WELLS, R.R.O. 1990, Reg. 903
Section 14.2
Cite as WELLS, R.R.O. 1990, Reg. 903, s. 14.2 · current to November 11, 2026 · consolidated from January 1, 2020 · read from e-Laws on November 16, 2026
The text
(1) If a new well is constructed by boring and concrete casing is used, the person constructing the well shall ensure that the well is constructed with a diameter that,
(a) from the ground surface to a depth of 2.5 metres, is at least 15.2 centimetres greater than the outside diameter of the casing that will be used; and
(b) from a depth of 2.5 metres to a depth of at least the full depth of the well or six metres, whichever is less, is at least 7.6 centimetres greater than the outside diameter of the casing that will be used. O. Reg. 372/07, s. 15.
(2) If a new well is constructed by boring and concrete casing is used in the well, the person constructing the well shall comply with section 14 by ensuring that the following rules are complied with:
1. If a well screen is installed,
i. the annular space shall be filled, from the bottom of the well to at least the top of the well screen with clean, washed gravel or sand that is deposited after placement of the well screen and casing, and
ii. any remaining annular space shall be filled with suitable sealant, upward from the top of the gravel or sand referred to in subparagraph i to the bottom of the bentonite material referred to in paragraph 6.
2. The top of the gravel or sand referred to in subparagraph 1 i shall not be closer than six metres to the ground surface, unless the only useful aquifer available necessitates a shallower well, in which case the top of the gravel or sand shall not be closer than 2.5 metres to the ground surface.
3. If no well screen is installed, the annular space shall be filled with suitable sealant from the bottom of the casing upward to the bottom of the bentonite material referred to in paragraph 6.
4. The sealant referred to in subparagraph 1 ii or paragraph 3 shall be continuously deposited by forcing sealant through a tremie pipe, with the bottom end of the pipe immersed in the rising accumulation of sealant.
5. If the sealant referred to in subparagraph 1 ii or paragraph 3 contains cement,
i. it shall be allowed to set according to the manufacturer’s specifications or for 12 hours, whichever is longer, and
ii. if, after setting in accordance with subparagraph i, the sealant has settled or subsided, it shall be topped up to the original level.
6. From the ground surface to a depth of at least 2.5 metres, the annular space shall be filled with bentonite granules, pellets or chips that have been screened in accordance with the manufacturer’s specifications and that have a diameter of not more than 20 millimetres and not less than six millimetres. O. Reg. 372/07, s. 15.
(3) Subsections (1) and (2) do not apply to a test hole or dewatering well if abandonment of the test hole or dewatering well is scheduled to take place not later than 180 days after completion of the structural stage of the test hole or dewatering well. O. Reg. 372/07, s. 15.