REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25

Section 13

Erosion and Sediment Control Plan

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25, s. 13 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

The section titled “Erosion and Sediment Control Plan” shall contain the following, at a minimum, respecting temporary erosion and sediment control measures to be implemented during any construction activities that take place at the property on which the works is located or proposed to be located to prevent run-off of sediment carried in storm water from construction activities: 1. A description of the measures that the person who proposes to engage in an activity prescribed by section 2 shall ensure are implemented. 2. Procedures that the person shall apply for inspections to assess the implementation and condition of the measures. 3. The frequency at which the person shall ensure inspections are undertaken, which shall be, at a minimum, once every two weeks and as soon as practicable following each significant storm event. 4. The time period during which the person shall ensure that inspections under paragraph 3 occur, which shall include, at a minimum, the time period during which construction activities are carried out. 5. Procedures that the person shall ensure are applied for maintenance in respect of the measures, including the frequency at which maintenance shall be undertaken.
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.