CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 235
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 235 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) Subject to subsection (2), a support system shall consist of,
(a) timbering and shoring that meets the requirements of subsection 238 (2), if no hydrostatic pressure is present in the soil, and if the width and depth of the excavation are equal to or less than the width and depth indicated in the Table to section 238;
(b) a prefabricated support system that complies with sections 236 and 237;
(c) a hydraulic support system that complies with sections 236 and 237; or
(d) an engineered support system that complies with section 236. O. Reg. 213/91, s. 235 (1).
(2) Where the excavation is a trench and the depth exceeds six metres or the width exceeds 3.6 metres, the support system shall consist of an engineered support system designed for the specific location and project. O. Reg. 213/91, s. 235 (2); O. Reg. 631/94, s. 7.
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.