabricated, hydraulic or an engineered support system, an engineer shall modify the design drawings and specifications for the actual soil conditions or shall approve the support system for use in the actual soil conditions. O. Reg. 213/91, s. 236 (6); O. Reg. 375/22, s. 5. (7) The constructor shall keep the design drawings and specifications for a prefabricated, hydraulic or an engineered support system at a project while the system is on the project. O. Reg. 213/91, s. 236 (7). (8) Revoked: O. Reg. 443/09, s. 7.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.