CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 159.1

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 159.1 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) An engineer shall ensure that a tower crane’s structural elements, its electrical, mechanical and hydraulic components and its control systems that may affect the structural integrity, stability or motion of a tower crane or its load are inspected in accordance with subsection (2), (a) before the tower crane is erected at a project, if 10 years have elapsed since the time the tower crane was manufactured; and (b) thereafter at least once every 10 years after the date of the last inspection under this section before the tower crane is erected at a project. O. Reg. 241/23, s. 15. (2) The inspection required in subsection (1) shall include the following: 1. Inspection of structural components including, i. visual inspection of all welds and non-destructive testing of a sampling of welds determined by an engineer, and ii. measurements of the consistency of wall thickness within the closed section of the structural components to confirm the sections are compliant with the original design requirements. 2. Inspection of the rotating shafts, gears, hook blocks and mechanical linkages for signs of cracks, damage or wear using non-destructive testing. 3. For hydraulic components, i. measurement of the pressure at which pressure relief valves actuate, and ii. testing of hydraulic holding valves used to stop movement in the case of pressure loss. 4. Measurements to confirm that components that routinely wear due to use including clutch plates, brake pads, sheaves, wire ropes, bushings and pins, are within tolerances specified by their manufacturers. 5. Inspection of non-structural components that may be subject to cracking, damage or wear. 6. Performance of operational tests on the components listed below in accordance with the manufacturer’s instructions to confirm that the components are in adequate condition and operating in accordance with the manufacturer’s specifications: i. Brakes. ii. Slew ring. iii. Hydraulic motors. iv. Hydraulic pumps. v. Valve blocks. vi. Hoist and luff drums. vii. Gearboxes and drive shafts. O. Reg. 241/23, s. 15. (3) The operational tests required under paragraph 6 of subsection (2) do not require the components to be dismantled. O. Reg. 241/23, s. 15. (4) The engineer conducting the inspection or under whose direction an inspection is done shall prepare a written report of the inspection including test results, observations, measurements and records. O. Reg. 241/23, s. 15. (5) Any defects identified in the inspection that may affect the structural integrity, non-structural components, stability or motion of the tower crane or its load shall be corrected or repaired in accordance with the instructions of the tower crane or component manufacturer or an engineer. O. Reg. 241/23, s. 15. (6) An engineer shall confirm in a written report that any defects identified have been corrected or repaired and that the corrected or repaired components are in adequate condition. O. Reg. 241/23, s. 15.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.