REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25
Section 11
Assessment of Monitoring
Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25, s. 11 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) The section titled “Assessment of Monitoring” shall contain, in the case of a storm water management works that is not a spill containment works, an assessment by a licensed engineering practitioner as to whether it is necessary to monitor the discharge from the relevant storm water management works, taking into account the results of the site assessment and such other factors that the licensed engineering practitioner considers relevant. O. Reg. 234/26, s. 9.
(2) The section titled “Assessment of Monitoring” shall contain a monitoring plan in either of the following circumstances:
1. The storm water management works is a spill containment works.
2. In the case of a storm water management works mentioned in subsection (1), the licensed engineering practitioner’s assessment under subsection (1) is that monitoring is necessary. O. Reg. 234/26, s. 9.
(3) The monitoring plan shall contain, at a minimum, the following:
1. The parameters that the person who proposes to engage in an activity prescribed by section 2 shall ensure are monitored and the frequency at which the person shall ensure sampling or measurements are undertaken.
2. Any effluent objectives for the parameters, which the person shall make best efforts at all times to not exceed.
3. Sampling and analysis methods that the person shall ensure are applied.
4. One or more locations at which the person shall ensure monitoring is undertaken.
5. Corrective actions that the person shall ensure are taken if any effluent objective is exceeded.
6. The time period during which the person shall ensure the plan is implemented.
7. An explanation of why the time period mentioned in paragraph 6 is appropriate. O. Reg. 234/26, s. 9.
(4) For the purposes of paragraphs 1 and 2 of subsection (3), in the case of spill containment works, the parameters and effluent objectives shall include, at a minimum, the following:
1. If the spill containment works services equipment that contains oil, the parameters set out in Column 1 of items 1 and 2 of the following Table and the corresponding effluent objectives set out in Column 2 of the Table.
2. If the spill containment works services equipment that contains polychlorinated biphenyls, the parameter set out in Column 1 of item 3 of the following Table and the corresponding effluent objective set out in Column 2 of the Table.
tABLE
Item | Column 1 Parameter | Column 2 Effluent objective
1. | Oil and grease | 15 milligrams per litre
2. | Phenolics | 20 micrograms per litre
3. | Polychlorinated biphenyls | 0.01 micrograms per litre
(5) For the purposes of paragraph 1 of subsection (3), in the case of spill containment works, the frequency of monitoring shall be, at a minimum,
(a) as soon as practicable after a discharge or loss of oil or other pollutant from the equipment serviced by the works occurs; and
(b) every three months following the monitoring under clause (a), for a period of one year from the date of the discharge or loss. O. Reg. 234/26, s. 9.
(6) For the purposes of paragraph 1 of subsection (3), in the case of spill containment works, if an effluent objective for a parameter is exceeded, the frequency of monitoring shall be monthly until, at a minimum, three consecutive monitoring results demonstrate no exceedances of the effluent objectives for all the parameters. O. Reg. 234/26, s. 9.
(7) For the purposes of paragraph 4 of subsection (3), in the case of spill containment works, the plan shall specify, at a minimum, the outlet of the works as the location at which the person shall ensure monitoring is undertaken. O. Reg. 234/26, s. 9.
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.