REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25

Section 10

Design

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25, s. 10 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) The section titled “Design” shall contain the following, at a minimum: 1. The design criteria that the person who proposes to engage in an activity prescribed by section 2 shall ensure are achieved by the storm water management works, including the design criteria established for water quantity, water quality and water balance. 2. An explanation of how the design criteria were established and how they are expected to be achieved. 3. Details respecting the design of the works, with which the person shall ensure the works are consistent, including the following: i. Design calculations. ii. Storm water storage and treatment capacity. iii. A description of the works, including the location of all outlets and receivers. iv. Any manufacturer’s specifications for the works. v. A description and calculation of hydraulic routing of major storms. vi. Storm water run-off analysis. vii. If the storm water management works discharges or is proposed to discharge to any sewage works, a description of the sewage works and the following information: A. Whether the sewage works treats or is expected to treat the sewage before it is discharged from the sewage works. B. As applicable, either a description of the planned level of treatment or the rationale for not treating the sewage. 4. If the works is located or proposed to be located in an area mentioned in subparagraph 4 vi of section 9, a description of design considerations that are included in the report related to that location. 5. If the works discharges or is proposed to discharge storm water directly into the natural environment, a description of design considerations that are included in the report to mitigate the potential for the discharge to cause an adverse effect. 6. If there is or is expected to be outdoor handling or storage of soil, raw material, intermediate products, finished products or by-products occurring at the property at which the works is located or proposed to be located, a description of design considerations that are included in the report to mitigate the potential for the discharge of storm water from the works to cause an adverse effect. O. Reg. 137/25, s. 10 (1); O. Reg. 234/26, s. 8 (1). (2) For the purposes of paragraph 1 of subsection (1), the design criteria established for water quality for a new storm water management works shall include achieving a minimum of enhanced protection within the meaning of the document entitled “2003 Stormwater Management Planning and Design Manual”, published by the Ministry and available on a website of the Government of Ontario, if, (a) the works discharges or is proposed to discharge storm water directly into the natural environment; or (b) any of the activities engaged in or proposed to be engaged in that are prescribed by section 2 would be a significant drinking water threat. O. Reg. 137/25, s. 10 (2). (2.1) Subsection (2) does not apply in respect of a person who proposes to engage in an activity prescribed by section 2 in respect of a storm water management works if the activity is in respect of a spill containment works or an underdrain system. O. Reg. 234/26, s. 8 (2). (2.2) For the purposes of paragraph 1 of subsection (1), the design criteria established for a spill containment works that services equipment containing oil, other than a storage tank, shall include achievement of the following: 1. If the spill containment works is not hydraulically linked to any other spill containment works, a spill containment volume that is, at a minimum, equal to the sum of the following: i. The maximum volume of oil that could be contained in a single piece of equipment serviced by the works. ii. The anticipated volume of storm water from a 24-hour duration, 25-year return storm to be collected by the works. 2. If the spill containment works is hydraulically linked to another spill containment works, a collective spill containment volume that is, at a minimum, equal to the sum of the following: i. The maximum volume of oil that could be contained in a single piece of equipment serviced by the linked works. ii. The anticipated volume of storm water from a 24-hour duration, 25-year return storm to be collected by all the linked works. O. Reg. 234/26, s. 8 (2). (2.3) For the purposes of paragraph 1 of subsection (1), the design criteria established for a spill containment works that services a storage tank shall include achievement of the following: 1. If the spill containment works is servicing a single storage tank, a spill containment volume that is, at a minimum, equal to 110 per cent of the volumetric capacity of the storage tank. 2. If the spill containment works is servicing more than one storage tank, a spill containment volume that is, at a minimum, equal to the sum of the following: i. The volumetric capacity of the largest storage tank serviced by the works. ii. The greater of the following: A. Ten per cent of the volumetric capacity of the largest storage tank serviced by the works. B. Ten per cent of the combined volumetric capacity of every storage tank serviced by the works, excluding the largest storage tank. O. Reg. 234/26, s. 8 (2). (3) The section titled “Design” shall contain engineering drawings prepared, dated, signed and sealed by a licensed engineering practitioner, of the following: 1. The storm water management works. 2. Design details of the works. 3. The pre-development and post-development catchment areas, including labels for the sizes of those areas and associated runoff coefficient or imperviousness. O. Reg. 137/25, s. 10 (3).
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.