REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25

Section 12

Operation and Maintenance Manual

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25, s. 12 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) The subsection titled “Operation and Maintenance Manual” shall contain the following respecting the relevant storm water management works, at a minimum: 1. Procedures, best practices and a description of programs for the operation, maintenance, inspection and repair of the works that the person who proposes to engage in an activity prescribed by section 2 shall ensure are implemented, including, at a minimum, the following: i. Best practices that are consistent with any manufacturers’ recommendations. ii. An inspection program, including procedures for conducting inspections of the condition of the works and methods or tests to detect when maintenance is necessary. iii. The frequency of the activities set out in the procedures, best practices and programs. 2. Contingency plans and procedures to address abnormal situations, including emergency shutdown of the works and breakdown of the works, and the circumstances in which the person shall ensure that the contingency plans and procedures are implemented. 3. Procedures to respond to and make records of complaints respecting the works. O. Reg. 137/25, s. 12 (1); O. Reg. 234/26, s. 10 (1) (2) For the purposes of subparagraph 1 iii of subsection (1), the inspection program mentioned in subparagraph 1 ii of subsection (1) shall require, at a minimum, inspections to occur at a frequency of once per year and as soon as practicable after each significant storm event. O. Reg. 137/25, s. 12 (2). (3) For the purposes of paragraph 2 of subsection (1), if the storm water management works is a spill containment works, the contingency plans and procedures shall include a spill contingency plan respecting all storm water management works servicing the same site, and spills and discharges of pollutants, including oil, that may occur at the property on which the works is or is proposed to be located, resulting in pollutants potentially entering the works or discharging from the works into the natural environment, including, at a minimum, the following procedures and information: 1. Procedures to prevent or reduce the risk of spills and discharges of pollutants. 2. Procedures to identify when a spill or discharge of pollutants has occurred, including a spill or discharge from equipment containing oil. 3. Procedures to prevent, eliminate or ameliorate any adverse effects that result or may result from the spills and discharges, including in the event of a spill or discharge from equipment containing oil. 4. Procedures to ensure that specified equipment and materials for containment, clean up and disposal of pollutants and materials contaminated with pollutants, including oil, are available at the property and in a state of readiness at all times to respond to a spill or discharge of pollutants or suspected spill or discharge of pollutants at the property. 5. Schematic representation of all the storm water management works servicing the site and discharge flow pathways. O. Reg. 234/26, s. 10 (2).
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.