Groundwater Protection Regulation, B.C. Reg. 39/2016
Section 72
Alternative specifications for decommissioning wells
Cite as Groundwater Protection Regulation, B.C. Reg. 39/2016, s. 72 · last amended December 1, 2022 · read from BC Laws on November 17, 2026
The text
(1) If the person responsible for decommissioning a well determines, before decommissioning the well, that it is not practicable to comply with section 71 (1) (b), (d) or (e), (4) or (5), the person may decommission the well in accordance with alternative specifications prepared by a professional under subsection (2) of this section.
(2) A well referred to in subsection (1) may be decommissioned in accordance with alternative specifications in respect of section 71 (1) (b), (d) or (e), (4) or (5) if
(a) a professional who has competency in the field of hydrogeology or geotechnical engineering prepares alternative specifications for the decommissioning of the well that ensure that isolated groundwater from different aquifers, or from different water-bearing zones within an aquifer, remain isolated,
(b) the person responsible for decommissioning the well submits the alternative specifications to an engineer for acceptance by the engineer before the well is decommissioned,
(c) the engineer accepts in writing the alternative specifications, with any terms and conditions that the engineer may specify, and
(d) the person responsible decommissions the well in accordance with the alternative specifications accepted by the engineer under paragraph (c) and any terms and conditions specified by the engineer.
Read the Groundwater Protection Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.