The text

(1) A processing facility permit holder must ensure that the engineering design and siting of a processing facility (a) are consistent with (i) the information and records given to the regulator under section 3 [application for processing facility permit], and (ii) the findings and recommendations of the reports referred to in section 4 (4) [required reports], and (b) conform to the codes and standards. (2) A processing facility permit holder must ensure that the engineering design of a processing facility includes designs for all of the following: (a) a storage system as described in section 8 [storage system]; (b) a source of emergency power that is sufficient to safely stop operating the processing facility and that is protected from hazards; (c) an emergency shutdown system that initiates and maintains a fail-safe condition until the permit holder takes appropriate action; (d) if recommended in a report under section 4 (4), a fire suppression system. (3) A processing facility permit holder must ensure that the engineering design of a processing facility includes, and conforms to the requirements of, the following programs: (a) a corrosion and erosion protection program that details the processes and procedures to monitor and manage the integrity of the processing facility; (b) a leak detection program that details the processes and procedures to detect, control and respond to leaks or unplanned releases from the processing facility. (4) A processing facility permit holder must ensure that ignited vent stacks and flares are sited so that the thermal radiation flux at the locations identified in column 1 of the applicable table in Schedule 1 does not exceed the maximum thermal radiation flux identified opposite those locations in column 2 of that table. (5) A processing facility permit holder must ensure that all equipment in the processing facility is designed and sited such that the equipment can be used safely under all operating conditions anticipated during the life cycle of the processing facility.
Read the Processing Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.