CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 237

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 237 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) Subject to subsection (2), (a) no prefabricated or hydraulic support system shall be used in type 4 soil; (b) the space between the walls of a prefabricated support system and the walls of the excavation shall be restricted to the minimum clearance required for the forward progression of the support system; and (c) the walls of a hydraulic support system shall touch the walls of the excavation. O. Reg. 631/94, s. 8. (2) A prefabricated or hydraulic support system may be used for repairing underground pipe breaks if the system, (a) meets the requirements of section 236; (b) has four side walls; (c) is designed for a maximum depth of 3.6 metres; (d) is not used at a greater depth than 3.6 metres; (e) is designed to resist all hydrostatic and earth pressures found in type 3 and type 4 soils; (f) is installed so as to extend to the bottom of the excavation; (g) is installed so that the walls of the system touch the walls of the excavation; and (h) is not pulled forward after being installed in the excavation. O. Reg. 631/94, s. 8. (3) Before a support system is used as described in subsection (2), the constructor shall submit two copies of its design drawings and specifications to the office of the Ministry of Labour nearest to the project. O. Reg. 631/94, s. 8.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.