Pipeline Filing, N.B. Reg. 2006-3

Section 6

Small additions to pipelines

Cite as Pipeline Filing, N.B. Reg. 2006-3, s. 6 · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) Unless the Board otherwise directs, an application for a permit under Part 2 of the Act in respect of a small addition to a pipeline shall be accompanied by the information required by subsections (2) to (13). (2) For each application in respect of a small addition to a pipeline representing a project worth over $500,000, the application shall include the purpose and justification for the proposed installations and, where applicable, (a) an economic evaluation of the project and its alternatives; and (b) transportation service agreements related to additional throughput. (3) The application in respect of a small addition to a pipeline shall include evidence that the pipeline and installations are necessary and a cost-effective method of providing the required service, that the pipeline and installations are designed in accordance with all applicable regulations and that the pipeline and installations provide for the safety of the public, pipeline employees and the environment. (4) For each project in respect of a small addition to a pipeline the application shall include (a) the project number or descriptor, the location and a technical description, which shall include plan layouts and preliminary drawings; (b) where applicable, a construction schedule; (c) a list of the applicable regulations, standards, codes and specifications to be used, indicating the date of issue; (d) a description of any new or modified building; (e) the estimated project cost; and (f) an estimate of the capital costs classified in accordance with the following categories: (i) pipelines, (ii) compression, (iii) measuring and regulating, (iv) other installations, (v) system operation and engineering, showing separately a breakdown of the main elements of costs, such as materials, installation and land, and land rights. (5) Where the application in respect of a small addition to a pipeline includes installations required to replace existing pipe, to accommodate a change of service, or to upgrade existing installations, the application shall contain (a) a description of the mechanical properties and condition of the existing pipe; (b) the results of any programs, surveys, or studies which indicate the present condition of the pipe; and (c) the future plans for any redundant pipe. (6) Where the pipeline to which small additions are proposed includes major pressure-regulating installations, the application shall contain (a) a description of the regulating equipment proposed, including the type, size and capacity of the equipment; an explanation of the failure mode of the regulating equipment and the type, size, capacity and action of protective devices installed to prevent overpressure in the event of the failure of the primary equipment; (b) the maximum daily throughput; and (c) the maximum inlet and outlet pressures. (7) Where the pipeline to which small additions are proposed includes additional measurement installations, the application shall contain (a) the size, type, number of meters, nominal capacity range and expected accuracy of all measurement equipment; and (b) the minimum and maximum pressures and volumes, and the average annual volumes forecast over the design period. (8) Where the pipeline to which small additions are proposed includes odourant injection installations, the application shall contain (a) complete information, including material safety data sheets, for the odourant proposed, the minimum and maximum concentration to be attained and the manner in which it will be metered and measured; and (b) a preliminary description of the odourant equipment, indicating the size, type and capacity of the equipment proposed. (9) Where the pipeline to which small additions are proposed utilizes storage facilities, the application shall contain (a) a general description of the equipment to be used in conjunction with the proposed installations; (b) the storage capacity, the system capacity and the calculations supporting the design and the applicant’s share of such storage and system capacity; (c) the projected peak day, seasonal and annual demand and the applicant’s share of these demands; (d) a description of the interconnections between the applicant’s pipeline and the storage facilities; and (e) the applicant’s proposed plan for utilizing the storage facilities both in normal operations and in an emergency. (10) Where the project involves directional drilling, or trenchless construction methods, other than conventional boring or jacking of road or utility crossings, or installation of service lines, the application shall include (a) a geotechnical assessment of the crossing site; (b) with respect to the drilling guidance system (i) the expected accuracy of the down-hole guidance system, (ii) a description of external factors which could affect the accuracy of the proposed guidance system, (iii) the maximum distance from the target that the pilot hole could exit, and (iv) the contingency measures to be employed in the event that inaccuracies with the guidance system are detected; (c) information which demonstrates the ability to complete the proposed directionally drilled crossing in a timely fashion, including, but not limited to, (i) the maximum allowable stress that will be exerted on the pipe as a result of the proposed radius of curvature and the distance the pipe is to be pulled and the methods used to measure and control these stresses, (ii) the contingency plans to be employed in the event that pipe damage or collapse is experienced during the pipeline pull, and (iii) the amount of time required to replace the pipe in the event of pipe damage or collapse; (d) an assessment of the potential for adverse noise or vibrations to be generated during drilling operations; (e) the type, composition and toxicity of drilling fluid to be used; (f) with respect to drilling fluid handling and containment, a discussion of the potential for loss of drilling fluid containment due to the following situations: (i) inaccuracies with the drilling guidance system, (ii) abandoned pilot holes, (iii) inadvertent returns to the surface through unconsolidated beds, and (iv) mud displacement during the pipe pull section; (g) a description of the proposed method of drilling fluid disposal; and (h) in the case of a water crossing, evidence that the applicant has complied, or is in the process of complying, with the Watercourse Alteration Regulation under the Clean Water Act. (11) The application shall include a brief description of the applicant’s plans to comply with requirements of the Pipeline Regulation - Pipeline Act, 2005, including the requirement to have operation and maintenance manuals, emergency response manuals and a schedule indicating when these requirements will be met. (12) The application shall contain information on the applicant’s ability to finance the proposed additional installations, including, with respect to the total estimated cost of the proposed installations, the method of financing and the estimated impact on rates for the first full year that the installations are in service. (13) The application shall set out the name, address and full New Brunswick telephone number, fax number and e-mail address of the applicant and the names and similar coordinates of the principal officers.
Read the Pipeline Filing on the Province's website ↗

Made under Pipeline Act, 2005, c. P-8.5.