renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09
Section 48
Class 1 and 2 anaerobic digestion facilities, greater than 500 kW
Cite as renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09, s. 48 · current to November 11, 2026 · consolidated from July 28, 2026 · read from e-Laws on November 16, 2026
The text
(1) This section applies to a person who is constructing, installing or expanding a Class 1 or Class 2 anaerobic digestion facility that has a name plate capacity of greater than 500 kW. O. Reg. 359/09, s. 48 (1).
(2) Subject to subsections (3) and (4), no person shall construct, install or expand a facility mentioned in subsection (1) unless the following conditions are met:
1. All biomass storage areas, farm material storage areas, digestate storage tanks, generating units, flares and anaerobic digesters of the facility must be located at a distance of at least 250 metres from the nearest odour receptor.
2. The facility must be designed to be equipped with an anaerobic digester that has a gas storage cover with a design permeability of less than 500 cm3/m2/day/bar.
3. Subject to paragraph 1, if the facility is designed to be equipped with,
i. any digestate storage tanks storing liquid digestate, the tanks storing liquid digestate with a total storage volume set out in Column 1 of Table 2 must be located at a distance from the nearest odour receptor that is equal to or greater than the distance set out opposite the volume in Column 2 of that Table, and
ii. any digestate storage tanks storing solid digestate, the tanks storing solid digestate with a total storage volume set out in Column 1 of Table 3 must be located at a distance from the nearest odour receptor that is equal to or greater than the distance set out opposite the volume in Column 2 of that Table.
4. Subject to paragraph 1, if the facility is designed to be equipped with flares, they must be located at a distance from the nearest odour receptor that is equal to or greater than the greatest distance at which any digestate storage tank is required to be located from the nearest odour receptor under paragraph 3.
5. The facility must be designed to operate with a minimum average monthly input of five per cent manure. O. Reg. 359/09, s. 48 (2).
(3) Paragraphs 2, 3, 4 and 5 of subsection (2) do not apply if the facility has been designed to minimize the discharge of odour to at least the same extent as if the conditions set out in those paragraphs were met. O. Reg. 359/09, s. 48 (3).
(4) Subsection (2) does not apply in respect of a project mentioned in subsection (1) if, as part of the application for the issue of a renewable energy approval in respect of the renewable energy project, the applicant submits the following reports prepared in accordance with Table 1:
1. Emission summary and dispersion modelling report.
2. Noise study report.
3. Odour study report. O. Reg. 359/09, s. 48 (4).
(5) Subsection (2) does not apply in respect of an odour receptor that did not exist when the person proposing to construct, install or expand a facility mentioned in subsection (1) submitted an application for the issue of a renewable energy approval to the Director. O. Reg. 521/10, s. 28.
Read the renewable energy approvals under Part V.0.1 of the Act on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.