CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 160

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 160 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

A tower crane shall have, (a) limiting devices to, as applicable, (i) limit trolley travel at both ends of the boom, (ii) stop boom luffing at the lower or upper limits of boom movement, (iii) stop load block upward motion before two-blocking occurs, (iv) limit crane travel at both ends of the runway tracks, (v) limit maximum load lifted in each gear ratio, (vi) prevent overloading the crane by limiting the lifted load in accordance with the operating radius, (vii) limit the maximum load lifted to the allowable line pull, and, (viii) limit pressures in hydraulic or pneumatic circuits; (b) load and radius indicating devices; and (c) such other switches and devices as the manufacturer specifies. O. Reg. 241/23, s. 16.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.