WELLS, R.R.O. 1990, Reg. 903
Section 14.3
Cite as WELLS, R.R.O. 1990, Reg. 903, s. 14.3 · current to November 11, 2026 · consolidated from January 1, 2020 · read from e-Laws on November 16, 2026
The text
(1) If a new well is constructed by digging, the person constructing the well shall comply with section 14 by ensuring that the annular space is filled to the ground surface in accordance with the following rules:
1. The annular space from the bottom of the well to a depth not closer to the ground surface than 2.5 metres shall be filled with,
i. clean, washed gravel or sand, or
ii. native materials that were excavated from the hole, if the well is not constructed in a contaminated area and the major horizons of soil are excavated separately, stored separately, kept free from contamination and backfilled in the same relative positions that they originally occupied.
2. The remainder of the annular space shall be filled with suitable sealant that will provide the appropriate structural strength to support the weight of persons and vehicles that may move over the area after it is filled. O. Reg. 372/07, s. 15.
(2) Subsection (1) does not apply to a test hole or dewatering well if abandonment of the test hole or dewatering well is scheduled to take place not later than 180 days after completion of the structural stage of the test hole or dewatering well. O. Reg. 372/07, s. 15.
Read the WELLS on e-Laws ↗
Made under Ontario Water Resources Act, R.S.O. 1990, c. O.40.