Pipeline Filing, N.B. Reg. 2006-3
Section 5
Permits for pipelines
Cite as Pipeline Filing, N.B. Reg. 2006-3, s. 5 · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) Unless the Board otherwise directs, an application for a permit under Part 2 of the Act in respect of a pipeline shall be accompanied by the information required by subsections (2) to (14).
(2) The applicant shall file evidence that the project and installations are designed in accordance with all applicable regulations and that the pipeline and installations provide for the safety of the public and pipeline employees and the protection of the environment.
(3) With respect to engineering matters, the applicant shall file
(a) a description of the location, a technical description, preliminary drawings, a description of the area where the pipeline will be located, and a map having a scale of not less than 1:10,000 for a linear pipeline;
(b) a general description of the control and communication system and its capabilities;
(c) the hourly, daily, seasonal, and annual capabilities of the existing and the proposed pipeline, versus the current and the forecasted requirements, indicating any contracted interruptible quantities;
(d) the flow formulae or flow calculations used to determine the daily or hourly (as appropriate) capabilities of the proposed installations and the underlying assumptions and parameters, including a description of the substance properties;
(e) estimates of the length of pipe for each diameter, material, wall thickness and grade, based on
(i) the present land use along the route or in the area to be served, and
(ii) expected future development along the route or in the area to be served;
(f) a description and justification for the selection of pipeline materials, having regard to the location, expected operating stresses and design temperatures;
(g) a description of the types of protective coatings to be applied;
(h) a construction schedule; and
(i) a list of the applicable regulations, standards, codes and specifications to be used in the design, construction and operation of the installations, indicating the date of issue.
(4) Where the proposed pipeline is to be located in unstable or metastable soil, the application shall include
(a) an assessment of the geotechnical and geological hazards and geothermal regimes which may be encountered during construction and operation of the installations; and
(b) an assessment of the special designs and measures required to safeguard the pipeline.
(5) Where the proposed pipeline includes pressure-regulating installations, the application shall contain
(a) a description of the regulating equipment proposed, including the type, size and capacity of the equipment; an explanation of the failure mode of the regulating equipment and the type, size, capacity and action of protective devices installed to prevent overpressure in the event of the failure of the primary equipment;
(b) the maximum daily throughput; and
(c) the maximum inlet and outlet pressures.
(6) Where the proposed pipeline includes measurement installations, the application shall contain
(a) a preliminary description of the measurement equipment indicating the size, type, number of meters, nominal capacity range and expected accuracy; and
(b) the minimum and maximum pressures and volumes assumed for preliminary design purposes.
(7) Where the proposed pipeline includes odourant injection installations, the application shall contain
(a) complete information including material safety data sheets for the odourant proposed, the minimum and maximum concentration to be attained and the manner in which it will be metered and measured; and
(b) a preliminary description of the odourant equipment, indicating the size, type and capacity of the equipment proposed.
(8) Where the proposed pipeline utilizes storage facilities, the application shall contain
(a) a general description of the equipment to be used in conjunction with the proposed installations;
(b) the storage capacity, the system capacity and the calculations supporting the design and the applicant’s share of such storage and system capacity;
(c) the projected peak day, seasonal and annual demand and the applicant’s share of those demands;
(d) a description of the interconnections between the applicant’s pipeline and the storage facilities; and
(e) the applicant’s proposed plan for utilizing the storage facilities both in normal operations and in an emergency.
(9) Where the project involves directional drilling, or trenchless construction methods, other than conventional boring or jacking of road or utility crossings, or installation of service lines, the application shall contain
(a) a geotechnical assessment of the crossing site;
(b) with respect to the drilling guidance system
(i) the expected accuracy of the down-hole guidance system,
(ii) a description of external factors which could affect the accuracy of the proposed guidance system,
(iii) the maximum distance from the target that the pilot hole could exit, and
(iv) the contingency measures to be employed in the event that inaccuracies with the guidance system are detected;
(c) information which demonstrates the ability to complete the proposed directionally drilled crossing in a timely fashion, including, but not limited to,
(i) the maximum allowable stress that will be exerted on the pipe as a result of the proposed radius of curvature and the distance the pipe is to be pulled and the methods used to measure and control these stresses,
(ii) the contingency plans to be employed in the event that pipe damage or collapse is experienced during the pipeline pull, and
(iii) the amount of time required to replace the pipe in the event of pipe damage or collapse;
(d) an assessment of the potential for adverse noise or vibrations to be generated during drilling operations;
(e) the type, composition and toxicity of drilling fluid to be used;
(f) with respect to drilling fluid handling and containment, a discussion of the potential for loss of drilling fluid containment due to the following situations:
(i) inaccuracies with the drilling guidance system,
(ii) abandoned pilot holes,
(iii) inadvertent returns to the surface through unconsolidated beds, and
(iv) mud displacement during the pipe pull section;
(g) a description of the proposed method of drilling fluid disposal; and
(h) in the case of a water crossing, evidence that the applicant has complied, or is in the process of complying, with the Watercourse Alteration Regulation under the Clean Water Act.
(10) The applicant shall provide a brief description of any required installations to be constructed by others to accommodate the proposed installations.
(11) The application shall include a brief description of the applicant’s plans to comply with requirements outlined in the Pipeline Regulation - Pipeline Act, 2005, including the requirement to have operation and maintenance manuals, emergency response manuals and a schedule indicating when these requirements will be met.
(12) Evidence of the applicant’s ability to finance the proposed installations shall be included in the application.
(13) The application shall contain information pertaining to the financial position and structure of the applicant, and the proposed methods of financing, including
(a) audited financial statements for the most recent fiscal year, together with a general description of the applicant’s financial structure;
(b) a concise description of any restrictive provisions concerning future financing, capital structure changes, interest coverage or dividends that would affect the financing of the proposed installations;
(c) a description of any changes that have occurred after the date of the audit report on the financial statements referred to in paragraph (a) which would affect the financial position of the applicant; and
(d) a description of the intended method of financing the proposed installations, including evidence of financing, if available.
(14) The application shall set out the name, address and full New Brunswick telephone number, fax number and e-mail address of the applicant and the names and similar coordinates of the principal officers.